Contractor dossier
48 projects on file, including joint ventures this contractor is part of.
Total projects
48
Total budget
₱1.5B
Average progress
95.6%
Completion rate
83.3%
Average risk score
40.1
Medium risk on average, out of 100
Flagged as unusual
1
2.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 38 | ₱1.2B | 35.8 | 0 | 100.0% |
| National Capital Region | 10 | ₱389.7M | 56.4 | 1 | 78.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 18 | ₱464.3M | 37.2 | 0 | 88.6% |
| Roads | 16 | ₱290.4M | 35.3 | 0 | 100.0% |
| Flood Control and Drainage | 10 | ₱620.2M | 43.2 | 0 | 100.0% |
| OTHER | 2 | ₱30.8M | 62.1 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱48.4M | 94.6 | 1 | 93.7% |
| Bridges | 1 | ₱87.4M | 40.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OH0108REHABILITATION OF MULTI-PURPOSE BUILDING, ISIDRO MENDOZA HEALTH CENTER, PHASE II, BARANGAY 848, PANDACAN, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱48.4M | 94% | High risk95 | Flagged0.002 |
| 15CC0329REPAIR/REHABILITATION/IMPROVEMENT OF CONCRETE SLOPE PROTECTION ALONG L;ABANGAN CHANNEL IBA O' ESTE, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.8M | 100% | High risk67 | —-0.011 |
| 18CC0105NETWORK DEVELOPEMNT - ROAD WIDENING - SECONDARY ROAD - PLARIDEL AIRPORT K0053+(-091) - K0053+663 PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱21M | 100% | High risk62 | —-0.042 |
| 19CD0085ASSET PRESERVATION PREVENTIVE MAINTENANCE MEYCAUAYAN - CAMALIG - BAHAY PARI ROAD K0021+344 - K0021+694; K0022+904 - K0023+304; K0025+208 -K0025+574 | Region III | Bulacan 2nd DEO | Completed | ₱9.8M | 100% | High risk62 | —-0.040 |
| 25CI0028BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER, MABALACAT CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱148.5M | 100% | High risk60 | —-0.038 |
| 25CI0027BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER (PHASE III), MABALACAT CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱148.5M | 100% | High risk60 | —-0.038 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OH0108REHABILITATION OF MULTI-PURPOSE BUILDING, ISIDRO MENDOZA HEALTH CENTER, PHASE II, BARANGAY 848, PANDACAN, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱48.4M | 94% | High risk95 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25OH0108REHABILITATION OF MULTI-PURPOSE BUILDING, ISIDRO MENDOZA HEALTH CENTER, PHASE II, BARANGAY 848, PANDACAN, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱48.4M | 94% | High risk95 | Flagged0.002 |
| 2 | 15CC0329REPAIR/REHABILITATION/IMPROVEMENT OF CONCRETE SLOPE PROTECTION ALONG L;ABANGAN CHANNEL IBA O' ESTE, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.8M | 100% | High risk67 | —-0.011 |
| 3 | 18CC0105NETWORK DEVELOPEMNT - ROAD WIDENING - SECONDARY ROAD - PLARIDEL AIRPORT K0053+(-091) - K0053+663 PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱21M | 100% | High risk62 | —-0.042 |
| 4 | 19CD0085ASSET PRESERVATION PREVENTIVE MAINTENANCE MEYCAUAYAN - CAMALIG - BAHAY PARI ROAD K0021+344 - K0021+694; K0022+904 - K0023+304; K0025+208 -K0025+574 | Region III | Bulacan 2nd DEO | Completed | ₱9.8M | 100% | High risk62 | —-0.040 |
| 5 | 25CI0028BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER, MABALACAT CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱148.5M | 100% | High risk60 | —-0.038 |
| 6 | 25CI0027BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER (PHASE III), MABALACAT CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱148.5M | 100% | High risk60 | —-0.038 |
| 7 | 23C00285CONCRETING OF PULONG UWAY (SEPEDA), BRGY. TALACSAN TO VIOLA HIGHWAY, BRGY. TALACSAN, SAN RAFAEL, BULACAN | Region III | Region III | Completed | ₱11.7M | 100% | Medium risk58 | —-0.013 |
| 8 | 24CI0078SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE(LEFTSIDE) ALONG QUITANGIL CREEK, BRGY C | Region III | Pampanga 3rd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |
| 9 | 23C00257CONCRETING OF BARANGAY PASONG BANGKAL TO BARANGAY MARONQUILLO FMR, BARANGAY PASONG BANGKAL, SAN RAFAEL, BULACAN. | Region III | Region III | Completed | ₱11.9M | 100% | Medium risk57 | —-0.013 |
| 10 | 25OE0155REHABILITATION OF MULTI-PURPOSE BUILDING (HEALTH CENTER) WITHIN ZONE 58 TO 67, MANILA CITY (PHASE II) | National Capital Region | North Manila DEO | Completed | ₱48.5M | 100% | Medium risk55 | —-0.098 |
| 11 | 25OE0159REHABILITATION OF MULTI-PURPOSE BUILDING, PHASE IV, WITHIN ZONE 58 TO 67, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱48.7M | 46% | Medium risk55 | —-0.046 |
| 12 | 25OE0152CONSTRUCTION OF MULTI PURPOSE BUILDING AT BARANGAY 623 ZONE 62, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱48.7M | 40% | Medium risk55 | —-0.045 |
| 13 | 25OE0146CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE IV, WITHIN ZONE 58 TO 67, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱48.5M | 51% | Medium risk55 | —-0.048 |
| 14 | 25OH0138CONSTRUCTION OF ISIDRO MENDOZA HEALTH CENTER, PANDACAN, MANILA (PHASE II) | National Capital Region | South Manila DEO | On-Going | ₱41.2M | 81% | Medium risk52 | —-0.058 |
| 15 | 22OG0029CONSTRUCTION OF AFPRESCOM TRAINING SCHOOL BUILDING, CAMP GENERAL EMILIO AGUINALDO, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱38M | 100% | Medium risk51 | —-0.093 |
| 16 | 25OH0144CONSTRUCTION OF MULTI- PURPOSE BUILDING, SAN ANDRES BUKID COMMUNITY CENTER, BRGY. 767 ZONE 83, SAN ANDRES BUKID, DISTRICT 5, MANILA | National Capital Region | South Manila DEO | On-Going | ₱33.9M | 77% | Medium risk51 | —-0.056 |
| 17 | 22OF0069CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE), BARANGAY STA. CRUZ, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.096 |
| 18 | 25OH0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF ROAD, P.M. GUAZON ST., MANILA | National Capital Region | South Manila DEO | Completed | ₱24.3M | 100% | Medium risk46 | —-0.100 |
| 19 | 18CC0346CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL COMPOUND) IGULOT, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱44.7M | 100% | Medium risk41 | —-0.099 |
| 20 | 20CC0195CONSTRUCTION OF MULTI-PURPOSE BUILDING (NEW MUNICIPAL BUILDING EXTENSION) BRGY. IGULOT, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱30.8M | 100% | Medium risk41 | —-0.102 |
| 21 | 18C00027NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS TAMBUBONG ENTRANCE/EXIT TO NLEX, BULACAN, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱87.4M | 100% | Medium risk40 | —-0.054 |
| 22 | 18CC0347CONSTRUCTION OF ROAD INCLUDING RIGHT-OF-WAY (BUNLO-IGULOT ROAD) BUNLO-IGULOT, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱37.6M | 100% | Medium risk39 | —-0.101 |
| 23 | 18CC0325CONSTRUCTION/REPAIR/REHABILITATION OF SHANGRILA ROAD LGU-LOT BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.3M | 100% | Medium risk38 | —-0.103 |
| 24 | 18CC0298REHABILITATION/RENOVATION OF MULTI-PURPOSE BUILDING (COVERED COURT) POBLACION, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.4M | 100% | Medium risk38 | —-0.107 |
| 25 | 19CC0084ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS ALONG BOCAUE-SAN JOSE ROAD K0027+799 TO K0028+228.20 BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.7M | 100% | Medium risk35 | —-0.106 |