251 projects on file, including joint ventures this contractor is part of.
Total projects
251
Total budget
₱20.9B
Average progress
81.5%
Completion rate
43.0%
Below 70%
Average risk score
64.5
High risk on average, out of 100
Flagged as unusual
32
12.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 148 | ₱12.2B | 62.4 | 24 | 81.4% |
| Region I | 45 | ₱2B | 70.6 | 4 | 79.7% |
| National Capital Region | 26 | ₱3B | 58.7 | 1 | 77.6% |
| Central Office | 23 | ₱2.9B | 71.3 | 1 | 95.6% |
| Region IV-A | 9 | ₱773.5M | 68.1 | 2 | 68.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 199 | ₱16.1B | 63.8 | 17 | 83.3% |
| Roads | 18 | ₱972.7M | 53.8 | 2 | 76.8% |
| Buildings and Facilities | 14 | ₱2B | 54.9 | 1 | 66.6% |
| GAA 2025 SSP | 8 | ₱772M | 94.4 | 7 | 72.8% |
| OTHER | 6 | ₱560.5M | 84.8 | 5 | 90.8% |
| GAA 2025 OO-2 | 5 | ₱475M | 92.4 | 0 | 70.9% |
| Bridges | 1 | ₱43.4M | 31.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0188CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CADAANAN CREEK (ANNEX 7), ANAO, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 37% | High risk95 | Flagged0.026 |
| 25CJ0216CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (ANNEX 6), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 68% | High risk95 | Flagged0.018 |
| 25CJ0163CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAKET-BAKET RIVER (ANNEX 8), MONCADA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 60% | High risk95 | Flagged0.022 |
| 25CJ0166CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UNGOT CREEK (ANNEX 18), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 84% | High risk95 | Flagged0.009 |
| 25CJ0219CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALOY RIVER (ANNEX 14), GERONA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 45% | High risk95 | Flagged0.023 |
| 25CJ0174CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER, SAN ISIDRO - SAN JOSE SECTION (ANNEX 6), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 100% | High risk94 | Flagged0.007 |
| 25CJ0200CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER, LEFT DIKE, BRILLANTE - ADUAS SECTION (ANNEX 9), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 89% | High risk93 | Flagged0.011 |
| 25C00358FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT A), PUROK 4, BARANGAY LAMBAKIN, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 65% | High risk93 | —-0.007 |
| 25CJ0083CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 1), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.4M | 72% | High risk93 | —-0.007 |
| 25CJ0116CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 3), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.5M | 78% | High risk93 | —-0.009 |
| 25CJ0114CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMILING RIVER, MAYANTOC SECTION (SEGMENT 2), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 70% | High risk92 | —-0.006 |
| 25CK0095REHABILITATION OF EARTH SLOPE DIKE, UPSTREAM OF BANGOT BRIDGE - BANGUT RIVER LEFT SIDE (SEGMENT C), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 70% | High risk92 | —-0.007 |
| 25CJ0217CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN ISIDRO CREEK (ANNEX 13), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | High risk91 | —-0.019 |
| 24CJ0399CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 23), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 82% | High risk90 | Flagged0.052 |
| 24CJ0400CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 24), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 87% | High risk90 | Flagged0.051 |
| 23C00374CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE B), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 99% | High risk88 | Flagged0.049 |
| 23C00373CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE A), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 100% | High risk88 | Flagged0.049 |
| 24AA0137CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CONSTRUCTION OF TARRAG-CARAMUANGEN ROAD LEADING TO DARNA FALLS, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱92.3M | 77% | High risk81 | Flagged0.028 |
| 25C00361FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT D), PUROK 5, BARANGAY MALIBAY, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 32% | High risk81 | —-0.005 |
| 25C00353FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT B), PUROK 5, BARANGAY MALIBAY, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 50% | High risk81 | —-0.009 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CJ0399CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 23), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 82% | High risk90 | Flagged0.052 |
| 24CJ0400CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DUNGUN CREEK (PACKAGE 24), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 87% | High risk90 | Flagged0.051 |
| 23C00374CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE B), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 99% | High risk88 | Flagged0.049 |
| 23C00373CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-REHAB. OF EXISTING DIKE ALONG BANGUT RIVER UPSTREAM OF BANGOT BRIDGE, RIGHT SIDE (PACKAGE A), CAPAS, TARLAC | Region III | Region III | On-Going | ₱96.5M | 100% | High risk88 | Flagged0.049 |
| 24CJ0401CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAKA RIVER (SEGMENT 25), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.4M | 51% | High risk73 | Flagged0.034 |
| 23CG0299SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - REHABILITATION OF ERODED PAMPANGA RIVER BANK, CANSINALA, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱74.9M | 100% | High risk78 | Flagged0.030 |
| 24CJ0397CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAKA RIVER (SEGMENT 24), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.2M | 70% | High risk72 | Flagged0.030 |
| 24AA0137CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CONSTRUCTION OF TARRAG-CARAMUANGEN ROAD LEADING TO DARNA FALLS, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱92.3M | 77% | High risk81 | Flagged0.028 |
| 25CJ0188CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CADAANAN CREEK (ANNEX 7), ANAO, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 37% | High risk95 | Flagged0.026 |
| 24CK0200REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY LOURDES SECTION, PART A, BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 90% | High risk69 | Flagged0.024 |
| 24CK0201REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY LOURDES SECTION, PART B, BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱93.1M | 88% | High risk70 | Flagged0.024 |
| 24CK0198REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY LAWY SECTION, PART A, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.2M | 87% | High risk71 | Flagged0.024 |
| 25CJ0219CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALOY RIVER (ANNEX 14), GERONA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 45% | High risk95 | Flagged0.023 |
| 24CK0199REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY LAWY SECTION, PART B, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 93% | High risk71 | Flagged0.023 |
| 25CJ0163CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAKET-BAKET RIVER (ANNEX 8), MONCADA, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 60% | High risk95 | Flagged0.022 |
| 23CC0477CONSTRUCTION OF RIVER PROTECTION STRUCTURE AND IMPROVEMENT OF WATERWAYS ALONG LABANGAN CHANNEL, IBA O ESTE, CALUMPIT- IBA, HAGONOY SECTION, CALUMPIT AND HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 100% | High risk69 | Flagged0.020 |
| 22O00079REHABILITATION OF BEATA PUMPING STATION (PHASE II), PANDACAN, MANILA | Central Office | Flood Control Management Cluster | On-Going | ₱187.3M | 0% | High risk76 | Flagged0.020 |
| 25CJ0216CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (ANNEX 6), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 68% | High risk95 | Flagged0.018 |
| 24CK0197REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY CASTILLO SECTION, PART A, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 100% | High risk70 | Flagged0.018 |
| 25A00243ROAD WIDENING - TERTIARY ROADS - LAOAG-SARRAT-PIDDIG-SOLSONA RD - K0488 + 380 - K0489 + 449, K0489 + 977 - K0489 + 1017, K0490 + 157 - K0490 + 826, K0491 + 133 - K0491 + 553, K0492 + 060 - K0492 + 207,K0492 + 247.30 - K0492 + 248, K0492 + 326 - K0492 + 38 | Region I | Region I | On-Going | ₱246.4M | 15% | High risk71 | Flagged0.012 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 24DH0033CONSTRUCTION OF RIVER CONTROL ALONG BALANAC RIVER, BRGY. MAULAWIN, PAGSANJAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱93.6M | 100% | High risk65 | —-0.075 |
| 152 | 20O00026CONSTRUCTION OF UP DILIMAN COLLEGE OF ARTS AND LETTERS (CAL) BUILDING, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱556.1M | 94% | High risk65 | —-0.003 |
| 153 | 24O00043CONSTRUCTION OF UNIVERSITY OF THE PHILIPPINES (UP) DILIMAN COLLEGE OF ARTS AND LETTERS (CAL) BUILDING, PHASE 3, DILIMAN, QUEZON CITY (RE-ADVERTISEMENT) | National Capital Region | National Capital Region | On-Going | ₱282.5M | 0% | High risk65 | Flagged0.006 |
| 154 | 23O00023CONSTRUCTION OF UNIVERSITY OF THE PHILIPPINES (UP) DILIMAN COLLEGE OF ARTS AND LETTERS (CAL) BUILDING, PHASE 2, DILIMAN, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱282.5M | 64% | High risk65 | —-0.006 |
| 155 | 23DD0225ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT ALONG LAWAYA RIVE | Region IV-A | Batangas 4th DEO | Completed | ₱93.6M | 100% | High risk65 | —-0.077 |
| 156 | 22O00033CONSTRUCTION OF NEW CITY PROSECUTORS BUILDING, CITY HALL COMPOUND, DILIMAN, QUEZON CITY (PHASE II) | National Capital Region | National Capital Region | On-Going | ₱193M | 69% | High risk65 | —-0.009 |
| 157 | 21O00065CONSTRUCTION OF NEW CITY PROSECUTOR'S BUILDING, CITY HALL COMPOUND DILIMAN, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱144.7M | 100% | High risk65 | —-0.024 |
| 158 | 23Z00018CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONGUPPER MARIKINA RIVER (FLOOD CONTROL WORKS)PHASE I, BRGY. STA. ANA, SAN MATEO, RIZAL | Central Office | Flood Control Management Cluster | On-Going | ₱96.5M | 100% | High risk64 | —-0.066 |
| 159 | 23Z00022CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONGBULI CREEK (PHASE 2), BARANGAY SAN ANDRES, CAINTA, RIZAL | Central Office | Flood Control Management Cluster | Completed | ₱96.4M | 100% | High risk64 | —-0.100 |
| 160 | 24D00103CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGUNA LAKESHORE AT BARANGAY SAN ANTONIO, PHASE II, BAY, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱96.5M | 89% | High risk64 | —-0.033 |
| 161 | 24D00091CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGUNA LAKESHORE AT BARANGAY PAG-ASA, PHASE II, MABITAC, LAGUNA | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 162 | 23Z00013CONSTRUCTION OF SLOPE PROTECTION ALONG SACOBIA-BAMBAN RIVER, BARANGAY SAN PEDRO, BAMBAN, TARLAC, PROVINCE OF TARLAC | Central Office | Flood Control Management Cluster | On-Going | ₱96M | 100% | High risk64 | —-0.060 |
| 163 | 19O00035CONSTRUCTION OF MULTI-PURPOSE BUILDING, (ICURP AUDITORIUM), E. JACINTO ST., UP DILIMAN, QUEZON CITY | National Capital Region | National Capital Region | Completed | ₱119M | 100% | High risk63 | —-0.061 |
| 164 | 23O00024CONSTRUCTION OF NEW BUILDING UP DILIMAN (INSTITUTE OF ISLAMIC STUDIES COMPLEX), DILIMAN, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱94.4M | 0% | High risk63 | —-0.009 |
| 165 | 24O00040CONSTRUCTION OF NEW PROSECUTORS BUILDING, CITY HALL COMPOUND, DILIMAN, QUEZON CITY (PHASE IV) | National Capital Region | National Capital Region | On-Going | ₱94.3M | 22% | High risk63 | —-0.020 |
| 166 | 21O00057CONSTRUCTION OF NEW BUILDING UP DILIMAN (INSTITUTE OF ISLAMIC STUDIES COMPLEX), DILIMAN, QUEZON CITY | National Capital Region | National Capital Region | Completed | ₱96.4M | 100% | High risk63 | —-0.069 |
| 167 | 25CJ0218CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA LUCIA RIVER (ANNEX 8), PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.4M | 22% | High risk62 | —-0.020 |
| 168 | 25CJ0172CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MASALASA CREEK (ANNEX 17), CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | On-Going | ₱93.4M | 92% | High risk61 | —-0.045 |
| 169 | 25CK0106REHABILITATION OF EARTH SLOPE DIKE, UPSTREAM OF BANGOT BRIDGE - BANGUT RIVER RIGHT SIDE (SEGMENT C), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱93.1M | 48% | High risk60 | —-0.031 |
| 170 | 24CG0005FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG PAMPANGA RIVER, SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱93.6M | 100% | Medium risk60 | —-0.080 |
| 171 | 20CM0081CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE OF EBB CHANNEL TO BANICAIN CHANNEL OF SUBIC BAY FREEPORT ZONE, OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱94.6M | 100% | Medium risk60 | —-0.076 |
| 172 | 25CG0018FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK (PHASE I), BARANGAY TABUYUC, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 68% | Medium risk59 | —-0.028 |
| 173 | 25CG0017FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG PAMPANGA RIVER BANK, BARANGAY SUCAD, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 71% | Medium risk59 | —-0.030 |
| 174 | 25CG0030FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK (PHASE II), BARANGAY TABUYUC APALIT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 80% | Medium risk59 | —-0.034 |
| 175 | 25CJ0053CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SUSUBAEN CREEK (SEGMENT 30), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 80% | Medium risk59 | —-0.037 |