Opening the dossier…
Opening the dossier…
Contractor dossier
569 projects on file, including joint ventures this contractor is part of.
Total projects
569
Total budget
₱13.9B
Average progress
91.1%
Completion rate
61.2%
Below 70%
Average risk score
48.0
Medium risk on average, out of 100
Flagged as unusual
36
6.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 397 | ₱10.2B | 50.2 | 27 | 88.3% |
| Region I | 172 | ₱3.6B | 42.9 | 9 | 97.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 251 | ₱3.2B | 47.5 | 13 | 91.2% |
| Roads | 208 | ₱6.4B | 46.3 | 9 | 90.1% |
| Flood Control and Drainage | 78 | ₱3.3B | 48.0 | 3 | 94.5% |
| Bridges | 19 | ₱577.9M | 49.7 | 3 | 87.2% |
| OTHER | 8 | ₱208.1M | 78.3 | 4 | 94.0% |
| GAA 2025 SSP | 3 | ₱57.5M | 87.3 | 2 | 70.0% |
| GAA 2025 OO-1 | 1 | ₱29.4M | 92.2 | 1 | 93.2% |
| GAA 2025 OO-2 | 1 | ₱112.3M | 89.3 | 1 | 95.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AC0044COMPLETION OF MULTI-PURPOSE BUILDING (LEGISLATIVE BUILDING) STO. DOMINGO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱39.4M | 41% | High risk96 | Flagged0.035 |
| 25AC0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, PANTAY INTEGRATED SCHOOL, PANTAY FATIMA, VIGAN CITY | Region I | Ilocos Sur 1st DEO | On-Going | ₱13.4M | 69% | High risk96 | Flagged0.028 |
| 25PA0115ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS, ABRA-ILOCOS NORTE RD-K0442+000-K0443+000 | Cordillera Administrative Region | Abra DEO | On-Going | ₱29.4M | 93% | High risk92 | Flagged0.002 |
| 25AC0008CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY PANTAY AND BARANGAY TAMURONG, CAOAYAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱112.3M | 95% | High risk89 | Flagged0.007 |
| 25PA0150CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, APAO PRIMARY SCHOOL, BRGY. APAO, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱5.7M | 58% | High risk87 | Flagged0.054 |
| 23PA0167CONSTRUCTION OF 1-STOREY, 2-CLASSROOM SCHOOL BUILDING, BENBEN ELEMENTARY SCHOOL, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱7.3M | 99% | High risk86 | Flagged0.058 |
| 22PA0165CONSTRUCTION (COMPLETION) OF CONVENTION CENTER, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | High risk80 | Flagged0.000 |
| 22PA0234REHABILITATION OF UPPER TINEG ROAD, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | High risk78 | —-0.022 |
| 24PA01621. CONSTRUCTION OF ZONE 1 BRIDGE ALONG ABRA-ILOCOS NORTE ROAD; 2. CONSTRUCTION OF ZONE 5 BRIDGE ALONG ABRA-ILOCOS SUR ROAD, A.) ZONE 1, BANGUED ALONG ABRA-ILOCOS NORTE ROAD AND B.) ZONE 5, BANGUED ALONG ABRA-ILOCOS SUR ROAD | Cordillera Administrative Region | Abra DEO | On-Going | ₱28.5M | 95% | High risk77 | Flagged0.007 |
| 24PA0104CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY YUYENG, PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱4.9M | 100% | High risk75 | —-0.023 |
| 24PA0156CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY POBLACION WEST, PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱5M | 100% | High risk74 | —-0.024 |
| 17AC0007CONSTRUCTION OF DRAINAGE CANAL, VIGAN - STA. CATALINA ROAD, K0407+405 - K0408+288 | Region I | Ilocos Sur 1st DEO | Completed | ₱11.2M | 100% | High risk70 | —-0.026 |
| 25PA0017CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY LINGEY, BUCLOC, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱4.7M | 100% | High risk70 | —-0.016 |
| 23PA0109OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY BA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.1M | 95% | High risk69 | Flagged0.005 |
| 24PA0045SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DUGONG BRIDGE, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139.7M | 98% | High risk68 | Flagged0.006 |
| 23PA0047SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF TOON-SAN GREGORIO FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.038 |
| 24AC0104CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BICAL RIVER, SAN JUAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.5M | 98% | High risk67 | Flagged0.029 |
| 25PA0070CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY CALABA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱93.6M | 49% | High risk66 | —-0.009 |
| 22PA0225SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PATAGUI FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱94.3M | 78% | High risk66 | —-0.000 |
| 22PA0229SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF CORIBOT FLOOD CONTROL STRUCTURE, BARANGAY MUDENG, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱94.1M | 100% | High risk65 | —-0.051 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23PA0167CONSTRUCTION OF 1-STOREY, 2-CLASSROOM SCHOOL BUILDING, BENBEN ELEMENTARY SCHOOL, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱7.3M | 99% | High risk86 | Flagged0.058 |
| 25PA0150CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, APAO PRIMARY SCHOOL, BRGY. APAO, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱5.7M | 58% | High risk87 | Flagged0.054 |
| 24AC0086CONSTRUCTION OF CLASSROOMS, FOUR (4) STOREY, SIXTEEN (16) CLASSROOM (MODIFIED STANDARD) SCHOOL BUILDING, ILOCOS SUR NATIONAL HIGH SCHOOL, VIGAN CITY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱48M | 24% | Medium risk51 | Flagged0.036 |
| 24AC0096CONSTRUCTION OF 3-STOREY 14-CLASSROOM SCHOOL BUILDING IN SAN VICENTE INTEGRATED SCHOOL, POBLACION, SAN VICENTE, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱39.6M | 16% | Medium risk47 | Flagged0.036 |
| 25AC0044COMPLETION OF MULTI-PURPOSE BUILDING (LEGISLATIVE BUILDING) STO. DOMINGO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱39.4M | 41% | High risk96 | Flagged0.035 |
| 24AC0104CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BICAL RIVER, SAN JUAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.5M | 98% | High risk67 | Flagged0.029 |
| 25AC0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, PANTAY INTEGRATED SCHOOL, PANTAY FATIMA, VIGAN CITY | Region I | Ilocos Sur 1st DEO | On-Going | ₱13.4M | 69% | High risk96 | Flagged0.028 |
| 25AC0035REPLACEMENT OF BRIDGE, KALIWET, SANTO DOMINGO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱35.1M | 37% | Medium risk60 | Flagged0.020 |
| 23PA0164CONSTRUCTION OF 2 UNITS, 2-STOREY, 4-CLASSROOM SCHOOL BUILDING, PEÑARRUBIA INTEGRATED SCHOOL, PEÑARRUBIA, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱27M | 77% | Medium risk51 | Flagged0.019 |
| 24PA0213CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY SAN JUAN NORTE, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 34% | Medium risk51 | Flagged0.016 |
| 23PA0157CONCRETING OF BARANGAY BACOOC TO BARANGAY PAGANAO FMR, PHASE II, BARANGAY BACOOC AND BARANGAY PAGANAO, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱11.9M | 97% | Medium risk46 | Flagged0.016 |
| 23PA0165CONSTRUCTION OF 2-STOREY, 4-CLASSROOM SCHOOL BUILDING, LANGIDEN NATIONAL HIGH SCHOOL, LANGIDEN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱13.4M | 91% | Medium risk53 | Flagged0.013 |
| 23PA0159CONCRETING OF BRGY. GAPANG TO SITIO BATBATO, BRGY. KINABITI FMR, BRGY. GAPANG AND BRGY. KINABITI, PILAR, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱11.7M | 100% | Medium risk44 | Flagged0.013 |
| 23PA0149CONCRETING OF BARANGAY POBLACION TO SITIO CAGUYEN, BARANGAY CAWAYAN FMR, PHASE II, BARANGAY POBLACION AND BARANGAY CAWAYAN, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱11.6M | 100% | Medium risk47 | Flagged0.012 |
| 24PA0125CONCRETING OF SITIO SINABAAN, BRGY. TAGODTOD TO BRGY. LAGUIBEN FMR, BRGY. TAGODTOD AND BRGY. LAGUIBEN, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱9.5M | 88% | Medium risk46 | Flagged0.010 |
| 24PA0218CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY POBLACION EAST, PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 68% | Medium risk52 | Flagged0.008 |
| 24PA0134CONCRETING OF KILENG-LENNENG FMR, BRGY. LENNENG, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 95% | Medium risk46 | Flagged0.008 |
| 24PA0133CONCRETING OF BRGY. MOGAO TO SUCAO FMR, BRGY. MOGAO AND BRGY. DOMINGLAY, LICUAN - BAAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 98% | Medium risk47 | Flagged0.008 |
| 24AC0081CONCRETING OF BRGY. BALIW-BRGY. BARIKIR-BRGY. CABANGTALAN FMR, BRGY. BALIW, BRGY. BARIKIR AND BRGY. CABANGTALAN, SINAIT, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱14.9M | 100% | Medium risk44 | Flagged0.008 |
| 24PA0124CONCRETING OF SITIO-SAOATAN TO SITIO PUGARO, BRGY. MALITA FMR, BRGY. MALITA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱19.1M | 100% | Medium risk51 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22PA0273CONSTRUCTION OF PAGALA - DARDARAOAS ROAD, BARANGAY PAGALA, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.072 |
| 77 | 23PA0077CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY CALAO, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 100% | Medium risk58 | —-0.033 |
| 78 | 22PA0299CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, ABRA CENTRAL MARKET, BARANGAY MUDENG, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk58 | —-0.069 |
| 79 | 22PA0263CONSTRUCTION OF MULTI-PURPOSE BUILDING, LA PAZ MUNICIPAL HOSPITAL (PHASE 2), LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk58 | —-0.071 |
| 80 | 22PA0166CONSTRUCTION OF UNIVERSITY OF ABRA, SECURITY FACILITIES/ PERIMETER FENCE LAGANGILANG CAMPUS, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk58 | —-0.071 |
| 81 | 23PA0102CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY NALBUAN, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 97% | Medium risk58 | —-0.031 |
| 82 | 25PA0066CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY PALAO, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱91.7M | 86% | Medium risk58 | —-0.018 |
| 83 | 22PA0266CONSTRUCTION OF MULTI-PURPOSE BUILDING, GOVERNMENT CENTER, BARANGAY POBLACION, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱46.6M | 100% | Medium risk58 | —-0.071 |
| 84 | 22PA0220SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF QUIRSODAN-BAQUERO ROAD, BAAY-LICUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 85 | 22PA0269CONSTRUCTION OF ROAD, BUGBOG-STA. ROSA ROAD, BARANGAY BUGBOG AND STA. ROSA, BUCAY AND PEÑARRUBIA, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.072 |
| 86 | 24PA0167CONSTRUCTION OF MULTI-PURPOSE BUILDING, UNIVERSITY OF ABRA PILAR CAMPUS, BARANGAY POBLACION, PILAR, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱47.1M | 70% | Medium risk58 | —-0.027 |
| 87 | 23PA0093CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY SABTAN-OLO, SAN ISIDRO, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 97% | Medium risk58 | —-0.029 |
| 88 | 24PA0150CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, BULBULALA ELEMENTARY SCHOOL, BRGY. BULBULALA, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.8M | 100% | Medium risk58 | —-0.004 |
| 89 | 24PA0085CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY SAPPAAC, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 100% | Medium risk58 | —-0.039 |
| 90 | 23PA0072CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY SALNEC, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 100% | Medium risk58 | —-0.033 |
| 91 | 23PA0091CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY ABANG, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 100% | Medium risk58 | —-0.033 |
| 92 | 24PA0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY MAOAY, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 100% | Medium risk58 | —-0.039 |
| 93 | 24PA0004CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY AGTANGAO, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 100% | Medium risk58 | —-0.039 |
| 94 | 24PA0149CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, CANAN ELEMENTARY SCHOOL, BRGY. CANAN, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 100% | Medium risk58 | —-0.004 |
| 95 | 25PA0018CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY NAMARABAR, PEÑARRUBIA, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 22% | Medium risk58 | —-0.019 |
| 96 | 25PA0014CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), SAN MARCIAL ELEMENTARY SCHOOL, BARANGAY SAN MARCIAL, SAN ISIDRO, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 81% | Medium risk58 | —-0.037 |
| 97 | 22PA0255SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF TARIPAN-BAYABAS ROAD, BRGY. TARIPAN, MALIBCONG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱96.5M | 86% | Medium risk57 | —-0.021 |
| 98 | 24PA0103CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY PAMUTIC, PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.8M | 94% | Medium risk57 | —-0.034 |
| 99 | 23PA0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY ABLEG, DAGUIOMAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 65% | Medium risk57 | —-0.023 |
| 100 | 23PA0185NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, BESAO-TUBO (VIA TAMBOAN) ROAD, PACKAGE A, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱115.8M | 100% | Medium risk57 | —-0.033 |