Contractor dossier
231 projects on file, including joint ventures this contractor is part of.
Total projects
231
Total budget
₱8.8B
Average progress
93.1%
Completion rate
79.2%
Average risk score
47.2
Medium risk on average, out of 100
Flagged as unusual
6
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 146 | ₱6.3B | 47.0 | 4 | 92.9% |
| National Capital Region | 78 | ₱2.2B | 47.3 | 2 | 93.1% |
| Region IV-A | 7 | ₱311.5M | 50.6 | 0 | 96.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱3.8B | 45.5 | 3 | 93.1% |
| Flood Control and Drainage | 89 | ₱4.5B | 48.4 | 3 | 92.3% |
| Bridges | 9 | ₱269M | 42.9 | 0 | 100.0% |
| OTHER | 8 | ₱103.5M | 61.0 | 0 | 100.0% |
| Buildings and Facilities | 6 | ₱92.3M | 51.1 | 0 | 83.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24C00491SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT B), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 78% | High risk81 | —-0.014 |
| 25C00370SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 4, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 25C00369SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 3, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 24C00472FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2, PHASE 3, BARANGAY GARLANG, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱95M | 99% | High risk81 | —-0.020 |
| 25CP0046FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD PROTECTION STRUCTURE ALONG BUBULONG-GARLANG RIVERWAY, ZONE A, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 55% | High risk81 | —-0.009 |
| 25CC0098CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE C), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 88% | High risk81 | —-0.022 |
| 24C00490SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT A), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱96.5M | 88% | High risk80 | —-0.018 |
| 24C00471FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2,PHASE 2, BARANGAY GARLANG, SAN ILDEFONSO, BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0423CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CC0099CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE D), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 88% | High risk76 | —-0.029 |
| 24C00487SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT B),BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱90.3M | 87% | High risk76 | —-0.018 |
| 24C00488SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT C), BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱90.3M | 95% | High risk76 | —-0.021 |
| 25CD0080CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (NLEX - LAMBAKIN SECTION), STA. 10+300 - STA. 10+525, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱72.4M | 78% | High risk76 | —-0.025 |
| 25CC0266SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE3341-7330, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱91.1M | 74% | High risk74 | —-0.027 |
| 25CD0184REHABILITATION OF ROAD, BARANGAY PULONG BUHANGIN AND BARANGAY MAG-ASAWANG SAPA, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱77.7M | 8% | High risk74 | —-0.011 |
| 25CD0138REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA NORZAGARAY RD K0041+000 - K0041+1051, K0042+833 - K0042+1004 | Region III | Bulacan 2nd DEO | On-Going | ₱52.1M | 25% | High risk73 | —-0.019 |
| 25CC0275SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE 7330-9530, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱50.6M | 72% | High risk73 | —-0.032 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 25CD0183CONSTRUCTION OF ROADS AND DRAINAGE AT NORTHVILLE 1, BARANGAY LIBTONG, MEYCAUAYAN CITY (PHASE 1) | Region III | Bulacan 2nd DEO | On-Going | ₱48.5M | 22% | High risk72 | —-0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24OF0300PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONGRESSIONAL AVE (S05266LZ) - K0013+(-065) - K0011+1234, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 0% | High risk64 | Flagged0.030 |
| 23C00361ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk70 | Flagged0.029 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 24OF0301PREVENTIVE MAINTENANCE - TERTIARY ROADS - SCT. ALCARAZ (S05342LZ) - K0007+(-860) - K0007+649, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 89% | High risk64 | Flagged0.007 |
| 24CD0313REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIES REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG TUMANA MACAIBAN BRIDGE, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱18.7M | 97% | Medium risk43 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 25OB0314REHABILITATION OF TWINVILLE SUBDIVISION ROAD NETWORK, SECOND DISTRICT, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.098 |
| 127 | 22OB0301REHABILITATION OF PINALAD ROAD, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱5.6M | 100% | Medium risk46 | —-0.098 |
| 128 | 24OB0342REHABILITATION OF ALFONSO ST., BARANGAY ROSARIO, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.098 |
| 129 | 22OB0303REHABILITATION OF ROAD, M. EUSEBIO AVENUE, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱8.4M | 100% | Medium risk46 | —-0.099 |
| 130 | 23OB0209REHABILITATION OF ROAD, LA COLINA SUBDIVISION, SECOND DISTRICT, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.099 |
| 131 | 24OB0345REHABILITATION OF LUIS ST., PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.099 |
| 132 | 21OB0141REHABILITATION OF ROADS AT BRGY. NORTH SIGNAL, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱6.6M | 100% | Medium risk46 | —-0.098 |
| 133 | 20OB0137IMPROVEMENT OF BARANGAYS ROADS, SOUTH SIGNAL, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.100 |
| 134 | 24OB0046IMPROVEMENT ALONG BALANTI CREEK, SECOND DISTRICT, MARIKINA CITY, PHASE 3 | National Capital Region | Metro Manila 1st DEO | Completed | ₱39.2M | 100% | Medium risk45 | —-0.088 |
| 135 | 23OB0212CONSTRUCTION OF SLOPE PROTECTION, BRGY. FORTUNE, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱41.9M | 100% | Medium risk45 | —-0.089 |
| 136 | 21OB0186REHABILITATION OF FLOOD CONTROL STRUCTURES, BALANTI CREEK, BARANGAY CONCEPCION DOS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.080 |
| 137 | 21OB0263IMPROVEMENT OF NANGKA RIVER, SECOND DISTRICT, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.088 |
| 138 | 21OB0176IMPROVEMENT ALONG NANGKA RIVER, ROLLING HILLS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱27.5M | 100% | Medium risk45 | —-0.089 |
| 139 | 20OB0400CONSTRUCTION/REHABILITATION OF SLOPE PROTECTION, SECOND DISTRICT, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.2M | 100% | Medium risk45 | —-0.088 |
| 140 | 19OB0267IMPROVEMENT OF NANGKA RIVER, BRGY. PARANG, MARIKINA CITY (BOYSTOWN) | National Capital Region | Metro Manila 1st DEO | Completed | ₱18.3M | 100% | Medium risk45 | —-0.090 |
| 141 | 21OB0260CONSTRUCTION/REHABILITATION OF GRAVITY WALL ALONG NANGKA RIVER, SAN MIGUEL COMPOUND PHASE 2, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.090 |
| 142 | 23OB0238RIVER IMPROVEMENT ALONG NANGKA RIVER PHASE 2, NANGKA RIVER, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.087 |
| 143 | 19OB0446IMPROVEMENT OF CHAMPACA CREEK INCLUDING DRAINAGE LATERAL BRGY. FORTUNE, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱6.9M | 100% | Medium risk45 | —-0.089 |
| 144 | 20OF0268CONSTRUCTION/ REHABILITATION OF ISIDORA WELFARE COMPLEX, BRGY. HOLY SPIRIT, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱14.2M | 100% | Medium risk45 | —-0.064 |
| 145 | 23CC0569CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG ANGAT RIVER BRGY. POBLACION PLARIDEL, BULACAN STA. 020+409 TO STA. 020+709 | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk43 | —-0.026 |
| 146 | 23CC0568CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG ANGAT RIVER BRGY. SIPAT PLARIDEL, BULACAN STA. 026+291 TO STA. 026+591 | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk43 | —-0.026 |
| 147 | 23CC0567CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG ANGAT RIVER SIPAT PLARIDEL, BULACAN STA. 025+530 TO STA. 025+830 | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk43 | —-0.026 |
| 148 | 24CD0313REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIES REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG TUMANA MACAIBAN BRIDGE, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱18.7M | 97% | Medium risk43 | Flagged0.002 |
| 149 | 24CD0094CONSTRUCTION MACAIBAN PATAG ROAD DIKE PHASE 7, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱72.4M | 100% | Medium risk41 | —-0.098 |
| 150 | 24CD0092CONSTRUCTION MACAIBAN PATAG ROAD DIKE PHASE 5, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱72.4M | 100% | Medium risk41 | —-0.098 |