Contractor dossier
231 projects on file, including joint ventures this contractor is part of.
Total projects
231
Total budget
₱8.8B
Average progress
93.1%
Completion rate
79.2%
Average risk score
47.2
Medium risk on average, out of 100
Flagged as unusual
6
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 146 | ₱6.3B | 47.0 | 4 | 92.9% |
| National Capital Region | 78 | ₱2.2B | 47.3 | 2 | 93.1% |
| Region IV-A | 7 | ₱311.5M | 50.6 | 0 | 96.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱3.8B | 45.5 | 3 | 93.1% |
| Flood Control and Drainage | 89 | ₱4.5B | 48.4 | 3 | 92.3% |
| Bridges | 9 | ₱269M | 42.9 | 0 | 100.0% |
| OTHER | 8 | ₱103.5M | 61.0 | 0 | 100.0% |
| Buildings and Facilities | 6 | ₱92.3M | 51.1 | 0 | 83.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24C00491SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT B), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 78% | High risk81 | —-0.014 |
| 25C00370SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 4, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 25C00369SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 3, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 24C00472FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2, PHASE 3, BARANGAY GARLANG, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱95M | 99% | High risk81 | —-0.020 |
| 25CP0046FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD PROTECTION STRUCTURE ALONG BUBULONG-GARLANG RIVERWAY, ZONE A, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 55% | High risk81 | —-0.009 |
| 25CC0098CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE C), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 88% | High risk81 | —-0.022 |
| 24C00490SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT A), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱96.5M | 88% | High risk80 | —-0.018 |
| 24C00471FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2,PHASE 2, BARANGAY GARLANG, SAN ILDEFONSO, BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0423CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CC0099CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE D), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 88% | High risk76 | —-0.029 |
| 24C00487SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT B),BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱90.3M | 87% | High risk76 | —-0.018 |
| 24C00488SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT C), BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱90.3M | 95% | High risk76 | —-0.021 |
| 25CD0080CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (NLEX - LAMBAKIN SECTION), STA. 10+300 - STA. 10+525, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱72.4M | 78% | High risk76 | —-0.025 |
| 25CC0266SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE3341-7330, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱91.1M | 74% | High risk74 | —-0.027 |
| 25CD0184REHABILITATION OF ROAD, BARANGAY PULONG BUHANGIN AND BARANGAY MAG-ASAWANG SAPA, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱77.7M | 8% | High risk74 | —-0.011 |
| 25CD0138REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA NORZAGARAY RD K0041+000 - K0041+1051, K0042+833 - K0042+1004 | Region III | Bulacan 2nd DEO | On-Going | ₱52.1M | 25% | High risk73 | —-0.019 |
| 25CC0275SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE 7330-9530, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱50.6M | 72% | High risk73 | —-0.032 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 25CD0183CONSTRUCTION OF ROADS AND DRAINAGE AT NORTHVILLE 1, BARANGAY LIBTONG, MEYCAUAYAN CITY (PHASE 1) | Region III | Bulacan 2nd DEO | On-Going | ₱48.5M | 22% | High risk72 | —-0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24OF0300PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONGRESSIONAL AVE (S05266LZ) - K0013+(-065) - K0011+1234, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 0% | High risk64 | Flagged0.030 |
| 23C00361ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk70 | Flagged0.029 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 24OF0301PREVENTIVE MAINTENANCE - TERTIARY ROADS - SCT. ALCARAZ (S05342LZ) - K0007+(-860) - K0007+649, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 89% | High risk64 | Flagged0.007 |
| 24CD0313REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIES REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG TUMANA MACAIBAN BRIDGE, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱18.7M | 97% | Medium risk43 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 2 | 24C00491SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT B), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 78% | High risk81 | —-0.014 |
| 3 | 25C00370SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 4, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 4 | 25C00369SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 3, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 5 | 24C00472FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2, PHASE 3, BARANGAY GARLANG, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱95M | 99% | High risk81 | —-0.020 |
| 6 | 25CP0046FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD PROTECTION STRUCTURE ALONG BUBULONG-GARLANG RIVERWAY, ZONE A, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 55% | High risk81 | —-0.009 |
| 7 | 25CC0098CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE C), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 88% | High risk81 | —-0.022 |
| 8 | 24C00490SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT A), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱96.5M | 88% | High risk80 | —-0.018 |
| 9 | 24C00471FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2,PHASE 2, BARANGAY GARLANG, SAN ILDEFONSO, BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 10 | 24CC0423CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 11 | 25CC0099CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE D), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 88% | High risk76 | —-0.029 |
| 12 | 24C00487SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT B),BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱90.3M | 87% | High risk76 | —-0.018 |
| 13 | 24C00488SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT C), BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱90.3M | 95% | High risk76 | —-0.021 |
| 14 | 25CD0080CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (NLEX - LAMBAKIN SECTION), STA. 10+300 - STA. 10+525, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱72.4M | 78% | High risk76 | —-0.025 |
| 15 | 25CC0266SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE3341-7330, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱91.1M | 74% | High risk74 | —-0.027 |
| 16 | 25CD0184REHABILITATION OF ROAD, BARANGAY PULONG BUHANGIN AND BARANGAY MAG-ASAWANG SAPA, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱77.7M | 8% | High risk74 | —-0.011 |
| 17 | 25CD0138REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA NORZAGARAY RD K0041+000 - K0041+1051, K0042+833 - K0042+1004 | Region III | Bulacan 2nd DEO | On-Going | ₱52.1M | 25% | High risk73 | —-0.019 |
| 18 | 25CC0275SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE 7330-9530, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱50.6M | 72% | High risk73 | —-0.032 |
| 19 | 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 20 | 25CD0183CONSTRUCTION OF ROADS AND DRAINAGE AT NORTHVILLE 1, BARANGAY LIBTONG, MEYCAUAYAN CITY (PHASE 1) | Region III | Bulacan 2nd DEO | On-Going | ₱48.5M | 22% | High risk72 | —-0.019 |
| 21 | 25CP0166CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, TALBAK ELEMENTARY SCHOOL, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱17.6M | 4% | High risk71 | —-0.011 |
| 22 | 25CC0218ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - BOCAUE-SN JOSE RD - K0027+(-121)-K0027+594-K0027+800-K0028+269, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱24.4M | 89% | High risk70 | —-0.041 |
| 23 | 24CC0060ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BOCAUE-SN JOSE RD - K0027+000 - K0027+074, K0029+(-177) - K0029+391, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱25M | 100% | High risk70 | —-0.069 |
| 24 | 25CD0139REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA - NORZAGARAY RD K0033+900 - K0033+1010, K0034+000 - K0034+350, K0040+642 - K0040+1003 | Region III | Bulacan 2nd DEO | On-Going | ₱39.7M | 23% | High risk70 | —-0.020 |
| 25 | 25CC0025NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT- TERTIARY ROADS-BOCAUE-SN JOSE RD - K0027+000-K0028+269, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱18.4M | 100% | High risk70 | —-0.044 |