Contractor dossier
38 projects on file, including joint ventures this contractor is part of.
Total projects
38
Total budget
₱1.8B
Average progress
91.8%
Completion rate
65.8%
Below 70%
Average risk score
57.6
Medium risk on average, out of 100
Flagged as unusual
6
15.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 36 | ₱1.8B | 58.1 | 6 | 91.3% |
| National Capital Region | 2 | ₱30.5M | 48.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 27 | ₱1.3B | 51.9 | 1 | 96.1% |
| Buildings and Facilities | 3 | ₱45.2M | 47.8 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱84.7M | 93.8 | 2 | 39.8% |
| OTHER | 2 | ₱243.8M | 88.3 | 2 | 74.9% |
| GAA 2025 SSP | 1 | ₱29.4M | 95.6 | 1 | 73.2% |
| GAA 2025 OO-2 | 1 | ₱34.3M | 86.0 | 0 | 97.0% |
| Bridges | 1 | ₱50.8M | 53.0 | 0 | 94.6% |
| Flood Control and Drainage | 1 | ₱7.9M | 45.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IK0014CSSP-SIPAG- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD, BARANGAY YABON TO BARANGAY CABALAGNAN, HINABANGAN, SAMAR, BARANGAY YABON TO BARANGAY CABALAGNAN, HINABANGAN, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱29.4M | 73% | High risk96 | Flagged0.014 |
| 25I00092ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0783+456 - K0783+601 | Region VIII | Region VIII | On-Going | ₱53M | 48% | High risk95 | Flagged0.008 |
| 25I00113ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0761+978 - K0762+137, K0762+755 - K0763+140, K0764+700 - K0765+050 | Region VIII | Region VIII | On-Going | ₱31.7M | 31% | High risk92 | Flagged0.011 |
| 24II0101CONCRETING OF BRGY. MABINI-VICTORY ROAD (ALONG LAS NAVAS-MATUGUINAO ROAD) PHASE 3, BRGY. MABINI-TAYLOR-VICTORY-EL EMPON-POPONTON-CUENCO ROAD, LAS NAVAS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱97.9M | 55% | High risk92 | Flagged0.071 |
| 25II0023CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHAB. OF LAS NAVAS FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, CATUBIG RIVER BASIN, LAS NAVAS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱34.3M | 97% | High risk86 | —-0.015 |
| 24I00001CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP) - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱145.8M | 95% | High risk84 | Flagged0.026 |
| 22I00041CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TOURISM DESTINATIONS - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱158.7M | 90% | High risk65 | —-0.012 |
| 23I00022CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP) - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱152.5M | 94% | High risk65 | —-0.024 |
| 23I00094NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - PANGPANG - PALAPAG - MAPANAS - GAMAY - LAPINIG RD - K0835+554 - K0836+060, K0836+160 - K0836+220, K0836+260 - K0837+750, K0838+000 - K0839+090, K0839+660 - K0839+800, K0839+965 - K0840+052.50, NORTHE | Region VIII | Region VIII | On-Going | ₱193M | 92% | High risk64 | —-0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24II0101CONCRETING OF BRGY. MABINI-VICTORY ROAD (ALONG LAS NAVAS-MATUGUINAO ROAD) PHASE 3, BRGY. MABINI-TAYLOR-VICTORY-EL EMPON-POPONTON-CUENCO ROAD, LAS NAVAS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱97.9M | 55% | High risk92 | Flagged0.071 |
| 24I00001CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP) - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱145.8M | 95% | High risk84 | Flagged0.026 |
| 24II0102CONCRETING OF BUGAY-GEGUINTA-BUGTUSAN-MABINI-TAYLOR-VICTORY-EL EMPON-POPONTON-CUENCO, LAS NAVAS - MATUGUINAO ROAD, PHASE IV, BRGY. BUGAY-GEGUINTA-BUGTUSAN-MABINI-TAYLOR-VICTORY-EL EMPON-POPONTON-CUENCO, LAS NAVAS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱65.6M | 45% | Medium risk60 | Flagged0.019 |
| 25IK0014CSSP-SIPAG- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD, BARANGAY YABON TO BARANGAY CABALAGNAN, HINABANGAN, SAMAR, BARANGAY YABON TO BARANGAY CABALAGNAN, HINABANGAN, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱29.4M | 73% | High risk96 | Flagged0.014 |
| 25I00113ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0761+978 - K0762+137, K0762+755 - K0763+140, K0764+700 - K0765+050 | Region VIII | Region VIII | On-Going | ₱31.7M | 31% | High risk92 | Flagged0.011 |
| 25I00092ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0783+456 - K0783+601 | Region VIII | Region VIII | On-Going | ₱53M | 48% | High risk95 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25IK0014CSSP-SIPAG- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD, BARANGAY YABON TO BARANGAY CABALAGNAN, HINABANGAN, SAMAR, BARANGAY YABON TO BARANGAY CABALAGNAN, HINABANGAN, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱29.4M | 73% | High risk96 | Flagged0.014 |
| 2 | 25I00092ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0783+456 - K0783+601 | Region VIII | Region VIII | On-Going | ₱53M | 48% | High risk95 | Flagged0.008 |
| 3 | 25I00113ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0761+978 - K0762+137, K0762+755 - K0763+140, K0764+700 - K0765+050 | Region VIII | Region VIII | On-Going | ₱31.7M | 31% | High risk92 | Flagged0.011 |
| 4 | 24II0101CONCRETING OF BRGY. MABINI-VICTORY ROAD (ALONG LAS NAVAS-MATUGUINAO ROAD) PHASE 3, BRGY. MABINI-TAYLOR-VICTORY-EL EMPON-POPONTON-CUENCO ROAD, LAS NAVAS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱97.9M | 55% | High risk92 | Flagged0.071 |
| 5 | 25II0023CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHAB. OF LAS NAVAS FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, CATUBIG RIVER BASIN, LAS NAVAS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱34.3M | 97% | High risk86 | —-0.015 |
| 6 | 24I00001CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP) - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱145.8M | 95% | High risk84 | Flagged0.026 |
| 7 | 22I00041CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TOURISM DESTINATIONS - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱158.7M | 90% | High risk65 | —-0.012 |
| 8 | 23I00022CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP) - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱152.5M | 94% | High risk65 | —-0.024 |
| 9 | 23I00094NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - PANGPANG - PALAPAG - MAPANAS - GAMAY - LAPINIG RD - K0835+554 - K0836+060, K0836+160 - K0836+220, K0836+260 - K0837+750, K0838+000 - K0839+090, K0839+660 - K0839+800, K0839+965 - K0840+052.50, NORTHE | Region VIII | Region VIII | On-Going | ₱193M | 92% | High risk64 | —-0.015 |
| 10 | 24II0102CONCRETING OF BUGAY-GEGUINTA-BUGTUSAN-MABINI-TAYLOR-VICTORY-EL EMPON-POPONTON-CUENCO, LAS NAVAS - MATUGUINAO ROAD, PHASE IV, BRGY. BUGAY-GEGUINTA-BUGTUSAN-MABINI-TAYLOR-VICTORY-EL EMPON-POPONTON-CUENCO, LAS NAVAS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | On-Going | ₱65.6M | 45% | Medium risk60 | Flagged0.019 |
| 11 | 25I00039ASSET PRESERVATION - REHABILITATION//RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0833+560 - K0833+900, K0834+299 - K0834+460, K0839+000 - K0839+786, K0840+200 - K0840+300, K0851+740 - | Region VIII | Region VIII | On-Going | ₱58.1M | 72% | Medium risk57 | —-0.048 |
| 12 | 21II0024CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱87.3M | 100% | Medium risk55 | —-0.073 |
| 13 | 20II0031CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PINIPISAKAN FALLS, SAN ISIDRO, LAS NAVAS, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱88.2M | 100% | Medium risk55 | —-0.082 |
| 14 | 23IJ0011CSSP: ACCESS ROAD LEADING TO PINIPISAKAN FALLS, SAN JORGE, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱49M | 100% | Medium risk53 | —-0.094 |
| 15 | 23IJ0034CSSP: CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TAGAPUL-AN, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.8M | 100% | Medium risk53 | —-0.095 |
| 16 | 24I00246BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES JUBASAN BR. 1 (B00249SM) ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR), NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | On-Going | ₱50.8M | 95% | Medium risk53 | —-0.023 |
| 17 | 23IJ0057CSSP: (RE-ADVERTISED) CONSTRUCTION OF ROAD, BRGY. BALOCAWE - NIPA TAGAPUL-AN, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.7M | 100% | Medium risk53 | —-0.095 |
| 18 | 23IJ0023CSSP: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), ACCESS ROAD LEADING TO BANGON FALLS, BRGY. TINAPLACAN, CALBAYOG CITY | Region VIII | Samar 1st DEO | Completed | ₱48.9M | 100% | Medium risk52 | —-0.094 |
| 19 | 21IK0003CONCRETING/REHAB. OF PABANOG-TIGBAWON ROAD (PHASE I), BRGY. PABANOG, TIGBAWON, PARANAS, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱29.1M | 100% | Medium risk50 | —-0.094 |
| 20 | 21IK0023CONCRETING OF LOCAL ROAD, BRGY. SAN VICENTE-PALANTUGON-ALBALATE, CATBALOGAN CITY, BRGY. SAN VICENTE, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱38.6M | 100% | Medium risk50 | —-0.089 |
| 21 | 21IK0002REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROAD-SECONDARY ROAD, BRGY. CAN-ABAY, BASEY, SAMAR ALONG SAN JUANICO-BASEY-SOHOTON ROAD, K0901+000-K0901+330 | Region VIII | Samar 2nd DEO | Completed | ₱14.3M | 100% | Medium risk49 | —-0.095 |
| 22 | 20OE0229CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - BUILDINGS & OTHER STRUCTURES - MULTIPURPOSE / FACILITIES -RETROFITTING/ STRENGTHENING OF PUBLIC BUILDINGS IN PREPARATION FOR THE BIG ONE - CENTENO BUIL | National Capital Region | North Manila DEO | Completed | ₱24.1M | 100% | Medium risk49 | —-0.101 |
| 23 | 20IH0008ROAD WIDENING - DAANG MAHARLIKA RD (SM) (SAN ISIDRO - SAN JUANICO BR.) - K0690+400 - K0691+250, VICTORIA, N. SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱31.1M | 100% | Medium risk49 | —-0.095 |
| 24 | 21IK0006PREVENTIVE MAINT. - SECONDARY ROADS ALONG SAN JUANICO - BASEY - SOHOTON ROAD, K0902+000 - K0902+523, BRGY. CAN-ABAY, BASEY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱5.8M | 100% | Medium risk49 | —-0.095 |
| 25 | 24IJ0099CSSP: CONSTRUCTION OF ROAD, BRGY. SAN AGUSTIN - BRGY. HINOGACAN ROAD, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱20.7M | 100% | Medium risk49 | —-0.059 |