Contractor dossier
251 projects on file, including joint ventures this contractor is part of.
Total projects
251
Total budget
₱20.9B
Average progress
81.5%
Completion rate
43.0%
Below 70%
Average risk score
64.5
High risk on average, out of 100
Flagged as unusual
32
12.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 148 | ₱12.2B | 62.4 | 24 | 81.4% |
| Region I | 45 | ₱2B | 70.6 | 4 | 79.7% |
| National Capital Region | 26 | ₱3B | 58.7 | 1 | 77.6% |
| Central Office | 23 | ₱2.9B | 71.3 | 1 | 95.6% |
| Region IV-A | 9 | ₱773.5M | 68.1 | 2 | 68.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 199 | ₱16.1B | 63.8 | 17 | 83.3% |
| Roads | 18 | ₱972.7M | 53.8 | 2 | 76.8% |
| Buildings and Facilities | 14 | ₱2B | 54.9 | 1 | 66.6% |
| GAA 2025 SSP | 8 | ₱772M | 94.4 | 7 | 72.8% |
| OTHER | 6 | ₱560.5M | 84.8 | 5 | 90.8% |
| GAA 2025 OO-2 | 5 | ₱475M | 92.4 | 0 | 70.9% |
| Bridges | 1 | ₱43.4M | 31.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0188CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CADAANAN CREEK (ANNEX 7), ANAO, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 37% | High risk95 | Flagged0.026 |
| 25CJ0216CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (ANNEX 6), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 68% | High risk95 | Flagged0.018 |
| 25CJ0163CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAKET-BAKET RIVER (ANNEX 8), MONCADA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 60% | High risk95 | Flagged0.022 |
| 25CJ0166CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UNGOT CREEK (ANNEX 18), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 84% | High risk95 | Flagged0.009 |
| 25CJ0219CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALOY RIVER (ANNEX 14), GERONA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 45% | High risk95 | Flagged0.023 |
| 25CJ0174CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER, SAN ISIDRO - SAN JOSE SECTION (ANNEX 6), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 100% | High risk94 | Flagged0.007 |
| 25CJ0200CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER, LEFT DIKE, BRILLANTE - ADUAS SECTION (ANNEX 9), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 89% | High risk93 | Flagged0.011 |
| 25C00358FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT A), PUROK 4, BARANGAY LAMBAKIN, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 65% | High risk93 | —-0.007 |
| 25CJ0083CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 1), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.4M | 72% | High risk93 | —-0.007 |
| 25CJ0116CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 3), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.5M | 78% | High risk93 | —-0.009 |
| 25CJ0114CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 2), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 70% | High risk92 | —-0.006 |
| 25CK0095REHABILITATION OF EARTH SLOPE DIKE, UPSTREAM OF BANGOT BRIDGE - BANGUT RIVER LEFT SIDE (SEGMENT C), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 70% | High risk92 | —-0.007 |
| 25CJ0217CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN ISIDRO CREEK (ANNEX 13), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | High risk91 | —-0.019 |
| 24CJ0399CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 23), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 82% | High risk90 | Flagged0.052 |
| 24CJ0400CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 24), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 87% | High risk90 | Flagged0.051 |
| 23C00374CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE B), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 99% | High risk88 | Flagged0.049 |
| 23C00373CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE A), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 100% | High risk88 | Flagged0.049 |
| 24AA0137CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CONSTRUCTION OF TARRAG-CARAMUANGEN ROAD LEADING TO DARNA FALLS, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱92.3M | 77% | High risk81 | Flagged0.028 |
| 25C00361FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT D), PUROK 5, BARANGAY MALIBAY, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 32% | High risk81 | —-0.005 |
| 25C00353FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT B), PUROK 5, BARANGAY MALIBAY, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 50% | High risk81 | —-0.009 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CJ0399CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 23), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 82% | High risk90 | Flagged0.052 |
| 24CJ0400CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 24), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 87% | High risk90 | Flagged0.051 |
| 23C00374CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE B), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 99% | High risk88 | Flagged0.049 |
| 23C00373CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE A), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 100% | High risk88 | Flagged0.049 |
| 24CJ0401CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAKA RIVER (SEGMENT 25), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.4M | 51% | High risk73 | Flagged0.034 |
| 23CG0299SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - REHABILITATION OF ERODED PAMPANGA RIVER BANK, CANSINALA, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱74.9M | 100% | High risk78 | Flagged0.030 |
| 24CJ0397CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAKA RIVER (SEGMENT 24), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.2M | 70% | High risk72 | Flagged0.030 |
| 24AA0137CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CONSTRUCTION OF TARRAG-CARAMUANGEN ROAD LEADING TO DARNA FALLS, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱92.3M | 77% | High risk81 | Flagged0.028 |
| 25CJ0188CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CADAANAN CREEK (ANNEX 7), ANAO, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 37% | High risk95 | Flagged0.026 |
| 24CK0200REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY LOURDES SECTION, PART A, BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 90% | High risk69 | Flagged0.024 |
| 24CK0201REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY LOURDES SECTION, PART B, BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱93.1M | 88% | High risk70 | Flagged0.024 |
| 24CK0198REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY LAWY SECTION, PART A, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.2M | 87% | High risk71 | Flagged0.024 |
| 25CJ0219CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALOY RIVER (ANNEX 14), GERONA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 45% | High risk95 | Flagged0.023 |
| 24CK0199REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY LAWY SECTION, PART B, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 93% | High risk71 | Flagged0.023 |
| 25CJ0163CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAKET-BAKET RIVER (ANNEX 8), MONCADA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 60% | High risk95 | Flagged0.022 |
| 23CC0477CONSTRUCTION OF RIVER PROTECTION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG LABANGAN CHANNEL, IBA O ESTE, CALUMPIT- IBA, HAGONOY SECTION, CALUMPIT AND HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 100% | High risk69 | Flagged0.020 |
| 22O00079REHABILITATION OF BEATA PUMPING STATION (PHASE II), PANDACAN, MANILA | Central Office | Flood Control Management Cluster | On-Going | ₱187.3M | 0% | High risk76 | Flagged0.020 |
| 25CJ0216CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (ANNEX 6), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 68% | High risk95 | Flagged0.018 |
| 24CK0197REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY CASTILLO SECTION, PART A, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 100% | High risk70 | Flagged0.018 |
| 25A00243ROAD WIDENING - TERTIARY ROADS - LAOAG-SARRAT-PIDDIG-SOLSONA RD - K0488 + 380 - K0489 + 449, K0489 + 977 - K0489 + 1017, K0490 + 157 - K0490 + 826, K0491 + 133 - K0491 + 553, K0492 + 060 - K0492 + 207,K0492 + 247.30 - K0492 + 248, K0492 + 326 - K0492 + 38 | Region I | Region I | On-Going | ₱246.4M | 15% | High risk71 | Flagged0.012 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 226 | 23CK0046REHABILITATION OF DIKE ALONG O'DONNELL RIVER DOWNSTREAM OF BUENO BRIDGE 1, LEFT BANK, STA. 9+983.00 TO STA. 10+303.00, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱72.4M | 100% | Medium risk35 | —-0.083 |
| 227 | 23CK0048REHABILITATION OF DIKE ALONG O'DONNELL RIVER DOWNSTREAM OF BUENO BRIDGE 1, LEFT BANK, STA. 8+264.80 TO STA. 8+564.00, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱72.3M | 100% | Medium risk35 | —-0.083 |
| 228 | 23CC0217CONSTRUCTION OF RIVER PROTECTION ALONG BOCAUE RIVER, K001+370 TO K001+570, BARANGAY TAAL, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.091 |
| 229 | 23CC0209CONSTRUCTION OF RIVER PROTECTION ALONG BALAGTAS RIVER, K013+060 TO K013+164, SAN JUAN SECTION, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.091 |
| 230 | 20CH0018CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - IMPROVEMENT/REHABILITATION OF DIKE ALONG GPDC STA. CRUZ, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱47.8M | 100% | Medium risk33 | —-0.089 |
| 231 | 20CG0213CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: LOCAL ROADS - CONSTRUCTION OF QUEZON ROAD - JOSE ABAD SANTOS AVENUE BYPASS ROAD, MEXICO, PAMPANGA (PHASE 1) | Region III | Pampanga 1st DEO | Completed | ₱46.4M | 100% | Medium risk33 | —-0.103 |
| 232 | 23CC0208CONSTRUCTION OF RIVER PROTECTION ALONG BALAGTAS RIVER, K001+260 TO K001+460, BARANGAY PULONG GUBAT, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.092 |
| 233 | 22CK0103REHABILITATION OF EXISTING DIKE ALONG O'DONNELL RIVER, (STA. LUCIA SECTION, RIGHT BANK) STA. 10+820.00 TO STA. 11+102.80, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.088 |
| 234 | 21CK0093REHABILITATION OF EXISTING DIKE ALONG O'DONNELL RIVER (STA.LUCIA SECTION, RIGHT BANK), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.088 |
| 235 | 21CK0094REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG PARUA RIVER (CASTILLO SECTION, LEFT BANK), CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱48.9M | 100% | Medium risk32 | —-0.093 |
| 236 | 22CH0042CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG PASAK RIVER, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱48.8M | 100% | Medium risk32 | —-0.092 |
| 237 | 22CK0102REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG LUCUNG RIVER (MAGAO SECTION, RIGHT BANK), STA. 11+960.00 TO STA. 12+202.00, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱50.2M | 100% | Medium risk32 | —-0.089 |
| 238 | 19CH0028CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RETAINING WALL ALONG UPPER DALAN BAPOR, SAN ANTONIO SECTION, SASMUAN, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.091 |
| 239 | 23CC0210CONSTRUCTION OF RIVER PROTECTION ALONG GUIGUINTO RIVER, K005+750 TO K005+950, BARANGAY ILANG-ILANG, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱47M | 100% | Medium risk31 | —-0.091 |
| 240 | 20CH0073REHABILITATION OF FLOOD MITIGATION STRUCTURES ALONG PASIG - POTRERO RIVER UPSTREAM OF SCTEX BRIDGE (PHASE 1), STA. 0+000 - STA. 0+275.95, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱47M | 100% | Medium risk31 | —-0.088 |
| 241 | 21CH0118BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - REPAIR/REHABILITATION OF A PERMANENT WEAK BRIGE MARIMLA BR. (B01530LZ) ALONG LUBAO DIVERSION ROAD, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱43.4M | 100% | Medium risk31 | —-0.062 |
| 242 | 18CH0089CONCRETING OF ROAD, SITIO REMEDIOS BRGY. SAN NICOLAS, SASMUAN, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱9.4M | 100% | Medium risk30 | —-0.105 |
| 243 | 21CK0035REHABILITATION OF EXISTING DIKE ALONG O'DONNELL RIVER (STA. LUCIA SECTION, RIGHT BANK), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱29.4M | 100% | Low risk30 | —-0.089 |
| 244 | 24CG0024FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG PAMPANGA RIVER, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.6M | 100% | Low risk29 | —-0.094 |
| 245 | 18CH0014CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONCRETING/IMPROVEMENT OF TOP DIKE ALONG SAPANG LABUAN, SAN PEDRO, SASMUAN, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱44.1M | 100% | Low risk29 | —-0.091 |
| 246 | 18CH0162REHABILITATION/RECONSTRUCTION/UPGRADING OF ROAD BARANGAY STO. TOMAS, SASMUAN, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱4.7M | 100% | Low risk22 | —-0.046 |
| 247 | 18CH0058UPGRADING/CONCRETING OF ROAD, BRGY. STA. MONICA, SASMUAN, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱3.6M | 100% | Low risk14 | —-0.103 |
| 248 | 18CH0015UPGRADING/CONCRETING OF ROAD, BRGY. STO. TOMAS, SASMUAN, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱4.7M | 100% | Low risk13 | —-0.105 |
| 249 | 19CH0024CONCRETING OF ROAD, BRGY. STO. TOMAS, SASMUAN, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱2M | 100% | Low risk12 | —-0.099 |
| 250 | 24CG0237BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY SANTA RITA, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱2.9M | 100% | Low risk12 | —-0.106 |