Contractor dossier
80 projects on file, including joint ventures this contractor is part of.
Total projects
80
Total budget
₱5.3B
Average progress
89.8%
Completion rate
56.3%
Below 70%
Average risk score
59.6
Medium risk on average, out of 100
Flagged as unusual
11
13.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 80 | ₱5.3B | 59.6 | 11 | 89.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 47 | ₱3.6B | 62.3 | 2 | 91.1% |
| Buildings and Facilities | 12 | ₱181.9M | 33.2 | 1 | 91.7% |
| Flood Control and Drainage | 8 | ₱465.4M | 53.3 | 1 | 96.4% |
| OTHER | 6 | ₱296.8M | 80.3 | 3 | 72.3% |
| GAA 2025 OO-2 | 3 | ₱423.8M | 93.5 | 3 | 71.0% |
| Bridges | 3 | ₱185.7M | 60.8 | 1 | 100.0% |
| Bridges, Roads | 1 | ₱95.3M | 72.0 | 0 | 90.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25J00033CONSTRUCTION / REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINSAND PRINCIPAL RIVERS - CONSTRUCTION OF FLOODCONTROL STRUCTURE ALONG KABASALAN RIVER,PHASE V, PACKAGE 3, BARANGAY F.L. PENA,KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱141.6M | 69% | High risk93 | Flagged0.007 |
| 25J00035CONSTRUCTION / REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINSAND PRINCIPAL RIVERS - CONSTRUCTION OF FLOODCONTROL STRUCTURE ALONG KABASALAN RIVER,PHASE V, PACKAGE 2, BARANGAY F.L. PENA,KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱140.7M | 70% | High risk93 | Flagged0.007 |
| 25J00034CONSTRUCTION / REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINSAND PRINCIPAL RIVERS - CONSTRUCTION OF FLOODCONTROL STRUCTURE ALONG KABASALAN RIVER,PHASE V, PACKAGE 4, BARANGAY F.L. PENA,KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱141.5M | 73% | High risk93 | Flagged0.006 |
| 24J00248CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RURAL HEALTH UNIT, TUNGAWAN SUPER HEALTH CENTER, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱11.3M | 92% | High risk87 | Flagged0.052 |
| 23J00067CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BUENAVISTA - BOLONG BY-PASS ROAD, PACKAGE 5, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱98.6M | 17% | High risk84 | Flagged0.049 |
| 23J00066CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BUENAVISTA - BOLONG BY-PASS ROAD, PACKAGE 4, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱98.6M | 25% | High risk84 | Flagged0.046 |
| 20JF0089BUAYAN BR. (PARALLEL BR.) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱20.6M | 100% | High risk76 | —-0.030 |
| 20JF0011WIDENING OF PERMANENT BRIDGES - BUAYAN BR. II (PARALLEL BR.) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD K1775+139.00 - K1775+202.84 | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱21.8M | 100% | High risk76 | —-0.029 |
| 17JF0001CONCRETING OF LABASAN-CAMANGA RD., SIAY, ZAMBO. SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱45.8M | 100% | High risk75 | —-0.020 |
| 23J00131CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA-BOLONG BY-PASS ROAD, PACKAGE 8, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143M | 90% | High risk75 | —-0.021 |
| 24J00008CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG BY-PASS ROAD, PACKAGE 12, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱154.1M | 90% | High risk75 | —-0.022 |
| 20J00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG BYPASS ROAD, PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱133.8M | 100% | High risk74 | —-0.001 |
| 23J00134CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG BY-PASS ROAD, PACKAGE 11, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱131M | 62% | High risk74 | —-0.013 |
| 23J00133CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA-BOLONG BY-PASS ROAD, PACKAGE 10, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱136.2M | 40% | High risk74 | —-0.009 |
| 22J00057CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL STRUCTURE ALONG TUNGAWAN RIVER (PHASE IV), TUNGAWAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱105M | 81% | High risk74 | Flagged0.002 |
| 20J00035CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL ALONG TUNGAWAN RIVER (PHASE II), TUNGAWAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱99.6M | 100% | High risk74 | —-0.002 |
| 21J00018CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL ALONG TUNGAWAN RIVER (PHASE III), TUNGAWAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱103.9M | 100% | High risk74 | —-0.005 |
| 23J00041CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL STRUCTURE ALONG TUNGAWAN RIVER (PHASE V), TUNGAWAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱105.1M | 90% | High risk74 | —-0.010 |
| 20J00043CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG BYPASS ROAD, PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱128.3M | 100% | High risk73 | —-0.002 |
| 18J00015CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG COASTAL BYPASS ROAD (CURUAN - LUBIGAN SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱127.7M | 100% | High risk73 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24J00248CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RURAL HEALTH UNIT, TUNGAWAN SUPER HEALTH CENTER, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱11.3M | 92% | High risk87 | Flagged0.052 |
| 23J00067CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BUENAVISTA - BOLONG BY-PASS ROAD, PACKAGE 5, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱98.6M | 17% | High risk84 | Flagged0.049 |
| 23J00066CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BUENAVISTA - BOLONG BY-PASS ROAD, PACKAGE 4, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱98.6M | 25% | High risk84 | Flagged0.046 |
| 17JH0081CONSTRUCTION OF ONE (1) UNIT 1-STOREY 3-CL SCHOOL BUILDING @ BADJAO FLOATING ELEMENTARY SCHOOL | Region IX | Isabela City DEO | Completed | ₱5.2M | 0% | Medium risk40 | Flagged0.025 |
| 19J00013REPLACEMENT OF PERMANENT WEAK BRIDGE - VITALI BRIDGE (PARALLEL BRIDGE) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱89.6M | 100% | High risk67 | Flagged0.017 |
| 25J00033CONSTRUCTION / REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINSAND PRINCIPAL RIVERS - CONSTRUCTION OF FLOODCONTROL STRUCTURE ALONG KABASALAN RIVER,PHASE V, PACKAGE 3, BARANGAY F.L. PENA,KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱141.6M | 69% | High risk93 | Flagged0.007 |
| 25J00035CONSTRUCTION / REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINSAND PRINCIPAL RIVERS - CONSTRUCTION OF FLOODCONTROL STRUCTURE ALONG KABASALAN RIVER,PHASE V, PACKAGE 2, BARANGAY F.L. PENA,KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱140.7M | 70% | High risk93 | Flagged0.007 |
| 25J00034CONSTRUCTION / REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINSAND PRINCIPAL RIVERS - CONSTRUCTION OF FLOODCONTROL STRUCTURE ALONG KABASALAN RIVER,PHASE V, PACKAGE 4, BARANGAY F.L. PENA,KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱141.5M | 73% | High risk93 | Flagged0.006 |
| 22J00057CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL STRUCTURE ALONG TUNGAWAN RIVER (PHASE IV), TUNGAWAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱105M | 81% | High risk74 | Flagged0.002 |
| 19J00018CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MAMPANG - STA. CATALINA SECTION DIVERSION ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱111.5M | 85% | High risk73 | Flagged0.002 |
| 19J00019CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, CABALUAY - ZAMBOWOOD - MAMPANG SECTION (ROAD WIDENING), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱108.5M | 88% | High risk73 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 19J00018CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MAMPANG - STA. CATALINA SECTION DIVERSION ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱111.5M | 85% | High risk73 | Flagged0.002 |
| 27 | 20J00041NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS, PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱108.3M | 100% | High risk73 | —-0.008 |
| 28 | 20J00042NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS, PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱106.6M | 100% | High risk73 | —-0.008 |
| 29 | 18J00025REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROAD - PAGADIAN - ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱184.7M | 100% | High risk73 | —-0.048 |
| 30 | 22J00084CONSTRUCTION OF BY-PASS & DIVERSION ROADS - BUENAVISTA-BOLONG BY-PASS ROAD, PACKAGE 3 | Region IX | Region IX | On-Going | ₱95.3M | 90% | High risk72 | —-0.009 |
| 31 | 23J00035REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS- PRIMARY ROADS - LANAO- PAGADIAN - ZAMBOANGA CITY RD | Region IX | Region IX | On-Going | ₱100.2M | 90% | High risk70 | —-0.028 |
| 32 | 19J00069ROAD WIDENING - PRIMARY ROADS - LANAO-PAGADIAN-ZAMBOANGA CITY ROAD, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱95.9M | 89% | High risk70 | —-0.005 |
| 33 | 23J00037REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - LANAO - PAGADIAN - ZAMBOANGA CITY RD | Region IX | Region IX | On-Going | ₱99M | 90% | High risk70 | —-0.030 |
| 34 | 20J00031NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - LANAO-PAGADIAN-ZAMBOANGA CITY ROAD, ZAMBOANGA SIBUGAY | Region IX | Region IX | Completed | ₱92.8M | 100% | High risk70 | —-0.072 |
| 35 | 22J00083ROAD WIDENING - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱89.3M | 53% | High risk69 | —-0.002 |
| 36 | 21J00013ROAD WIDENING - PRIMARY ROADS - LANAO - PAGADIAN - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱92.8M | 100% | High risk69 | —-0.016 |
| 37 | 18J00078CONSTRUCTION OF BYPASS AND DIVERSION ROADS - JCT. NAT'L. HIGHWAY R.T. LIM - JCT. NAT'L. HIGHWAY SIOCON ROAD, (SURABAY-SAN FERNANDINO), ZAMBOANGA SIBUGAY | Region IX | Region IX | Completed | ₱284.5M | 100% | High risk68 | —-0.039 |
| 38 | 23J00038ROAD WIDENING - PRIMARY ROADS - LANAO - PAGADIAN - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱89.6M | 63% | High risk67 | —-0.020 |
| 39 | 22J00053ROAD WIDENING - PRIMARY ROADS - LANAO-PAGADIAN-ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱90.7M | 75% | High risk67 | —-0.013 |
| 40 | 19J00013REPLACEMENT OF PERMANENT WEAK BRIDGE - VITALI BRIDGE (PARALLEL BRIDGE) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱89.6M | 100% | High risk67 | Flagged0.017 |
| 41 | 25J00138ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱42.8M | 8% | High risk66 | —-0.001 |
| 42 | 17J00002CONSTRUCTION OF BYPASSES/DIVERSION ROADS INCLUDING ROW AT JCT. NATIONAL HIGHWAY R.T. LIM-JCT. NATIONAL HIGHWAY SIOCON ROAD (SURABAY-SAN FERNANDINO), ZAMBOANGA SIBUGAY 2ND DEO, BEG. OF PROJECT: K1827+600.00, END OF PROJECT: K1835+800.00, NET LENGTH: 8,200 | Region IX | Region IX | Completed | ₱239.4M | 100% | High risk66 | —-0.017 |
| 43 | 16JF0063ROAD WIDENING INCLUDING DRAINAGE ALONG IPIL-MAGDAUP WHARF RD. (SO1143MN) (K2014+800-K2015+297) ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱15.5M | 100% | High risk65 | —-0.054 |
| 44 | 17J00054WIDENING OF VITALI BRIDGE AND APPROACHES ALONG ZAMBOANGA CITY - PAGADIAN CITY ROAD, BRGY. VITALI, ZAMBOANGA CITY, BEG. OF PROJ. : 1864+860.00 , ABUTMENT A: 1864+935.79, ABUTMENT B: 1864+987.13, END OF PROJ.: 1865+060.00, APPROACHES NET LENGTH: 148.66 LN. | Region IX | Region IX | Completed | ₱57.9M | 100% | High risk64 | —-0.029 |
| 45 | 23JA0007NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY RD - K1927+420 - K1927+990 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱41.5M | 94% | High risk61 | —-0.034 |
| 46 | 20JA0055CONSTRUCTION OF FOUR STOREY 16 CLASSROOMS AT TULUNGATUNG NHS, BARANGAY TULUNGATUNG, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱46.6M | 100% | Medium risk58 | —-0.067 |
| 47 | 18JA0049CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES - JUNCTION SANGALI ROAD, SANGALI FISHING PORT IN SUPPORT SHIP BUILDING, CANNED SARDINES AND FISHERIES, SANGALI, ZAMBOANGA | Region IX | Zamboanga City 2nd DEO | Terminated | ₱6.6M | 100% | Medium risk57 | —-0.054 |
| 48 | 18JH0034CONCRETING OF LOCAL ROAD, ISABELA CITY, BASILAN | Region IX | Isabela City DEO | Completed | ₱12.8M | 100% | Medium risk55 | —-0.077 |
| 49 | 18JA0047CONSTRUCTION OF FLOOD CONTROL AT VITALI RIVER, VITALI SECTION, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱45.8M | 100% | Medium risk54 | —-0.061 |
| 50 | 20JF0008ROAD WIDENING - PRIMARY ROADS - LANAO - PAGADIAN - ZAMBOANGA CITY ROAD K1843+235.67 - K1843+500 | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱24.1M | 100% | Medium risk53 | —-0.082 |