Contractor dossier
231 projects on file, including joint ventures this contractor is part of.
Total projects
231
Total budget
₱8.8B
Average progress
93.1%
Completion rate
79.2%
Average risk score
47.2
Medium risk on average, out of 100
Flagged as unusual
6
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 146 | ₱6.3B | 47.0 | 4 | 92.9% |
| National Capital Region | 78 | ₱2.2B | 47.3 | 2 | 93.1% |
| Region IV-A | 7 | ₱311.5M | 50.6 | 0 | 96.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱3.8B | 45.5 | 3 | 93.1% |
| Flood Control and Drainage | 89 | ₱4.5B | 48.4 | 3 | 92.3% |
| Bridges | 9 | ₱269M | 42.9 | 0 | 100.0% |
| OTHER | 8 | ₱103.5M | 61.0 | 0 | 100.0% |
| Buildings and Facilities | 6 | ₱92.3M | 51.1 | 0 | 83.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24C00491SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT B), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 78% | High risk81 | —-0.014 |
| 25C00370SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 4, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 25C00369SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 3, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 24C00472FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2, PHASE 3, BARANGAY GARLANG, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱95M | 99% | High risk81 | —-0.020 |
| 25CP0046FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD PROTECTION STRUCTURE ALONG BUBULONG-GARLANG RIVERWAY, ZONE A, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 55% | High risk81 | —-0.009 |
| 25CC0098CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE C), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 88% | High risk81 | —-0.022 |
| 24C00490SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT A), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱96.5M | 88% | High risk80 | —-0.018 |
| 24C00471FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2,PHASE 2, BARANGAY GARLANG, SAN ILDEFONSO, BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0423CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CC0099CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE D), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 88% | High risk76 | —-0.029 |
| 24C00487SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT B),BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱90.3M | 87% | High risk76 | —-0.018 |
| 24C00488SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT C), BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱90.3M | 95% | High risk76 | —-0.021 |
| 25CD0080CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (NLEX - LAMBAKIN SECTION), STA. 10+300 - STA. 10+525, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱72.4M | 78% | High risk76 | —-0.025 |
| 25CC0266SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE3341-7330, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱91.1M | 74% | High risk74 | —-0.027 |
| 25CD0184REHABILITATION OF ROAD, BARANGAY PULONG BUHANGIN AND BARANGAY MAG-ASAWANG SAPA, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱77.7M | 8% | High risk74 | —-0.011 |
| 25CD0138REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA NORZAGARAY RD K0041+000 - K0041+1051, K0042+833 - K0042+1004 | Region III | Bulacan 2nd DEO | On-Going | ₱52.1M | 25% | High risk73 | —-0.019 |
| 25CC0275SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE 7330-9530, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱50.6M | 72% | High risk73 | —-0.032 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 25CD0183CONSTRUCTION OF ROADS AND DRAINAGE AT NORTHVILLE 1, BARANGAY LIBTONG, MEYCAUAYAN CITY (PHASE 1) | Region III | Bulacan 2nd DEO | On-Going | ₱48.5M | 22% | High risk72 | —-0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24OF0300PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONGRESSIONAL AVE (S05266LZ) - K0013+(-065) - K0011+1234, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 0% | High risk64 | Flagged0.030 |
| 23C00361ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk70 | Flagged0.029 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 24OF0301PREVENTIVE MAINTENANCE - TERTIARY ROADS - SCT. ALCARAZ (S05342LZ) - K0007+(-860) - K0007+649, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 89% | High risk64 | Flagged0.007 |
| 24CD0313REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIES REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG TUMANA MACAIBAN BRIDGE, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱18.7M | 97% | Medium risk43 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20OB0208REHABILITATION OF ROADS, BARANGAY WESTERN BICUTAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱16M | 100% | Medium risk46 | —-0.099 |
| 102 | 23OB0229REHABILITATION OF ROAD NETWORK, BARANGAY FORTUNE, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.095 |
| 103 | 23OB0225REHABILITATION OF BALITE DRIVE ROAD NETWORK, BARANGAY FORTUNE, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14.1M | 100% | Medium risk46 | —-0.096 |
| 104 | 23OB0034CONSTRUCTION OF BOX CULVERT ALONG SUMMER HOMES, BARANGAY CONCEPCION UNO, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.075 |
| 105 | 23OB0239CONSTRUCTION OF RCBC DRAINAGE SYSTEM, BARANGAY TUMANA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.086 |
| 106 | 23OB0240CONSTRUCTION OF DRAINAGE OUTFALL, SECOND DISTRICT, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.088 |
| 107 | 24OB0363REHABILITATION OF BARANGAY FORTUNE ROAD NETWORK, BARANGAY FORTUNE, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱19.2M | 46% | Medium risk46 | —-0.044 |
| 108 | 22OB0213REHABILITATION OF ROAD NETWORK, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱27.9M | 100% | Medium risk46 | —-0.098 |
| 109 | 25OB0263REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG NANGKA RIVER, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱37.4M | 37% | Medium risk46 | —-0.040 |
| 110 | 20OB0389IMPROVEMENT OF IWAHIG CREEK, BARANGAY TUMANA, MARIKINA CITY CONTRACT LOCATION: MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14.3M | 100% | Medium risk46 | —-0.088 |
| 111 | 25OB0311REHABILITATION OF ROAD NETWORK ALONG BALUBAD STREET NHA INCLUDING LATERALS, BARANGAY NANGKA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱19.2M | 100% | Medium risk46 | —-0.096 |
| 112 | 20OB0401REHABILITATION OF DRAINAGE SYSTEM INCLUDING LATERALS, BARANGAY NANGKA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱27.5M | 100% | Medium risk46 | —-0.087 |
| 113 | 24OB0331IMPROVEMENT WORKS ALONG MARIKINA RIVER, SECOND DISTRICT, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.085 |
| 114 | 25OB0268REHABILITATION OF DRAINAGE SYSTEM AT BARANGAY PINAGBUHATAN, PASIG CITY (PHASE 5) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱14M | 18% | Medium risk46 | —-0.032 |
| 115 | 25OB0269REHABILITATION OF DRAINAGE SYSTEM AT BARANGAY PINAGBUHATAN, PASIG CITY (PHASE 6) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱14M | 59% | Medium risk46 | —-0.044 |
| 116 | 24OB0098REHABILITATION OF DRAINAGE SYSTEM WITHIN CIUDAD GRANDE AND VICINITY, BARANGAY ROSARIO, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.089 |
| 117 | 21OB0177IMPROVEMENT OF BALANTI AND GREEN PUMPING STATION, BARANGAY CONCEPCION DOS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱27.9M | 100% | Medium risk46 | —-0.085 |
| 118 | 23OB0263REHABILITATION OF TWINRIVER SUBDIVISION ROAD NETWORK INCLUDING LATERALS, BARANGAY PARANG, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14M | 100% | Medium risk46 | —-0.095 |
| 119 | 23OB0215IMPROVEMENT OF ROAD, TWINRIVER SUBDIVISION, BARANGAY NANGKA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14M | 100% | Medium risk46 | —-0.095 |
| 120 | 23OB0227IMPROVEMENT OF TWINVILLE SUBDIVISION ROAD NETWORK, SECOND DISTRICT, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.095 |
| 121 | 23OB0260REHABILITATION OF GREENLAND PHASE 1 ROAD NETWORK INCLUDING LATERALS, BARANGAY NANGKA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14M | 100% | Medium risk46 | —-0.095 |
| 122 | 22OB0208REHABILITATION OF ROAD NETWORK INCLUDING LATERALS, BARANGAY MARIKINA HEIGHTS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.095 |
| 123 | 23OB0230REHABILITATION OF TANGUILE STREET ROAD NETWORK, BARANGAY MARIKINA HEIGHTS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.095 |
| 124 | 23OB0267REPAIR/REHABILITATION OF ROAD NETWORK PHASE 2, MARIKINA CITY, SECOND DISTRICT | National Capital Region | Metro Manila 1st DEO | Completed | ₱14M | 100% | Medium risk46 | —-0.096 |
| 125 | 23OB0235REHABILITATION OF ROAD NETWORK, BARANGAY NANGKA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱13.9M | 100% | Medium risk46 | —-0.096 |