Contractor dossier
231 projects on file, including joint ventures this contractor is part of.
Total projects
231
Total budget
₱8.8B
Average progress
93.1%
Completion rate
79.2%
Average risk score
47.2
Medium risk on average, out of 100
Flagged as unusual
6
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 146 | ₱6.3B | 47.0 | 4 | 92.9% |
| National Capital Region | 78 | ₱2.2B | 47.3 | 2 | 93.1% |
| Region IV-A | 7 | ₱311.5M | 50.6 | 0 | 96.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱3.8B | 45.5 | 3 | 93.1% |
| Flood Control and Drainage | 89 | ₱4.5B | 48.4 | 3 | 92.3% |
| Bridges | 9 | ₱269M | 42.9 | 0 | 100.0% |
| OTHER | 8 | ₱103.5M | 61.0 | 0 | 100.0% |
| Buildings and Facilities | 6 | ₱92.3M | 51.1 | 0 | 83.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24C00491SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT B), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 78% | High risk81 | —-0.014 |
| 25C00370SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 4, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 25C00369SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 3, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 24C00472FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2, PHASE 3, BARANGAY GARLANG, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱95M | 99% | High risk81 | —-0.020 |
| 25CP0046FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD PROTECTION STRUCTURE ALONG BUBULONG-GARLANG RIVERWAY, ZONE A, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 55% | High risk81 | —-0.009 |
| 25CC0098CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE C), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 88% | High risk81 | —-0.022 |
| 24C00490SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT A), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱96.5M | 88% | High risk80 | —-0.018 |
| 24C00471FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2,PHASE 2, BARANGAY GARLANG, SAN ILDEFONSO, BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0423CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CC0099CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE D), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 88% | High risk76 | —-0.029 |
| 24C00487SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT B),BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱90.3M | 87% | High risk76 | —-0.018 |
| 24C00488SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT C), BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱90.3M | 95% | High risk76 | —-0.021 |
| 25CD0080CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (NLEX - LAMBAKIN SECTION), STA. 10+300 - STA. 10+525, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱72.4M | 78% | High risk76 | —-0.025 |
| 25CC0266SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE3341-7330, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱91.1M | 74% | High risk74 | —-0.027 |
| 25CD0184REHABILITATION OF ROAD, BARANGAY PULONG BUHANGIN AND BARANGAY MAG-ASAWANG SAPA, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱77.7M | 8% | High risk74 | —-0.011 |
| 25CD0138REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA NORZAGARAY RD K0041+000 - K0041+1051, K0042+833 - K0042+1004 | Region III | Bulacan 2nd DEO | On-Going | ₱52.1M | 25% | High risk73 | —-0.019 |
| 25CC0275SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE 7330-9530, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱50.6M | 72% | High risk73 | —-0.032 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 25CD0183CONSTRUCTION OF ROADS AND DRAINAGE AT NORTHVILLE 1, BARANGAY LIBTONG, MEYCAUAYAN CITY (PHASE 1) | Region III | Bulacan 2nd DEO | On-Going | ₱48.5M | 22% | High risk72 | —-0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24OF0300PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONGRESSIONAL AVE (S05266LZ) - K0013+(-065) - K0011+1234, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 0% | High risk64 | Flagged0.030 |
| 23C00361ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk70 | Flagged0.029 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 24OF0301PREVENTIVE MAINTENANCE - TERTIARY ROADS - SCT. ALCARAZ (S05342LZ) - K0007+(-860) - K0007+649, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 89% | High risk64 | Flagged0.007 |
| 24CD0313REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIES REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG TUMANA MACAIBAN BRIDGE, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱18.7M | 97% | Medium risk43 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 21OF0194CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF MULTI-PURPOSE BUILDING BAGONG SILANGAN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱16.2M | 100% | Medium risk49 | —-0.101 |
| 77 | 22OB0340REHABILITATION OF NANGKA FIRE STATION, BARANGAY NANGKA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱7.6M | 100% | Medium risk48 | —-0.104 |
| 78 | 19OB0274CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY FORTUNE, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱8.6M | 100% | Medium risk48 | —-0.104 |
| 79 | 25OB0262CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, NANGKA RIVER,MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱46.8M | 34% | Medium risk47 | —-0.037 |
| 80 | 20DQ0038LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROAD LEADING TO THE PUBLIC UNIVERSITY, BUROL MAIN, DASMARIÑAS, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱28.9M | 100% | Medium risk47 | —-0.093 |
| 81 | 21DQ0072LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - ROAD WIDENING WITH DRAINAGE OF CITY ROAD SITUATED AT BARANGAYS ST. PETER I AND ST. PETER II, DASMARIÑAS CITY, CAVITE AND ROAD WIDENING WITH DRAINAGE OF CITY ROAD PABLO | Region IV-A | Cavite 3rd DEO | Completed | ₱37.6M | 100% | Medium risk47 | —-0.102 |
| 82 | 23OB0403CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. TUMANA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱46.7M | 100% | Medium risk47 | —-0.087 |
| 83 | 21OF0046REHABILITATION OF ROAD AT BRGY. PAYATAS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱38.4M | 100% | Medium risk47 | —-0.095 |
| 84 | 17OE0003MFO 2-FLOOD MANAGEMENT SERVICES CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-JOSEFINA-LEPANTO DRAINAGE MAIN, SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱6.4M | 100% | Medium risk47 | —-0.063 |
| 85 | 24OB0346REHABILITATION OF MERCEDES AVENUE, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱28.8M | 100% | Medium risk47 | —-0.097 |
| 86 | 24OF0039REHABILITATION OF ROAD, TIERRA PURA, BARANGAY CULIAT, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.098 |
| 87 | 24OB0343REHABILITATION OF JENNY`S AVENUE EXTENSION, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱28.8M | 100% | Medium risk47 | —-0.098 |
| 88 | 24OB0350REHABILITATION OF ST. PAUL ROAD, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱28.8M | 100% | Medium risk47 | —-0.099 |
| 89 | 21OF0045REHABILITATION OF ROAD AT BRGY. BAGONG SILANGAN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱37.6M | 100% | Medium risk47 | —-0.095 |
| 90 | 21OB0172RETROFITTING/STRENGTHENING OF NANGKA BR (B01341LZ) ALONG MARIKINA-SN MATEO RD., MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.2M | 100% | Medium risk47 | —-0.065 |
| 91 | 23OB0264IMPROVEMENT OF FORTUNE BRIDGE, BARANGAY FORTUNE, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.066 |
| 92 | 25OB0117RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - STO. ROSARIO BR. (B01879LZ) ALONG PPTA RD | National Capital Region | Metro Manila 1st DEO | On-Going | ₱9.4M | 100% | Medium risk47 | —-0.041 |
| 93 | 19DQ0127ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF REVETMENT FROM BALUCTOT R | Region IV-A | Region IV-A | Completed | ₱19.5M | 100% | Medium risk46 | —-0.087 |
| 94 | 25OB0084IMPROVEMENT OF EASTBANK ROAD, BARANGAY SANTA LUCIA, PASIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱19.4M | 90% | Medium risk46 | —-0.066 |
| 95 | 22OB0186PREVENTIVE MAINTENANCE ALONG MARCOS HIGHWAY - K0014 + 000 - K0014 + 606, K0015 + 1262 - K0014 + 000, K0015 + 578 - K0015 + 946 | National Capital Region | Metro Manila 1st DEO | Completed | ₱26.8M | 100% | Medium risk46 | —-0.095 |
| 96 | 25OB0082REHABILITATION OF ROAD AT PEARL DRIVE, BARANGAY SAN ANTONIO, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱24M | 100% | Medium risk46 | —-0.099 |
| 97 | 20DQ0099LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING/REHABILITATION OF ROAD, BRGY. PALIPARAN 3, DASMARIÑAS CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱9.7M | 100% | Medium risk46 | —-0.109 |
| 98 | 20OF0248CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱28.2M | 100% | Medium risk46 | —-0.070 |
| 99 | 20OF0184CONSTRUCTION / REHABILITATION OF KALAYAAN B, BRGY. BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱18.9M | 100% | Medium risk46 | —-0.095 |
| 100 | 19DQ0106LOCAL PROGRAM- LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROAD, BRGY. ZONE 1-A, DASMARIÑAS, CAVITE | Region IV-A | Region IV-A | Completed | ₱9.4M | 100% | Medium risk46 | —-0.109 |