Contractor dossier
231 projects on file, including joint ventures this contractor is part of.
Total projects
231
Total budget
₱8.8B
Average progress
93.1%
Completion rate
79.2%
Average risk score
47.2
Medium risk on average, out of 100
Flagged as unusual
6
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 146 | ₱6.3B | 47.0 | 4 | 92.9% |
| National Capital Region | 78 | ₱2.2B | 47.3 | 2 | 93.1% |
| Region IV-A | 7 | ₱311.5M | 50.6 | 0 | 96.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱3.8B | 45.5 | 3 | 93.1% |
| Flood Control and Drainage | 89 | ₱4.5B | 48.4 | 3 | 92.3% |
| Bridges | 9 | ₱269M | 42.9 | 0 | 100.0% |
| OTHER | 8 | ₱103.5M | 61.0 | 0 | 100.0% |
| Buildings and Facilities | 6 | ₱92.3M | 51.1 | 0 | 83.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24C00491SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT B), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 78% | High risk81 | —-0.014 |
| 25C00370SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 4, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 25C00369SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 3, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 24C00472FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2, PHASE 3, BARANGAY GARLANG, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱95M | 99% | High risk81 | —-0.020 |
| 25CP0046FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD PROTECTION STRUCTURE ALONG BUBULONG-GARLANG RIVERWAY, ZONE A, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 55% | High risk81 | —-0.009 |
| 25CC0098CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE C), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 88% | High risk81 | —-0.022 |
| 24C00490SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT A), DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱96.5M | 88% | High risk80 | —-0.018 |
| 24C00471FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER AT MARUGAY-RUGAY BRIDGE 2,PHASE 2, BARANGAY GARLANG, SAN ILDEFONSO, BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0423CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CC0099CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE D), BARANGAY BAMBANG (SITIO PULO), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 88% | High risk76 | —-0.029 |
| 24C00487SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT B),BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱90.3M | 87% | High risk76 | —-0.018 |
| 24C00488SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYABAS RIVER (SEGMENT C), BARANGAY BAYABAS, DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱90.3M | 95% | High risk76 | —-0.021 |
| 25CD0080CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (NLEX - LAMBAKIN SECTION), STA. 10+300 - STA. 10+525, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱72.4M | 78% | High risk76 | —-0.025 |
| 25CC0266SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE3341-7330, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱91.1M | 74% | High risk74 | —-0.027 |
| 25CD0184REHABILITATION OF ROAD, BARANGAY PULONG BUHANGIN AND BARANGAY MAG-ASAWANG SAPA, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱77.7M | 8% | High risk74 | —-0.011 |
| 25CD0138REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA NORZAGARAY RD K0041+000 - K0041+1051, K0042+833 - K0042+1004 | Region III | Bulacan 2nd DEO | On-Going | ₱52.1M | 25% | High risk73 | —-0.019 |
| 25CC0275SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PULILAN-BALIUAG BYPASS RD - CHAINAGE 7330-9530, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱50.6M | 72% | High risk73 | —-0.032 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 25CD0183CONSTRUCTION OF ROADS AND DRAINAGE AT NORTHVILLE 1, BARANGAY LIBTONG, MEYCAUAYAN CITY (PHASE 1) | Region III | Bulacan 2nd DEO | On-Going | ₱48.5M | 22% | High risk72 | —-0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.2M | 96% | High risk82 | Flagged0.032 |
| 24OF0300PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONGRESSIONAL AVE (S05266LZ) - K0013+(-065) - K0011+1234, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 0% | High risk64 | Flagged0.030 |
| 23C00361ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk70 | Flagged0.029 |
| 24CD0294CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+700 STA 04+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.014 |
| 24OF0301PREVENTIVE MAINTENANCE - TERTIARY ROADS - SCT. ALCARAZ (S05342LZ) - K0007+(-860) - K0007+649, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 89% | High risk64 | Flagged0.007 |
| 24CD0313REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIES REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG TUMANA MACAIBAN BRIDGE, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱18.7M | 97% | Medium risk43 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 22CD0025REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES SIBUL SPRING BR. (B01692LZ) ALONG SAN MIGUEL - SIBUL ROAD | Region III | Bulacan 2nd DEO | Completed | ₱7.7M | 100% | Medium risk31 | —-0.064 |
| 202 | 18CD0041PREVENTIVE MAINTENANCE ASPHALT OVERLAY ALONG SIBUL-BIAK NA BATO ROAD, K0089+742.51- K0090+000; K0092+079 - K0093+000; K0093+627 - K0093+868; K0093+930 - K0094+363, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱10.2M | 100% | Medium risk31 | —-0.103 |
| 203 | 18CD0113PREVENTIVE MAINTENANCE - ASPHALT OVERLAY ALONG STA. RITA - BIAK NA BATO VIA PULONG BAYABAS RD - K0081+655; K083+028 | Region III | Bulacan 2nd DEO | Completed | ₱9.4M | 100% | Medium risk31 | —-0.103 |
| 204 | 21CC0023RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, SAN JOSE BR. 3 (B04302LZ) ALONG PLARIDEL BYPASS RD., PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.4M | 100% | Medium risk31 | —-0.064 |
| 205 | 19CC0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE RIVER AT TAAL-TAMBUBONG SECTION BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.6M | 100% | Medium risk31 | —-0.093 |
| 206 | 19CD0233CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (BUGA SECTION), PHASE VI, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱18.6M | 100% | Medium risk31 | —-0.094 |
| 207 | 22CC0299CONSTRUCTION OF RIVERBANK PROTECTION ALONG BALAGTAS RIVER, BRGY. WAWA, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱29.4M | 100% | Medium risk30 | —-0.093 |
| 208 | 21CD0132CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER (STA. LUCIA SECTION), BARANGAY STA. LUCIA, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱23.5M | 100% | Medium risk30 | —-0.083 |
| 209 | 21CD0031CONCRETING OF ROAD, PULONG BAYABAS, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱4.8M | 100% | Medium risk30 | —-0.105 |
| 210 | 18CC0016CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER AT TIBAGAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.6M | 100% | Medium risk30 | —-0.094 |
| 211 | 19CD0234CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ANYATAM (PHASE I LEFT SIDE), SAN ILDEFONSO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱18.6M | 100% | Medium risk30 | —-0.093 |
| 212 | 19CC0236CONSTRUCTION OF SLOPE PROTECTION ALONG ANGAT RIVER BRGY. BONGA MENOR, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.6M | 100% | Low risk30 | —-0.094 |
| 213 | 18CC0018CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG GUIGUINTO RIVER AT ILANG-ILANG SECTION GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.6M | 100% | Low risk30 | —-0.093 |
| 214 | 18CC0106CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG GUIGUINTO RIVER AT DAUNGAN SECTION GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.6M | 100% | Low risk30 | —-0.093 |
| 215 | 19CC0159CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER CAMBAOG SECTION BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱13.8M | 100% | Low risk30 | —-0.094 |
| 216 | 18CC0175CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER AT SAN JOSE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.6M | 100% | Low risk30 | —-0.094 |
| 217 | 19CC0018CONSTRUCTION OF FLOOD CONTROL ALONG ANGAT RIVER SAN JOSE SECTION PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.6M | 100% | Low risk29 | —-0.094 |
| 218 | 18CC0042CONSTRUCTION.REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER AT TALAMPAS, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.6M | 100% | Low risk29 | —-0.094 |
| 219 | 19CC0076CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER AT TALAMPAS SECTION BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.4M | 100% | Low risk29 | —-0.094 |
| 220 | 18CC0039CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER AT STA. BARBARA, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.6M | 100% | Low risk29 | —-0.094 |
| 221 | 21CC0030REHABILITATION OF ANGAT RIVER, BRGY. CAMBAOG, STA. 01+410 - STA. 01+539, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱17.1M | 100% | Low risk29 | —-0.094 |
| 222 | 19CC0109CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS ALONG ANGAT RIVER BASINS CAMBAOG-TALAMPAS SECTION BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱18.6M | 100% | Low risk29 | —-0.094 |
| 223 | 20CC0077REHABILITATION OF CONCRETE SLOPE PROTECTION ALONG ANGAT RIVER CULIANIN, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱22.2M | 100% | Low risk29 | —-0.094 |
| 224 | 23OB0033RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - NANGKA BR. (B01341LZ) ALONG MARIKINA-SN MATEO RD | National Capital Region | Metro Manila 1st DEO | Completed | ₱4.7M | 100% | Low risk26 | —-0.063 |
| 225 | 18CD0042PREVENTIVE MAINTENANCE ASPHALT OVERLAY ALONG MUZON TUNGKONG MANGGA ROAD K0041+(-779) K0041+(-277) | Region III | Bulacan 2nd DEO | Completed | ₱3M | 100% | Low risk16 | —-0.100 |