Contractor dossier
231 projects on file, including joint ventures this contractor is part of.
Total projects
231
Total budget
₱8.8B
Average progress
93.1%
Completion rate
79.2%
Average risk score
47.2
Medium risk on average, out of 100
Flagged as unusual
6
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 146 | ₱6.3B | 47.0 | 4 | 92.9% |
| National Capital Region | 78 | ₱2.2B | 47.3 | 2 | 93.1% |
| Region IV-A | 7 | ₱311.5M | 50.6 | 0 | 96.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱3.8B | 45.5 | 3 | 93.1% |
| Flood Control and Drainage | 89 | ₱4.5B | 48.4 | 3 | 92.3% |
| Bridges | 9 | ₱269M | 42.9 | 0 | 100.0% |
| OTHER | 8 | ₱103.5M | 61.0 | 0 | 100.0% |
| Buildings and Facilities | 6 | ₱92.3M | 51.1 | 0 | 83.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24C00491SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT B), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 78% | High risk81 | —-0.014 |
| 25C00370SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 4, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 25C00369SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 3, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 24C00472FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2, PHASE 3, BARANGAY GARLANG, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱95M | 99% | High risk81 | —-0.020 |
| 25CP0046FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD PROTECTION STRUCTURE ALONG BUBULONG-GARLANG RIVERWAY, ZONE A, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 55% | High risk81 | —-0.009 |
| 25CC0098CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE C), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 88% | High risk81 | —-0.022 |
| 24C00490SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT A), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱96.5M | 88% | High risk80 | —-0.018 |
| 24C00471FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2,PHASE 2, BARANGAY GARLANG, SAN ILDEFONSO, BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0423CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CC0099CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE D), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 88% | High risk76 | —-0.029 |
| 24C00487SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT B),BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱90.3M | 87% | High risk76 | —-0.018 |
| 24C00488SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT C), BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱90.3M | 95% | High risk76 | —-0.021 |
| 25CD0080CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (NLEX - LAMBAKIN SECTION), STA. 10+300 - STA. 10+525, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱72.4M | 78% | High risk76 | —-0.025 |
| 25CC0266SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE3341-7330, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱91.1M | 74% | High risk74 | —-0.027 |
| 25CD0184REHABILITATION OF ROAD, BARANGAY PULONG BUHANGIN AND BARANGAY MAG-ASAWANG SAPA, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱77.7M | 8% | High risk74 | —-0.011 |
| 25CD0138REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA NORZAGARAY RD K0041+000 - K0041+1051, K0042+833 - K0042+1004 | Region III | Bulacan 2nd DEO | On-Going | ₱52.1M | 25% | High risk73 | —-0.019 |
| 25CC0275SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE 7330-9530, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱50.6M | 72% | High risk73 | —-0.032 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 25CD0183CONSTRUCTION OF ROADS AND DRAINAGE AT NORTHVILLE 1, BARANGAY LIBTONG, MEYCAUAYAN CITY (PHASE 1) | Region III | Bulacan 2nd DEO | On-Going | ₱48.5M | 22% | High risk72 | —-0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24OF0300PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONGRESSIONAL AVE (S05266LZ) - K0013+(-065) - K0011+1234, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 0% | High risk64 | Flagged0.030 |
| 23C00361ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk70 | Flagged0.029 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 24OF0301PREVENTIVE MAINTENANCE - TERTIARY ROADS - SCT. ALCARAZ (S05342LZ) - K0007+(-860) - K0007+649, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 89% | High risk64 | Flagged0.007 |
| 24CD0313REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIES REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG TUMANA MACAIBAN BRIDGE, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱18.7M | 97% | Medium risk43 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 24CD0091CONSTRUCTION MACAIBAN PATAG ROAD DIKE PHASE 4, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱72.3M | 100% | Medium risk41 | —-0.098 |
| 152 | 24CD0089CONSTRUCTION MACAIBAN PATAG ROAD DIKE PHASE 2, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱72.4M | 100% | Medium risk41 | —-0.098 |
| 153 | 24CD0090CONSTRUCTION MACAIBAN PATAG ROAD DIKE PHASE 3, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱72.4M | 100% | Medium risk41 | —-0.098 |
| 154 | 24CD0093CONSTRUCTION MACAIBAN PATAG ROAD DIKE PHASE 6, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱72.4M | 100% | Medium risk41 | —-0.098 |
| 155 | 23CD0142CONSTRUCTION OF STO. CRISTO DIVERSION ROAD (PHASE II), CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49M | 100% | Medium risk39 | —-0.101 |
| 156 | 23C00114NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, PULILAN-BALIUAG DIVERSION ROAD, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱74.9M | 100% | Medium risk39 | —-0.096 |
| 157 | 24CD0154CONSTRUCTION ROAD NETWORK AT PHILIPPINE ECONOMIC ZONE AUTHORITY (PEZA), BARANGAY MINUYAN PROPER, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49M | 100% | Medium risk39 | —-0.102 |
| 158 | 23C00291ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DOÑA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱47.5M | 100% | Medium risk38 | —-0.065 |
| 159 | 22CC0215CONSTRUCTION OF RIVERBANK PROTECTION ALONG BOCAUE RIVER, BRGY. CAINGIN, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱57.9M | 100% | Medium risk38 | —-0.088 |
| 160 | 24CD0130IMPROVEMENT OF ROAD, BARANGAY POBLACION, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49M | 100% | Medium risk38 | —-0.103 |
| 161 | 24CD0068ASSET PRESERVATION PROGRAM TERTIARY ROADS NCR/BULACAN BDRY-BIGTE-IPO DAM RD K0030+605 K0031+000, K0037+383.55 K0037+440 | Region III | Bulacan 2nd DEO | Completed | ₱14.3M | 100% | Medium risk37 | —-0.103 |
| 162 | 22CD0037REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE MEYCAUAYAN BR. (B01648LZ) ALONG MANILA NORTH ROAD, MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱9.6M | 100% | Medium risk37 | —-0.064 |
| 163 | 23C00234ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-OLD CAGAYAN VALLEY ROAD, SAN RAFAEL, BULACAN | Region III | Region III | Completed | ₱48.2M | 100% | Medium risk37 | —-0.104 |
| 164 | 25CD0090CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, MARUNGKO - SAN ROQUE SECTION, STA. 08+705 - STA. 09+005, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱65.5M | 71% | Medium risk37 | —-0.047 |
| 165 | 23C00280ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-ROAD CONSTRUCTION ALONG SIBUL-BIAK NA BATO, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱48.2M | 100% | Medium risk36 | —-0.103 |
| 166 | 23C00289ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - ROAD CONSTRUCTION ALONG DAANG MAHARLIKA ROAD, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱48.2M | 100% | Medium risk36 | —-0.103 |
| 167 | 19CD0082ASSET PRESERVATION PREVENTIVE MAINTENANCE ASPHALT OVERLAY - NCR/BULACAN BDRY. BIGTE IPO DAM ROAD K0030+290 - K0030+605 SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱7.5M | 100% | Medium risk36 | —-0.102 |
| 168 | 21CD0117ASSET PRESERVATION PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY MUZON TUNGKONG MANGA ROAD K0042+000 K0042+644.65 | Region III | Bulacan 2nd DEO | Completed | ₱9.1M | 100% | Medium risk36 | —-0.102 |
| 169 | 21CD0119ASSET PRESERVATION PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD K0037+102 K0037+383.55 | Region III | Bulacan 2nd DEO | Completed | ₱7.9M | 100% | Medium risk36 | —-0.102 |
| 170 | 23CC0171ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BOCAUE-SN JOSE RD - K0029+(-177) - K0029+173.5, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱16.7M | 100% | Medium risk36 | —-0.104 |
| 171 | 18CD0114PREVENTIVE MAINTENANCE - ASPHALT OVERLAY ALONG NCR/BULACAN BDRY. - BIGTE IPO DAM RD - K0029+000; K0029+985 | Region III | Bulacan 2nd DEO | Completed | ₱5.6M | 100% | Medium risk36 | —-0.101 |
| 172 | 20CD0035ASSET PRESERVATION - PREVENTIVE MAINTENANCE ASPHALT OVERLAY BOCAUE SAN JOSE ROAD K0040+000 - K0041+000; K0030+605 - K0031+812 | Region III | Bulacan 2nd DEO | Completed | ₱13.7M | 100% | Medium risk36 | —-0.102 |
| 173 | 22CC0187CONSTRUCTION OF RIVERBANK PROTECTION ALONG BALAGTAS RIVER BRGY. SANTOL, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱57.9M | 100% | Medium risk36 | —-0.088 |
| 174 | 23C00231FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BARANGAY SALANGAN, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱52.2M | 100% | Medium risk35 | —-0.047 |
| 175 | 20CD0070REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE, COLLAPSE AND LANDSLIDE NCR/BULACAN BDRY. BIGTE-IPO DAM ROAD K0043+795 K0043+845; K0043+950 K0044+000 | Region III | Bulacan 2nd DEO | Completed | ₱14.8M | 100% | Medium risk34 | —-0.106 |