Contractor dossier
80 projects on file, including joint ventures this contractor is part of.
Total projects
80
Total budget
₱5.3B
Average progress
89.8%
Completion rate
56.3%
Below 70%
Average risk score
59.6
Medium risk on average, out of 100
Flagged as unusual
11
13.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 80 | ₱5.3B | 59.6 | 11 | 89.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 47 | ₱3.6B | 62.3 | 2 | 91.1% |
| Buildings and Facilities | 12 | ₱181.9M | 33.2 | 1 | 91.7% |
| Flood Control and Drainage | 8 | ₱465.4M | 53.3 | 1 | 96.4% |
| OTHER | 6 | ₱296.8M | 80.3 | 3 | 72.3% |
| GAA 2025 OO-2 | 3 | ₱423.8M | 93.5 | 3 | 71.0% |
| Bridges | 3 | ₱185.7M | 60.8 | 1 | 100.0% |
| Bridges, Roads | 1 | ₱95.3M | 72.0 | 0 | 90.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25J00033CONSTRUCTION / REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINSAND PRINCIPAL RIVERS - CONSTRUCTION OF FLOODCONTROL STRUCTURE ALONG KABASALAN RIVER,PHASE V, PACKAGE 3, BARANGAY F.L. PENA,KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱141.6M | 69% | High risk93 | Flagged0.007 |
| 25J00035CONSTRUCTION / REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINSAND PRINCIPAL RIVERS - CONSTRUCTION OF FLOODCONTROL STRUCTURE ALONG KABASALAN RIVER,PHASE V, PACKAGE 2, BARANGAY F.L. PENA,KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱140.7M | 70% | High risk93 | Flagged0.007 |
| 25J00034CONSTRUCTION / REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINSAND PRINCIPAL RIVERS - CONSTRUCTION OF FLOODCONTROL STRUCTURE ALONG KABASALAN RIVER,PHASE V, PACKAGE 4, BARANGAY F.L. PENA,KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱141.5M | 73% | High risk93 | Flagged0.006 |
| 24J00248CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RURAL HEALTH UNIT, TUNGAWAN SUPER HEALTH CENTER, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱11.3M | 92% | High risk87 | Flagged0.052 |
| 23J00067CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BUENAVISTA - BOLONG BY-PASS ROAD, PACKAGE 5, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱98.6M | 17% | High risk84 | Flagged0.049 |
| 23J00066CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BUENAVISTA - BOLONG BY-PASS ROAD, PACKAGE 4, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱98.6M | 25% | High risk84 | Flagged0.046 |
| 20JF0089BUAYAN BR. (PARALLEL BR.) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱20.6M | 100% | High risk76 | —-0.030 |
| 20JF0011WIDENING OF PERMANENT BRIDGES - BUAYAN BR. II (PARALLEL BR.) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD K1775+139.00 - K1775+202.84 | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱21.8M | 100% | High risk76 | —-0.029 |
| 17JF0001CONCRETING OF LABASAN-CAMANGA RD., SIAY, ZAMBO. SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱45.8M | 100% | High risk75 | —-0.020 |
| 23J00131CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA-BOLONG BY-PASS ROAD, PACKAGE 8, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143M | 90% | High risk75 | —-0.021 |
| 24J00008CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG BY-PASS ROAD, PACKAGE 12, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱154.1M | 90% | High risk75 | —-0.022 |
| 20J00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG BYPASS ROAD, PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱133.8M | 100% | High risk74 | —-0.001 |
| 23J00134CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG BY-PASS ROAD, PACKAGE 11, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱131M | 62% | High risk74 | —-0.013 |
| 23J00133CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA-BOLONG BY-PASS ROAD, PACKAGE 10, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱136.2M | 40% | High risk74 | —-0.009 |
| 22J00057CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL STRUCTURE ALONG TUNGAWAN RIVER (PHASE IV), TUNGAWAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱105M | 81% | High risk74 | Flagged0.002 |
| 20J00035CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL ALONG TUNGAWAN RIVER (PHASE II), TUNGAWAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱99.6M | 100% | High risk74 | —-0.002 |
| 21J00018CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL ALONG TUNGAWAN RIVER (PHASE III), TUNGAWAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱103.9M | 100% | High risk74 | —-0.005 |
| 23J00041CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL STRUCTURE ALONG TUNGAWAN RIVER (PHASE V), TUNGAWAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱105.1M | 90% | High risk74 | —-0.010 |
| 20J00043CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG BYPASS ROAD, PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱128.3M | 100% | High risk73 | —-0.002 |
| 18J00015CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG COASTAL BYPASS ROAD (CURUAN - LUBIGAN SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱127.7M | 100% | High risk73 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24J00248CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RURAL HEALTH UNIT, TUNGAWAN SUPER HEALTH CENTER, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱11.3M | 92% | High risk87 | Flagged0.052 |
| 23J00067CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BUENAVISTA - BOLONG BY-PASS ROAD, PACKAGE 5, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱98.6M | 17% | High risk84 | Flagged0.049 |
| 23J00066CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BUENAVISTA - BOLONG BY-PASS ROAD, PACKAGE 4, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱98.6M | 25% | High risk84 | Flagged0.046 |
| 17JH0081CONSTRUCTION OF ONE (1) UNIT 1-STOREY 3-CL SCHOOL BUILDING @ BADJAO FLOATING ELEMENTARY SCHOOL | Region IX | Isabela City DEO | Completed | ₱5.2M | 0% | Medium risk40 | Flagged0.025 |
| 19J00013REPLACEMENT OF PERMANENT WEAK BRIDGE - VITALI BRIDGE (PARALLEL BRIDGE) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱89.6M | 100% | High risk67 | Flagged0.017 |
| 25J00033CONSTRUCTION / REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINSAND PRINCIPAL RIVERS - CONSTRUCTION OF FLOODCONTROL STRUCTURE ALONG KABASALAN RIVER,PHASE V, PACKAGE 3, BARANGAY F.L. PENA,KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱141.6M | 69% | High risk93 | Flagged0.007 |
| 25J00035CONSTRUCTION / REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINSAND PRINCIPAL RIVERS - CONSTRUCTION OF FLOODCONTROL STRUCTURE ALONG KABASALAN RIVER,PHASE V, PACKAGE 2, BARANGAY F.L. PENA,KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱140.7M | 70% | High risk93 | Flagged0.007 |
| 25J00034CONSTRUCTION / REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINSAND PRINCIPAL RIVERS - CONSTRUCTION OF FLOODCONTROL STRUCTURE ALONG KABASALAN RIVER,PHASE V, PACKAGE 4, BARANGAY F.L. PENA,KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱141.5M | 73% | High risk93 | Flagged0.006 |
| 22J00057CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL STRUCTURE ALONG TUNGAWAN RIVER (PHASE IV), TUNGAWAN, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱105M | 81% | High risk74 | Flagged0.002 |
| 19J00018CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MAMPANG - STA. CATALINA SECTION DIVERSION ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱111.5M | 85% | High risk73 | Flagged0.002 |
| 19J00019CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, CABALUAY - ZAMBOWOOD - MAMPANG SECTION (ROAD WIDENING), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱108.5M | 88% | High risk73 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18JF0006IMPROVEMENT/ CONSTRUCTION/ CONCRETING OF LABASAN - CAMANGA RD., ZAMBOANGA SIBUGAY (PHASE II) (K3 + 111 - K4 + 711) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱28.6M | 100% | Medium risk53 | —-0.085 |
| 52 | 18JF0087NJR LEADING TO LOOC-LABUAN BEACH, TUNGAWAN, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱24.1M | 100% | Medium risk53 | —-0.083 |
| 53 | 20JF0073ROAD WIDENING - PRIMARY ROADS LANAO- PAGADIAN - ZAMBOANGA CITY RD. K1801+497 - K1802+921.38 IPIL, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱36.9M | 100% | Medium risk53 | —-0.084 |
| 54 | 21JF0015ROAD WIDENING - PRIMARY ROADS - LANAO - PAGADIAN-ZAMBOANGA CITY RD. K1782+027.00 - K1782+074.00, K1782+169.00 - K1782+712.00 | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱20.7M | 100% | Medium risk52 | —-0.085 |
| 55 | 18JF0019CONSTRUCTION OF CONCRETE BRIDGE ALONG BUAYAN BR. II ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD. ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱38.2M | 100% | Medium risk52 | —-0.055 |
| 56 | 20JF0027CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - NRJ LEADING TO MALUBAL FALLS, R.T. LIM, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱9.7M | 100% | Medium risk50 | —-0.085 |
| 57 | 18JA0114CONCRETING OF DABUY GRANDE FMR, BRGY. SIBULAO, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱4.8M | 100% | Medium risk50 | —-0.030 |
| 58 | 20JF0076CONSTRUCTION OF EP BARRACKS AND MESS HALL OF THE 102ND INFRANTRY (IGSOON) BRIGADE, BRGY. SANITO, IPIL, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱14.5M | 100% | Medium risk50 | —-0.081 |
| 59 | 22JF0018CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADE, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), BARANGAY ROAD CONNECTING IMAVEMCO TO JUNCTION NATIONAL HIGHWAY IN SUPPORT OF NOOD | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱9.7M | 100% | Medium risk50 | —-0.086 |
| 60 | 20JF0030CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - BRGY ROAD CONNECTING IMAVEMCO TO JUNCTION NATIONAL HIGHWAY IN SUPPORT OF NOODLES PROCESSING TIAYON, IPIL, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱9.7M | 100% | Medium risk50 | —-0.086 |
| 61 | 21JF0005CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - BRGY. ROAD CONNECTING IMAVEMCO TO JUNCTION NATIONAL HIGHWAY IN SUPPORT OF NOODLES PROCESSING, TIAYON, IPIL, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱7.2M | 100% | Medium risk50 | —-0.083 |
| 62 | 21JF0026CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLEARED TOURISM DESTINATIONS - NRJ LEADING TO MALUBAL FALLS, ROSELLER LIM, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱5M | 100% | Medium risk49 | —-0.081 |
| 63 | 18JA0139CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING AT LUMBAYAO ELEMENTARY SCHOOL, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱10.5M | 100% | Medium risk48 | —-0.032 |
| 64 | 18JF0120CONSTRUCTION OF TESDA INNOVATION CENTER KIT, KABASALAN, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱39.8M | 100% | Medium risk46 | —-0.018 |
| 65 | 20JF0094CONCRETING OF BRGY. SAN FERNANDINO FMR, BRGY. SAN FERNANDINO, R.T. LIM, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱12.6M | 100% | Medium risk43 | —-0.033 |
| 66 | 19JF0146CONCRETING OF BRGY. REMEDIOS FMR, BRGY. REMEDIOS, R.T. LIM, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱5M | 100% | Medium risk42 | —-0.030 |
| 67 | 18JF0107CONCRETING OF BARANGAY SAN FERNANDINO FARM TO MARKET ROAD (FMR), R.T. LIM, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱4.9M | 100% | Medium risk42 | —-0.030 |
| 68 | 18JF0109CONCRETING OF BARANGAY SAN PEDRO FARM TO MARKET ROAD (FMR), TUNGAWAN, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱9.9M | 100% | Medium risk42 | —-0.033 |
| 69 | 17JH0027CONSTRUCTION OF 1-STOREY 4-CL SCHOOL BUILDING @ LATUAN ELEMENTARY SCHOOL | Region IX | Isabela City DEO | Completed | ₱5.1M | 100% | Medium risk40 | —-0.008 |
| 70 | 17JH0081CONSTRUCTION OF ONE (1) UNIT 1-STOREY 3-CL SCHOOL BUILDING @ BADJAO FLOATING ELEMENTARY SCHOOL | Region IX | Isabela City DEO | Completed | ₱5.2M | 0% | Medium risk40 | Flagged0.025 |
| 71 | 17JF0111CONSTRUCTION OF 2 UNITS 2STY 8CL SCHOOL BUILDING AT SURABAY CES, R.T. LIM, Z.S | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱33.8M | 100% | Medium risk40 | —-0.010 |
| 72 | 17JF0110CONSTRUCTION OF 2 STOREY 6CL SCHOOL BUILDING AT MABUHAY ES, R.T. LIM, Z.S | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱11.6M | 100% | Medium risk37 | —-0.016 |
| 73 | 18JH0033CONCRETING OF 200M ROAD, BRGY. TABUK, ISABELA CITY, BASILAN | Region IX | Isabela City DEO | Completed | ₱3M | 100% | Medium risk31 | —-0.076 |
| 74 | 18JA0060CONSTRUCTION OF DRAINAGE SYSTEM, KASANYANGAN, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱2M | 100% | Low risk26 | —-0.065 |
| 75 | 19JA0046CONSTRUCTION OF DRAINAGE SYSTEM, BARANGAY KASANYANGAN, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱2M | 100% | Low risk26 | —-0.067 |