Contractor dossier
231 projects on file, including joint ventures this contractor is part of.
Total projects
231
Total budget
₱8.8B
Average progress
93.1%
Completion rate
79.2%
Average risk score
47.2
Medium risk on average, out of 100
Flagged as unusual
6
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 146 | ₱6.3B | 47.0 | 4 | 92.9% |
| National Capital Region | 78 | ₱2.2B | 47.3 | 2 | 93.1% |
| Region IV-A | 7 | ₱311.5M | 50.6 | 0 | 96.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱3.8B | 45.5 | 3 | 93.1% |
| Flood Control and Drainage | 89 | ₱4.5B | 48.4 | 3 | 92.3% |
| Bridges | 9 | ₱269M | 42.9 | 0 | 100.0% |
| OTHER | 8 | ₱103.5M | 61.0 | 0 | 100.0% |
| Buildings and Facilities | 6 | ₱92.3M | 51.1 | 0 | 83.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24C00491SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT B), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 78% | High risk81 | —-0.014 |
| 25C00370SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 4, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 25C00369SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 3, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 24C00472FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2, PHASE 3, BARANGAY GARLANG, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱95M | 99% | High risk81 | —-0.020 |
| 25CP0046FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD PROTECTION STRUCTURE ALONG BUBULONG-GARLANG RIVERWAY, ZONE A, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 55% | High risk81 | —-0.009 |
| 25CC0098CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE C), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 88% | High risk81 | —-0.022 |
| 24C00490SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT A), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱96.5M | 88% | High risk80 | —-0.018 |
| 24C00471FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2,PHASE 2, BARANGAY GARLANG, SAN ILDEFONSO, BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0423CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CC0099CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE D), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 88% | High risk76 | —-0.029 |
| 24C00487SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT B),BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱90.3M | 87% | High risk76 | —-0.018 |
| 24C00488SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT C), BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱90.3M | 95% | High risk76 | —-0.021 |
| 25CD0080CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (NLEX - LAMBAKIN SECTION), STA. 10+300 - STA. 10+525, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱72.4M | 78% | High risk76 | —-0.025 |
| 25CC0266SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE3341-7330, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱91.1M | 74% | High risk74 | —-0.027 |
| 25CD0184REHABILITATION OF ROAD, BARANGAY PULONG BUHANGIN AND BARANGAY MAG-ASAWANG SAPA, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱77.7M | 8% | High risk74 | —-0.011 |
| 25CD0138REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA NORZAGARAY RD K0041+000 - K0041+1051, K0042+833 - K0042+1004 | Region III | Bulacan 2nd DEO | On-Going | ₱52.1M | 25% | High risk73 | —-0.019 |
| 25CC0275SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE 7330-9530, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱50.6M | 72% | High risk73 | —-0.032 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 25CD0183CONSTRUCTION OF ROADS AND DRAINAGE AT NORTHVILLE 1, BARANGAY LIBTONG, MEYCAUAYAN CITY (PHASE 1) | Region III | Bulacan 2nd DEO | On-Going | ₱48.5M | 22% | High risk72 | —-0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24OF0300PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONGRESSIONAL AVE (S05266LZ) - K0013+(-065) - K0011+1234, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 0% | High risk64 | Flagged0.030 |
| 23C00361ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk70 | Flagged0.029 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 24OF0301PREVENTIVE MAINTENANCE - TERTIARY ROADS - SCT. ALCARAZ (S05342LZ) - K0007+(-860) - K0007+649, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 89% | High risk64 | Flagged0.007 |
| 24CD0313REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIES REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG TUMANA MACAIBAN BRIDGE, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱18.7M | 97% | Medium risk43 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 22CD0151CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER STA. 14+800 STA. 15+100, STA. LUCIA SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49M | 100% | Medium risk34 | —-0.090 |
| 177 | 22CD0152CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER STA. 15+100 STA. 15+400, STA. LUCIA SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49M | 100% | Medium risk34 | —-0.092 |
| 178 | 22CD0008ASSET PRESERVATION - PREVENTIVE MAINTENANCE ASPHALT OVERLAY GEN. ALEJO SANTOS HIGHWAY K0059+572 K0059+819 ; K0068+570.20 K0069+000, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱20M | 100% | Medium risk34 | —-0.104 |
| 179 | 21CC0185ASPHALT OVERLAY ALONG GENERAL AJEJO SANTOS HIGHWAY A. KM44+513 - KM47+259, B. KM48+872 - KM49+100, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱28.9M | 100% | Medium risk33 | —-0.102 |
| 180 | 23C00244FLOOD MANAGEMENT PROG. - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAG-ASAWANG SAPA CREEK, PHASE 4, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱47.5M | 100% | Medium risk33 | —-0.093 |
| 181 | 21CC0187ASPHALT OVERLAY ALONG BALIUAG-BUSTOS ROAD, A. KM51+103 - KM51+002, B. KM51+284 - KM52+126, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱28.9M | 100% | Medium risk33 | —-0.101 |
| 182 | 22CD0067NETWORK DEVELOPMENT PROGRAM ROAD WIDENING STA. RITA-BIAK-NA-BATO VIA PULONG BAYABAS RD - K0074+700 K0075+200 | Region III | Bulacan 2nd DEO | Completed | ₱31.5M | 100% | Medium risk33 | —-0.102 |
| 183 | 20CC0094CONSTRUCTION OF SLOPE PROTECTION ALONG BOACUE RIVER LOLOMBOY SECTION, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱28.2M | 100% | Medium risk33 | —-0.092 |
| 184 | 18CD0039ASSET PRESERVATION REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD K0034+970- K0035+100; K0036+000-K0036+402 | Region III | Bulacan 2nd DEO | Completed | ₱11.5M | 100% | Medium risk33 | —-0.104 |
| 185 | 21CC0186ASPHALT OVERLAY ALONG OLD CAGAYAN VALLEY ROAD KM49+400 - KM52+400, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱28.9M | 100% | Medium risk33 | —-0.102 |
| 186 | 21CD0118ASSET PRESERVATION PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD K0034+000 K0034+302; K0035+000 K0035+165 | Region III | Bulacan 2nd DEO | Completed | ₱9.4M | 100% | Medium risk33 | —-0.102 |
| 187 | 22CC0278REHABILITATION OF BALAGTAS RIVER CONTROL STRUCTURE, STA. 02+272 TO STA. 02+664, BRGY. DALIG, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.090 |
| 188 | 23CD0074ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIARY ROADS GEN. ALEJO SANTOS HIGHWAY K0069 + 710 K0070 + 245 | Region III | Bulacan 2nd DEO | Completed | ₱15.1M | 100% | Medium risk33 | —-0.104 |
| 189 | 20CC0093CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE RIVER BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱28.2M | 100% | Medium risk33 | —-0.092 |
| 190 | 22CC0264REHABILITATION OF BALAGTAS RIVER CONTROL STRUCTURE, STA. 00+000 TO STA. 00+392, BRGY. PULONG GUBAT, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.090 |
| 191 | 19CD0227ASSET PRESERVATION CONSTRUCTION / UPGRADING /REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD K0039+000 K0039+453 | Region III | Bulacan 2nd DEO | Completed | ₱8.1M | 100% | Medium risk32 | —-0.106 |
| 192 | 20CD0046CONSTRUCTION OF FLOOD CONTROL STRUCTURES, POBLACION, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱32.7M | 100% | Medium risk32 | —-0.093 |
| 193 | 24CD0212IMPROVEMENT OF INTERSECTION STA. MARIA BYPASS ROAD (S01372LZ) K0030 + (-221) AND BOCAUE SAN JOSE ROAD (S01377LZ) | Region III | Bulacan 2nd DEO | Completed | ₱9.8M | 100% | Medium risk32 | —-0.104 |
| 194 | 22CD0007PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) GEN. ALEJO SANTOS HIGHWAY K0058+(-153) K0058+850, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱15.7M | 100% | Medium risk32 | —-0.104 |
| 195 | 23CC0160CONSTRUCTION OF FLOOD CONTROL STRUCTURE CAMBAOG-TALAMPAS TRIBUTARIES OF ANGAT RIVER, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.094 |
| 196 | 18CD0118ASSET PRESERVATION REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS GEN. ALEJO SANTOS HIGHWAY K0061+080.60 - K0061+500; K0058+1008 -K0059+067; K0069+1235 - K0069+1546, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱11.5M | 100% | Medium risk32 | —-0.106 |
| 197 | 23CD0053ORGANIZATIONAL OUTCOME 1 ASSET PRESERVATION PREVENTIVE MAINTENANCE TERTIARY ROADS - GEN. ALEJO SANTOS HIGHWAY K0065+354 K0065+570 ; K0066+703 K0067+000 | Region III | Bulacan 2nd DEO | Completed | ₱13.9M | 100% | Medium risk32 | —-0.105 |
| 198 | 18CD0126ROAD CONCRETING OF BRGY. BIGTE, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱4.8M | 100% | Medium risk32 | —-0.102 |
| 199 | 23CD0052GEN. ALEJO SANTOS HIGHWAY K0059+000 K0059+565 ; K0059+835.10 K0060+200 | Region III | Bulacan 2nd DEO | Completed | ₱13.9M | 100% | Medium risk31 | —-0.105 |
| 200 | 21CC0056REHABILITATION OF ROAD, SAN JUAN, SAN PABLO, SAN AGUSTIN, SAN LUCAS & SAN PEDRO STS., TUKTUKAN, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.9M | 100% | Medium risk31 | —-0.104 |