Contractor dossier
37 projects on file, including joint ventures this contractor is part of.
Total projects
37
Total budget
₱710.8M
Average progress
99.8%
Completion rate
97.3%
Average risk score
31.2
Medium risk on average, out of 100
Flagged as unusual
1
2.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 37 | ₱710.8M | 31.2 | 1 | 99.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 14 | ₱148.5M | 27.8 | 0 | 100.0% |
| Flood Control and Drainage | 10 | ₱334.2M | 33.0 | 0 | 100.0% |
| Roads | 6 | ₱73.4M | 29.7 | 0 | 100.0% |
| Bridges | 3 | ₱96M | 32.5 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱10.8M | 22.1 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱47.9M | 94.5 | 1 | 91.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CI0055SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES ALONG SAPANGBALEN RIVER, B | Region III | Pampanga 3rd DEO | On-Going | ₱47.9M | 92% | High risk94 | Flagged0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CI0055SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES ALONG SAPANGBALEN RIVER, B | Region III | Pampanga 3rd DEO | On-Going | ₱47.9M | 92% | High risk94 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CI0055SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES ALONG SAPANGBALEN RIVER, B | Region III | Pampanga 3rd DEO | On-Going | ₱47.9M | 92% | High risk94 | Flagged0.002 |
| 2 | 17CJ0057REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL (LEFT DIKE), STA LUCIA PHASE I, STA LUCIA, GERONA, TARLAC, STA 0+000 - 0+377.50 | Region III | Tarlac DEO | Completed | ₱37.4M | 100% | Medium risk59 | —-0.005 |
| 3 | 17C00052CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTORS-RAINWATER COLLECTOR SYSTEM (RWCS), PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱3.3M | 100% | Medium risk39 | —-0.041 |
| 4 | 20CJ0139LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. SAN PASCUAL, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.107 |
| 5 | 21CA0084LOCAL PROGRAM - CONSTRUCTION/REPAIR/ REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -LOCAL ROADS AND BRIDGES - LOCAL BRIDGES -CONSTRUCTION/REHABILITATION OF SAN JUAN BRIDGE ALONG OLD NATIONAL ROAD, SAMAL, BATAAN | Region III | Bataan 1st DEO | Completed | ₱44.1M | 100% | Medium risk39 | —-0.057 |
| 6 | 24CJ0244CONSTRUCTION OF SCHOOL BUILDING, SAN JOSE ELEMENTARY SCHOOL, BRGY. SAN JOSE, TARLAC CITY | Region III | Tarlac DEO | Completed | ₱20M | 100% | Medium risk35 | —-0.101 |
| 7 | 21CJ0117LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF MULTI-PURPOSE BUILDING (TARLAC CITY PLAZUELA), BRGY. POBLACION, TARLAC CITY | Region III | Tarlac DEO | Completed | ₱19.4M | 100% | Medium risk34 | —-0.102 |
| 8 | 22CJ0234BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱14.7M | 100% | Medium risk34 | —-0.102 |
| 9 | 20CJ0141LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION/IMPROVEMENT OF TARLAC CITY PLAZUELA PHASE II, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱14.6M | 100% | Medium risk33 | —-0.102 |
| 10 | 23CJ0183BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONCRETING OF ROAD AT BRGY. MAPALAD, TARLAC CITY | Region III | Tarlac DEO | Completed | ₱19.8M | 100% | Medium risk33 | —-0.102 |
| 11 | 20CI0010CONVERGENCE SPECIAL SUPPORT PROGRAM;CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES,STA INES TO ATLU BOLA ROAD,MABALACAT CITY,PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱24.5M | 100% | Medium risk33 | —-0.102 |
| 12 | 23CJ0179BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CAPEHAN, TARLAC CITY | Region III | Tarlac DEO | Completed | ₱14.7M | 100% | Medium risk33 | —-0.102 |
| 13 | 18CJ0193LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF CONVENTION HALL WITH MULTI-PURPOSE GYMNASIUM, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱9.6M | 100% | Medium risk32 | —-0.102 |
| 14 | 18CJ0192LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF A MULTI-PURPOSE BUILDING (CONVENTION HALL WITH MULTI PURPOSE GYMNASIUM), TARLAC CITY | Region III | Tarlac DEO | Completed | ₱9.6M | 100% | Medium risk32 | —-0.097 |
| 15 | 25CG0024FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, (DOWNSTREAM- LEFT BANK) BARANGAY CONSUELO, MACABEBE, PAMP | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Medium risk32 | —-0.090 |
| 16 | 25CG0025FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, (DOWNSTREAM- RIGHT BANK) BARANGAY CONSUELO, MACABEBE, PAMP | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Medium risk32 | —-0.091 |
| 17 | 22CI0064BASIC INFRA PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES, CONST OF SLOPE PROTECTION ALONG SAPANGBALEN CREEK, BRGY BALITUCAN, MAGALANG, PAMP. | Region III | Pampanga 3rd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.093 |
| 18 | 23CJ0130BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZENS CENTER) PHASE 2, CITY OF TARLAC, TARLAC | Region III | Tarlac DEO | Completed | ₱9.8M | 100% | Medium risk32 | —-0.099 |
| 19 | 21CI0003CONVERGENCE AND SPECIAL SUPPORT PROGRAM;CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES(ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRA PROGRAM-ROLL-IT) CLARK NORTH ACCESS ROAD FROM MC ARTHUR HIGHWAY TO P. BALAGTAS | Region III | Pampanga 3rd DEO | Completed | ₱9.7M | 100% | Medium risk31 | —-0.103 |
| 20 | 22CJ0204BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF SAN JOSE DE UQUICO-ARMENIA ROAD, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱9.8M | 100% | Medium risk30 | —-0.103 |
| 21 | 19CA0045CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT ALONG COLO RIVER, STA. ISABEL SECTION, PHASE B, DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱27.4M | 100% | Medium risk30 | —-0.089 |
| 22 | 23CI0057SIPAG-ACCESS ROADS AND/OR BRIDGE/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES- IMPROVEMENT/REHABILITATION OF PANDAN BRIDGE, ANGELES CITY | Region III | Pampanga 3rd DEO | Completed | ₱37.2M | 100% | Low risk29 | —-0.063 |
| 23 | 21CI0011RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES; ABACAN BR. (BO1046LZ) ALONG MANILA NORTH ROAD, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱14.7M | 100% | Low risk29 | —-0.065 |
| 24 | 19CI0016CONSTRUCTION OF SLOPE PROTECTION STRUCTURE-CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION ALONG QUITANGIL CREEK, STA LUCIA, MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱14.6M | 100% | Low risk29 | —-0.092 |
| 25 | 20CI0026FLOOD MANAGEMENT PROGRAM;CONST/MAINT OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS;CONST OF GROUNSILL ALONG ABACAN RIVER BRGY STA TERESITA, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱19.6M | 100% | Low risk29 | —-0.089 |