Opening the dossier…
Opening the dossier…
Contractor dossier
68 projects on file, including joint ventures this contractor is part of.
Total projects
68
Total budget
₱3.5B
Average progress
87.6%
Completion rate
58.8%
Below 70%
Average risk score
60.6
High risk on average, out of 100
Flagged as unusual
3
4.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 68 | ₱3.5B | 60.6 | 3 | 87.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 42 | ₱2.4B | 59.8 | 0 | 92.9% |
| Roads | 14 | ₱881M | 63.7 | 0 | 77.3% |
| Buildings and Facilities | 8 | ₱36M | 48.9 | 0 | 99.2% |
| GAA 2025 OO-1 | 2 | ₱141M | 94.4 | 2 | 1.4% |
| OTHER | 1 | ₱37.9M | 77.1 | 1 | 76.8% |
| Bridges | 1 | ₱7.2M | 58.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25F00050ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0505+419-K0505+600, K0509+704-K0510+912, GUINOBATAN, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱100.2M | 1% | High risk95 | Flagged0.024 |
| 25F00093ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0493+200-K0493+779, POLANGUI, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱40.7M | 2% | High risk94 | Flagged0.016 |
| 21FO0110REHABILITATION/RECONSTRUCTION OF SAN FRANCISCO RIVER CONTROL, GUINOBATAN, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱37.9M | 77% | High risk77 | Flagged0.019 |
| 23F00170ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF NASISI RIVER FLOOD MITIGATION STRU | Region V | Region V | Completed | ₱115.8M | 100% | High risk71 | —-0.074 |
| 24FO0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE, BARANGAY NABONTON, LIGAO CITY, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱96.2M | 91% | High risk71 | —-0.043 |
| 22FO0079CLUSTER V-2022: 1.) REHABILITATION OF TANDARORA FLOOD CONTROL DIKE (LEFT SIDE) GUINOBATAN, ALBAY; AND 2.) REHABILITATION OF TANDARORA FLOOD CONTROL DIKE (RIGHT SIDE) GUINOBATAN, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱98M | 89% | High risk71 | —-0.024 |
| 24FO0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM(BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF SAN FRANCISCO RIVER FLOOD MITIGATION STRUCTURES, BRGY. MAGUIRON AND BRGY. M | Region V | Albay 3rd DEO | On-Going | ₱99M | 89% | High risk71 | —-0.040 |
| 22FO0060CLUSTER X-2022: 1.) REHABILITATION OF TRAVESIA FLOOD CONTROL (PHASE II). GUINOBATAN, ALBAY; AND 2.) CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE (BRGY. BATANG AND BRGY. HERRERA), LIGAO CITY, ALBAY | Region V | Albay 3rd DEO | Completed | ₱97M | 100% | High risk71 | —-0.073 |
| 20FA0010CONSTRUCTION OF MALILIPOT FLOOD CONTROL, SAN JOSE , MALILIPOT, ALBAY | Region V | Albay 1st DEO | Completed | ₱96.5M | 100% | High risk69 | —-0.074 |
| 23FB0054SIPAG: CONSTRUCTION OF COMUN-COTMON-DEL ROSARIO-KINAWITAN ROAD PHASE 2, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱65.2M | 77% | High risk67 | —-0.052 |
| 25FO0057ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAMARINES SUR - ALBAY DIVERSION ROAD, PACKAGE 1, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱70.5M | 0% | High risk67 | —-0.040 |
| 23F00031ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-LEGAZPI CITY COASTAL ROAD, ACCESS ROAD, ALBAY, LEGAZPI CITY, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | Region V | Completed | ₱62M | 100% | High risk66 | —-0.098 |
| 20FA0006CLUSTER 6- ASPHALT OVERLAY OF DAANG MAHARLIKA JCT.-LEGAZPI-STO.DOMINGO-TABACO-CAM SUR BDRY. ROAD K0576+000-K0578+120; AND ASPHALT OVERLAY OF MT. MAYON PARK ROAD. K0521+357- K0524+444 | Region V | Albay 1st DEO | Completed | ₱91.5M | 100% | High risk66 | —-0.092 |
| 20F00096LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-IMPROVEMENT OF ALBAY-CAMARINES SUR DIVERSION ROAD, LIBON, ALBAY, ALBAY 3RD DISTRICT | Region V | Region V | Completed | ₱77.2M | 100% | High risk66 | —-0.092 |
| 24FO0012ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAMARINES SUR - ALBAY DIVERSION ROAD, PACKAGE 5, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱56.3M | 44% | High risk66 | —-0.047 |
| 22FB0115SIPAG - CONSTRUCTION OF KINAWITAN-SAN VICENTE PEQUEÑO-MAOPI ROAD, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱51.4M | 60% | High risk65 | —-0.035 |
| 17F00048MFO3-MAINT. & CONST. SERVICES OF OTHER INFRASTRUCTURES CONST./IMPR. OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, CONST OF CONCRETE ROAD-CAGRARAY CIRCUMFERENTIAL ROAD, TAMBILAGAO-LANGATON AND CABASAN-NAPAO-TANAGA SECTION, ALBAY 1ST LD | Region V | Region V | Completed | ₱193M | 100% | High risk65 | —-0.022 |
| 22FB0159SIPAG: CONSTRUCTION OF BASCARAN-BURGOS-MABINI ROAD, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱47.4M | 100% | High risk64 | —-0.047 |
| 18FO0034ROAD WIDENING OF DAANG MAHARLIKA ROAD, K0504+240 - K0506+022 | Region V | Albay 3rd DEO | Completed | ₱47.4M | 100% | High risk64 | —-0.100 |
| 24FB0192CONCRETING OF BRGY. TALADONG TO BRGY. TAGOYTOY FMR, BRGY. TALADONG, CAMALIG ALBAY | Region V | Albay 2nd DEO | On-Going | ₱14.5M | 60% | High risk64 | —-0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25F00050ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0505+419-K0505+600, K0509+704-K0510+912, GUINOBATAN, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱100.2M | 1% | High risk95 | Flagged0.024 |
| 21FO0110REHABILITATION/RECONSTRUCTION OF SAN FRANCISCO RIVER CONTROL, GUINOBATAN, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱37.9M | 77% | High risk77 | Flagged0.019 |
| 25F00093ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0493+200-K0493+779, POLANGUI, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱40.7M | 2% | High risk94 | Flagged0.016 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25F00050ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0505+419-K0505+600, K0509+704-K0510+912, GUINOBATAN, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱100.2M | 1% | High risk95 | Flagged0.024 |
| 2 | 25F00093ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0493+200-K0493+779, POLANGUI, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱40.7M | 2% | High risk94 | Flagged0.016 |
| 3 | 21FO0110REHABILITATION/RECONSTRUCTION OF SAN FRANCISCO RIVER CONTROL, GUINOBATAN, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱37.9M | 77% | High risk77 | Flagged0.019 |
| 4 | 23F00170ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF NASISI RIVER FLOOD MITIGATION STRU | Region V | Region V | Completed | ₱115.8M | 100% | High risk71 | —-0.074 |
| 5 | 24FO0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE, BARANGAY NABONTON, LIGAO CITY, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱96.2M | 91% | High risk71 | —-0.043 |
| 6 | 22FO0079CLUSTER V-2022: 1.) REHABILITATION OF TANDARORA FLOOD CONTROL DIKE (LEFT SIDE) GUINOBATAN, ALBAY; AND 2.) REHABILITATION OF TANDARORA FLOOD CONTROL DIKE (RIGHT SIDE) GUINOBATAN, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱98M | 89% | High risk71 | —-0.024 |
| 7 | 24FO0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM(BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF SAN FRANCISCO RIVER FLOOD MITIGATION STRUCTURES, BRGY. MAGUIRON AND BRGY. M | Region V | Albay 3rd DEO | On-Going | ₱99M | 89% | High risk71 | —-0.040 |
| 8 | 22FO0060CLUSTER X-2022: 1.) REHABILITATION OF TRAVESIA FLOOD CONTROL (PHASE II). GUINOBATAN, ALBAY; AND 2.) CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE (BRGY. BATANG AND BRGY. HERRERA), LIGAO CITY, ALBAY | Region V | Albay 3rd DEO | Completed | ₱97M | 100% | High risk71 | —-0.073 |
| 9 | 20FA0010CONSTRUCTION OF MALILIPOT FLOOD CONTROL, SAN JOSE , MALILIPOT, ALBAY | Region V | Albay 1st DEO | Completed | ₱96.5M | 100% | High risk69 | —-0.074 |
| 10 | 23FB0054SIPAG: CONSTRUCTION OF COMUN-COTMON-DEL ROSARIO-KINAWITAN ROAD PHASE 2, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱65.2M | 77% | High risk67 | —-0.052 |
| 11 | 25FO0057ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAMARINES SUR - ALBAY DIVERSION ROAD, PACKAGE 1, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱70.5M | 0% | High risk67 | —-0.040 |
| 12 | 23F00031ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-LEGAZPI CITY COASTAL ROAD, ACCESS ROAD, ALBAY, LEGAZPI CITY, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | Region V | Completed | ₱62M | 100% | High risk66 | —-0.098 |
| 13 | 20FA0006CLUSTER 6- ASPHALT OVERLAY OF DAANG MAHARLIKA JCT.-LEGAZPI-STO.DOMINGO-TABACO-CAM SUR BDRY. ROAD K0576+000-K0578+120; AND ASPHALT OVERLAY OF MT. MAYON PARK ROAD. K0521+357- K0524+444 | Region V | Albay 1st DEO | Completed | ₱91.5M | 100% | High risk66 | —-0.092 |
| 14 | 20F00096LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-IMPROVEMENT OF ALBAY-CAMARINES SUR DIVERSION ROAD, LIBON, ALBAY, ALBAY 3RD DISTRICT | Region V | Region V | Completed | ₱77.2M | 100% | High risk66 | —-0.092 |
| 15 | 24FO0012ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAMARINES SUR - ALBAY DIVERSION ROAD, PACKAGE 5, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱56.3M | 44% | High risk66 | —-0.047 |
| 16 | 22FB0115SIPAG - CONSTRUCTION OF KINAWITAN-SAN VICENTE PEQUEÑO-MAOPI ROAD, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱51.4M | 60% | High risk65 | —-0.035 |
| 17 | 17F00048MFO3-MAINT. & CONST. SERVICES OF OTHER INFRASTRUCTURES CONST./IMPR. OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, CONST OF CONCRETE ROAD-CAGRARAY CIRCUMFERENTIAL ROAD, TAMBILAGAO-LANGATON AND CABASAN-NAPAO-TANAGA SECTION, ALBAY 1ST LD | Region V | Region V | Completed | ₱193M | 100% | High risk65 | —-0.022 |
| 18 | 22FB0159SIPAG: CONSTRUCTION OF BASCARAN-BURGOS-MABINI ROAD, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱47.4M | 100% | High risk64 | —-0.047 |
| 19 | 18FO0034ROAD WIDENING OF DAANG MAHARLIKA ROAD, K0504+240 - K0506+022 | Region V | Albay 3rd DEO | Completed | ₱47.4M | 100% | High risk64 | —-0.100 |
| 20 | 24FB0192CONCRETING OF BRGY. TALADONG TO BRGY. TAGOYTOY FMR, BRGY. TALADONG, CAMALIG ALBAY | Region V | Albay 2nd DEO | On-Going | ₱14.5M | 60% | High risk64 | —-0.001 |
| 21 | 21FO0115CONCRETING OF ROAD OF ALONGOG-TAGBAC AND MACABUGOS ROAD, LIBON, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱48.5M | 91% | High risk63 | —-0.040 |
| 22 | 25FO0026ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD MITIGATION RIVERBANK CONTROL STRUCTURE ALONG QU | Region V | Albay 3rd DEO | On-Going | ₱89.3M | 29% | High risk63 | —-0.028 |
| 23 | 24F00295ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SAN RAFAEL RIVER CONTROL, SAN RAFAEL, GUINOBATAN, ALBAY, GU | Region V | Region V | Completed | ₱72.4M | 100% | High risk62 | —-0.083 |
| 24 | 22FO0036CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE (BRGY. PINIT), LIGAO CITY, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱56M | 100% | High risk62 | —-0.036 |
| 25 | 23FO0005CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG NASISI RIVER (DOWNSTREAM OF TOBGON BRIDGE) PHASE II, BARANGAY NASISI AND BARANGAY BATANG, LIGAO CITY, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱69.8M | 100% | High risk62 | —-0.038 |