Opening the dossier…
Opening the dossier…
Contractor dossier
251 projects on file, including joint ventures this contractor is part of.
Total projects
251
Total budget
₱20.9B
Average progress
81.5%
Completion rate
43.0%
Below 70%
Average risk score
64.5
High risk on average, out of 100
Flagged as unusual
32
12.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 148 | ₱12.2B | 62.4 | 24 | 81.4% |
| Region I | 45 | ₱2B | 70.6 | 4 | 79.7% |
| National Capital Region | 26 | ₱3B | 58.7 | 1 | 77.6% |
| Central Office | 23 | ₱2.9B | 71.3 | 1 | 95.6% |
| Region IV-A | 9 | ₱773.5M | 68.1 | 2 | 68.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 199 | ₱16.1B | 63.8 | 17 | 83.3% |
| Roads | 18 | ₱972.7M | 53.8 | 2 | 76.8% |
| Buildings and Facilities | 14 | ₱2B | 54.9 | 1 | 66.6% |
| GAA 2025 SSP | 8 | ₱772M | 94.4 | 7 | 72.8% |
| OTHER | 6 | ₱560.5M | 84.8 | 5 | 90.8% |
| GAA 2025 OO-2 | 5 | ₱475M | 92.4 | 0 | 70.9% |
| Bridges | 1 | ₱43.4M | 31.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0188CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CADAANAN CREEK (ANNEX 7), ANAO, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 37% | High risk95 | Flagged0.026 |
| 25CJ0216CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (ANNEX 6), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 68% | High risk95 | Flagged0.018 |
| 25CJ0163CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAKET-BAKET RIVER (ANNEX 8), MONCADA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 60% | High risk95 | Flagged0.022 |
| 25CJ0166CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UNGOT CREEK (ANNEX 18), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 84% | High risk95 | Flagged0.009 |
| 25CJ0219CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALOY RIVER (ANNEX 14), GERONA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 45% | High risk95 | Flagged0.023 |
| 25CJ0174CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER, SAN ISIDRO - SAN JOSE SECTION (ANNEX 6), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 100% | High risk94 | Flagged0.007 |
| 25CJ0200CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER, LEFT DIKE, BRILLANTE - ADUAS SECTION (ANNEX 9), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 89% | High risk93 | Flagged0.011 |
| 25C00358FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT A), PUROK 4, BARANGAY LAMBAKIN, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 65% | High risk93 | —-0.007 |
| 25CJ0083CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 1), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.4M | 72% | High risk93 | —-0.007 |
| 25CJ0116CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 3), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.5M | 78% | High risk93 | —-0.009 |
| 25CJ0114CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 2), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 70% | High risk92 | —-0.006 |
| 25CK0095REHABILITATION OF EARTH SLOPE DIKE, UPSTREAM OF BANGOT BRIDGE - BANGUT RIVER LEFT SIDE (SEGMENT C), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 70% | High risk92 | —-0.007 |
| 25CJ0217CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN ISIDRO CREEK (ANNEX 13), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | High risk91 | —-0.019 |
| 24CJ0399CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 23), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 82% | High risk90 | Flagged0.052 |
| 24CJ0400CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 24), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 87% | High risk90 | Flagged0.051 |
| 23C00374CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE B), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 99% | High risk88 | Flagged0.049 |
| 23C00373CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE A), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 100% | High risk88 | Flagged0.049 |
| 24AA0137CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CONSTRUCTION OF TARRAG-CARAMUANGEN ROAD LEADING TO DARNA FALLS, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱92.3M | 77% | High risk81 | Flagged0.028 |
| 25C00361FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT D), PUROK 5, BARANGAY MALIBAY, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 32% | High risk81 | —-0.005 |
| 25C00353FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT B), PUROK 5, BARANGAY MALIBAY, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 50% | High risk81 | —-0.009 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CJ0399CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 23), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 82% | High risk90 | Flagged0.052 |
| 24CJ0400CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 24), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 87% | High risk90 | Flagged0.051 |
| 23C00374CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE B), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 99% | High risk88 | Flagged0.049 |
| 23C00373CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE A), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 100% | High risk88 | Flagged0.049 |
| 24CJ0401CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAKA RIVER (SEGMENT 25), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.4M | 51% | High risk73 | Flagged0.034 |
| 23CG0299SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - REHABILITATION OF ERODED PAMPANGA RIVER BANK, CANSINALA, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱74.9M | 100% | High risk78 | Flagged0.030 |
| 24CJ0397CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAKA RIVER (SEGMENT 24), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.2M | 70% | High risk72 | Flagged0.030 |
| 24AA0137CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CONSTRUCTION OF TARRAG-CARAMUANGEN ROAD LEADING TO DARNA FALLS, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱92.3M | 77% | High risk81 | Flagged0.028 |
| 25CJ0188CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CADAANAN CREEK (ANNEX 7), ANAO, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 37% | High risk95 | Flagged0.026 |
| 24CK0200REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY LOURDES SECTION, PART A, BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 90% | High risk69 | Flagged0.024 |
| 24CK0201REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY LOURDES SECTION, PART B, BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱93.1M | 88% | High risk70 | Flagged0.024 |
| 24CK0198REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY LAWY SECTION, PART A, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.2M | 87% | High risk71 | Flagged0.024 |
| 25CJ0219CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALOY RIVER (ANNEX 14), GERONA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 45% | High risk95 | Flagged0.023 |
| 24CK0199REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY LAWY SECTION, PART B, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 93% | High risk71 | Flagged0.023 |
| 25CJ0163CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAKET-BAKET RIVER (ANNEX 8), MONCADA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 60% | High risk95 | Flagged0.022 |
| 23CC0477CONSTRUCTION OF RIVER PROTECTION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG LABANGAN CHANNEL, IBA O ESTE, CALUMPIT- IBA, HAGONOY SECTION, CALUMPIT AND HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 100% | High risk69 | Flagged0.020 |
| 22O00079REHABILITATION OF BEATA PUMPING STATION (PHASE II), PANDACAN, MANILA | Central Office | Flood Control Management Cluster | On-Going | ₱187.3M | 0% | High risk76 | Flagged0.020 |
| 25CJ0216CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (ANNEX 6), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 68% | High risk95 | Flagged0.018 |
| 24CK0197REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY CASTILLO SECTION, PART A, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 100% | High risk70 | Flagged0.018 |
| 25A00243ROAD WIDENING - TERTIARY ROADS - LAOAG-SARRAT-PIDDIG-SOLSONA RD - K0488 + 380 - K0489 + 449, K0489 + 977 - K0489 + 1017, K0490 + 157 - K0490 + 826, K0491 + 133 - K0491 + 553, K0492 + 060 - K0492 + 207,K0492 + 247.30 - K0492 + 248, K0492 + 326 - K0492 + 38 | Region I | Region I | On-Going | ₱246.4M | 15% | High risk71 | Flagged0.012 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CJ0188CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CADAANAN CREEK (ANNEX 7), ANAO, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 37% | High risk95 | Flagged0.026 |
| 2 | 25CJ0216CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (ANNEX 6), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 68% | High risk95 | Flagged0.018 |
| 3 | 25CJ0163CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAKET-BAKET RIVER (ANNEX 8), MONCADA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 60% | High risk95 | Flagged0.022 |
| 4 | 25CJ0166CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UNGOT CREEK (ANNEX 18), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 84% | High risk95 | Flagged0.009 |
| 5 | 25CJ0219CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALOY RIVER (ANNEX 14), GERONA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 45% | High risk95 | Flagged0.023 |
| 6 | 25CJ0174CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER, SAN ISIDRO - SAN JOSE SECTION (ANNEX 6), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 100% | High risk94 | Flagged0.007 |
| 7 | 25CJ0200CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER, LEFT DIKE, BRILLANTE - ADUAS SECTION (ANNEX 9), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 89% | High risk93 | Flagged0.011 |
| 8 | 25C00358FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT A), PUROK 4, BARANGAY LAMBAKIN, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 65% | High risk93 | —-0.007 |
| 9 | 25CJ0083CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 1), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.4M | 72% | High risk93 | —-0.007 |
| 10 | 25CJ0116CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 3), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.5M | 78% | High risk93 | —-0.009 |
| 11 | 25CJ0114CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 2), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 70% | High risk92 | —-0.006 |
| 12 | 25CK0095REHABILITATION OF EARTH SLOPE DIKE, UPSTREAM OF BANGOT BRIDGE - BANGUT RIVER LEFT SIDE (SEGMENT C), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 70% | High risk92 | —-0.007 |
| 13 | 25CJ0217CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN ISIDRO CREEK (ANNEX 13), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | High risk91 | —-0.019 |
| 14 | 24CJ0399CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 23), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 82% | High risk90 | Flagged0.052 |
| 15 | 24CJ0400CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 24), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 87% | High risk90 | Flagged0.051 |
| 16 | 23C00374CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE B), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 99% | High risk88 | Flagged0.049 |
| 17 | 23C00373CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE A), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 100% | High risk88 | Flagged0.049 |
| 18 | 24AA0137CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CONSTRUCTION OF TARRAG-CARAMUANGEN ROAD LEADING TO DARNA FALLS, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱92.3M | 77% | High risk81 | Flagged0.028 |
| 19 | 25C00361FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT D), PUROK 5, BARANGAY MALIBAY, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 32% | High risk81 | —-0.005 |
| 20 | 25C00353FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT B), PUROK 5, BARANGAY MALIBAY, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 50% | High risk81 | —-0.009 |
| 21 | 25C00360FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT C), PUROK 5, BARANGAY MALIBAY, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 54% | High risk81 | —-0.009 |
| 22 | 25C00352FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT A), PUROK 5, BARANGAY MALIBAY, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 50% | High risk81 | —-0.009 |
| 23 | 25CP0047FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER,SITIO LUWASAN,BRGY. AKLE, SAN ILDEFONSO, BULACAN (SEGMENT A) | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 50% | High risk81 | —-0.009 |
| 24 | 25CP0048FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER, SITIO LUWASAN, BRGY. AKLE, SAN ILDEFONSO, BULACAN (SEGMENT B) | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 60% | High risk81 | —-0.011 |
| 25 | 25C00348FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG MAASIM RIVER, PUROK 1, BRGY CASALAT, SAN ILDEFONSO, BULACAN (SEGMENT A) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 90% | High risk81 | —-0.023 |