Contractor dossier
44 projects on file, including joint ventures this contractor is part of.
Total projects
44
Total budget
₱5.1B
Average progress
99.4%
Completion rate
95.5%
Average risk score
55.7
Medium risk on average, out of 100
Flagged as unusual
2
4.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 35 | ₱4.5B | 57.2 | 2 | 99.3% |
| Region VII | 4 | ₱183.8M | 48.3 | 0 | 100.0% |
| Negros Island Region | 3 | ₱274.1M | 54.8 | 0 | 100.0% |
| Region II | 2 | ₱87.7M | 45.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 36 | ₱4.2B | 54.3 | 0 | 100.0% |
| OTHER | 3 | ₱542M | 76.2 | 2 | 91.4% |
| Bridges | 2 | ₱165.7M | 54.0 | 0 | 100.0% |
| Flood Control and Drainage | 2 | ₱119.2M | 48.8 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱99.3M | 62.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22P00138ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROAD - KENNON RD - KO237+529 - KO237+680TUBA, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱264.2M | 74% | High risk79 | Flagged0.049 |
| 17P00024ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4) KENNON ROAD, K0216+814 - K0217+000, K0217+00 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱133M | 100% | High risk77 | —-0.007 |
| 17P00003ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) APAYAO - ILOCOS NORTE ROAD, K0728+504-K0728+756, K0730+376-K0731+109, K0731+589-K0734+354 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | High risk73 | Flagged0.003 |
| 18P00015ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINK/ NEW ROADS- ASIN-NANGALISAN JCT.-BAYABAS-MONGLO JCT. (SECTION 1 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD) INCLUDING ROW AND BRIDGE | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱141.8M | 100% | High risk63 | —-0.020 |
| 18P00038CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, TIMBAK CAVES ROAD LEADING TO TIMBAK CAVES AND MUMMY OF APO ANNO, INCL. BRIDGE, ATOK/KABAYAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱99.3M | 100% | High risk62 | —-0.040 |
| 17P00028ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4) ASIN (KM8)- NANGALISAN- SAN PASCUAL, TUBA, B | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱102.1M | 100% | High risk62 | —-0.040 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22P00138ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROAD - KENNON RD - KO237+529 - KO237+680TUBA, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱264.2M | 74% | High risk79 | Flagged0.049 |
| 17P00003ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) APAYAO - ILOCOS NORTE ROAD, K0728+504-K0728+756, K0730+376-K0731+109, K0731+589-K0734+354 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | High risk73 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 22P00138ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROAD - KENNON RD - KO237+529 - KO237+680TUBA, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱264.2M | 74% | High risk79 | Flagged0.049 |
| 2 | 17P00024ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4) KENNON ROAD, K0216+814 - K0217+000, K0217+00 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱133M | 100% | High risk77 | —-0.007 |
| 3 | 17P00003ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) APAYAO - ILOCOS NORTE ROAD, K0728+504-K0728+756, K0730+376-K0731+109, K0731+589-K0734+354 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | High risk73 | Flagged0.003 |
| 4 | 18P00015ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINK/ NEW ROADS- ASIN-NANGALISAN JCT.-BAYABAS-MONGLO JCT. (SECTION 1 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD) INCLUDING ROW AND BRIDGE | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱141.8M | 100% | High risk63 | —-0.020 |
| 5 | 18P00038CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, TIMBAK CAVES ROAD LEADING TO TIMBAK CAVES AND MUMMY OF APO ANNO, INCL. BRIDGE, ATOK/KABAYAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱99.3M | 100% | High risk62 | —-0.040 |
| 6 | 17P00028ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4) ASIN (KM8)- NANGALISAN- SAN PASCUAL, TUBA, B | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱102.1M | 100% | High risk62 | —-0.040 |
| 7 | 18P00030ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT- SECONDARY ROADS CONNER-KABUGAO RD K0566+411 - K0570+000, K0570+360 - K0571+004, K0576+720 - K0579+000, K0580+600 - K0581+562, K0583+ | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱115.9M | 100% | Medium risk59 | —-0.062 |
| 8 | 21HK0122ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM: REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS @ BAIS - KABANKALAN ROAD K0071+500 - K0071+870, MABINAY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱94.6M | 100% | Medium risk59 | —-0.073 |
| 9 | 18P00008ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS (TERTIARY ROADS) APAYAO-ILOCOS NORTE RD, K0734+600 - K0739+044 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱187M | 100% | Medium risk58 | —-0.050 |
| 10 | 18P00009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS (TERTIARY ROADS) APAYAO-ILOCOS NORTE RD, K0739+044 - K0742+620 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱150.5M | 100% | Medium risk58 | —-0.057 |
| 11 | 21P00032ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS BENGUET-NUEVA VIZCAYA ROADK0276 + 040 - K0276 + 13 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.053 |
| 12 | 23P00037KENNON ROAD, K0216+814 - K0219+092, K0220+182 - K0221+000, K0221+090 - K0221+481, K0221+543 - K0223+264, K0223+958 - K0227+122, K0228+078 - K0228+433, K0228+797 - K0229+363, K0229+631 - K0230+600, K0230+681 - K0231+765, K0231+811 - K0232+454.50, K0232+544 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱289.5M | 100% | Medium risk58 | —-0.044 |
| 13 | 19P00002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES (PRIMARY ROADS) ALONG KENNON ROAD, K0223+625 - K0223+707, K0224+562 - K0 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.048 |
| 14 | 21P00024ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS, KENNON ROAD - K0224 + 985 - K0225 + 090, K0232 + 5 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.049 |
| 15 | 21P00033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS BENGUET - NUEVA VIZCAYA ROADKO283+280 - KO283+380, | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱214.2M | 100% | Medium risk58 | —-0.050 |
| 16 | 21P00053CLUSTER: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS (1) BAGUIO - ITOGON ROAD, KO261+370 - KO261 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱212.3M | 100% | Medium risk58 | —-0.049 |
| 17 | 21P00010ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A OF BLIS | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | Medium risk58 | —-0.060 |
| 18 | 20P00010ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLISTT | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | Medium risk58 | —-0.060 |
| 19 | 22P00018ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS ITOGON - DALUPIRIP - SAN MANUEL BDRY RD, KO271+875 - | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | Medium risk58 | —-0.062 |
| 20 | 18P00023ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE (PRIMARY ROADS), KENNON ROAD, K0218+120 - K0218+740 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱277M | 100% | Medium risk57 | —-0.037 |
| 21 | 19PE0027CONSTRUCTION OF MISSING LINKS / NEW ROADS: CONSTRUCTION OF CONCRETE ROAD - SPECIFIC LOCATIONS ALONG BAGUIO-LA TRINIDAD-ITOGON- SABLAN-TUBA & TUBLAY (BLISTT), ASIN-NANGALISAN JCT.- BAYABAS-MONGLO JCT. (SECTION 1 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱95.1M | 100% | Medium risk57 | —-0.074 |
| 22 | 20PB0027NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS- TERTIARY ROADS APAYAO-ILOCOS NORTE RD K0636+831 - K0638+831 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.064 |
| 23 | 18P00032ORGANIZATIONAL OUTCOME 1 ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM OFF-CARRIAGEWAY IMPROVEMENT (PRIMARY ROADS) KENNON ROADCW1 : K0216+270 - K0216+814, K0217+532 - K0217+650, K0227+000 - K0227+068, K0227+079 - K0227+744, K | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱114.2M | 100% | Medium risk56 | —-0.069 |
| 24 | 22P00095KENNON RD - KO239+395 - KO239+480TUBA, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱106.6M | 100% | Medium risk56 | —-0.073 |
| 25 | 21P00031ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS BENGUET-NUEVA VIZCAYA ROAD K0254 + 270 - K0254 + 3 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱106.2M | 100% | Medium risk56 | —-0.071 |