Contractor dossier
569 projects on file, including joint ventures this contractor is part of.
Total projects
569
Total budget
₱13.9B
Average progress
91.1%
Completion rate
61.2%
Below 70%
Average risk score
48.0
Medium risk on average, out of 100
Flagged as unusual
36
6.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 397 | ₱10.2B | 50.2 | 27 | 88.3% |
| Region I | 172 | ₱3.6B | 42.9 | 9 | 97.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 251 | ₱3.2B | 47.5 | 13 | 91.2% |
| Roads | 208 | ₱6.4B | 46.3 | 9 | 90.1% |
| Flood Control and Drainage | 78 | ₱3.3B | 48.0 | 3 | 94.5% |
| Bridges | 19 | ₱577.9M | 49.7 | 3 | 87.2% |
| OTHER | 8 | ₱208.1M | 78.3 | 4 | 94.0% |
| GAA 2025 SSP | 3 | ₱57.5M | 87.3 | 2 | 70.0% |
| GAA 2025 OO-1 | 1 | ₱29.4M | 92.2 | 1 | 93.2% |
| GAA 2025 OO-2 | 1 | ₱112.3M | 89.3 | 1 | 95.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AC0044COMPLETION OF MULTI-PURPOSE BUILDING (LEGISLATIVE BUILDING) STO. DOMINGO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱39.4M | 41% | High risk96 | Flagged0.035 |
| 25AC0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, PANTAY INTEGRATED SCHOOL, PANTAY FATIMA, VIGAN CITY | Region I | Ilocos Sur 1st DEO | On-Going | ₱13.4M | 69% | High risk96 | Flagged0.028 |
| 25PA0115ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS, ABRA-ILOCOS NORTE RD-K0442+000-K0443+000 | Cordillera Administrative Region | Abra DEO | On-Going | ₱29.4M | 93% | High risk92 | Flagged0.002 |
| 25AC0008CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY PANTAY AND BARANGAY TAMURONG, CAOAYAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱112.3M | 95% | High risk89 | Flagged0.007 |
| 25PA0150CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, APAO PRIMARY SCHOOL, BRGY. APAO, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱5.7M | 58% | High risk87 | Flagged0.054 |
| 23PA0167CONSTRUCTION OF 1-STOREY, 2-CLASSROOM SCHOOL BUILDING, BENBEN ELEMENTARY SCHOOL, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱7.3M | 99% | High risk86 | Flagged0.058 |
| 22PA0165CONSTRUCTION (COMPLETION) OF CONVENTION CENTER, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | High risk80 | Flagged0.000 |
| 22PA0234REHABILITATION OF UPPER TINEG ROAD, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | High risk78 | —-0.022 |
| 24PA01621. CONSTRUCTION OF ZONE 1 BRIDGE ALONG ABRA-ILOCOS NORTE ROAD; 2. CONSTRUCTION OF ZONE 5 BRIDGE ALONG ABRA-ILOCOS SUR ROAD, A.) ZONE 1, BANGUED ALONG ABRA-ILOCOS NORTE ROAD AND B.) ZONE 5, BANGUED ALONG ABRA-ILOCOS SUR ROAD | Cordillera Administrative Region | Abra DEO | On-Going | ₱28.5M | 95% | High risk77 | Flagged0.007 |
| 24PA0104CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY YUYENG, PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱4.9M | 100% | High risk75 | —-0.023 |
| 24PA0156CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY POBLACION WEST, PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱5M | 100% | High risk74 | —-0.024 |
| 17AC0007CONSTRUCTION OF DRAINAGE CANAL, VIGAN - STA. CATALINA ROAD, K0407+405 - K0408+288 | Region I | Ilocos Sur 1st DEO | Completed | ₱11.2M | 100% | High risk70 | —-0.026 |
| 25PA0017CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY LINGEY, BUCLOC, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱4.7M | 100% | High risk70 | —-0.016 |
| 23PA0109OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY BA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.1M | 95% | High risk69 | Flagged0.005 |
| 24PA0045SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DUGONG BRIDGE, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139.7M | 98% | High risk68 | Flagged0.006 |
| 23PA0047SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF TOON-SAN GREGORIO FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.038 |
| 24AC0104CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BICAL RIVER, SAN JUAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.5M | 98% | High risk67 | Flagged0.029 |
| 25PA0070CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY CALABA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱93.6M | 49% | High risk66 | —-0.009 |
| 22PA0225SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PATAGUI FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱94.3M | 78% | High risk66 | —-0.000 |
| 22PA0229SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF CORIBOT FLOOD CONTROL STRUCTURE, BARANGAY MUDENG, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱94.1M | 100% | High risk65 | —-0.051 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23PA0167CONSTRUCTION OF 1-STOREY, 2-CLASSROOM SCHOOL BUILDING, BENBEN ELEMENTARY SCHOOL, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱7.3M | 99% | High risk86 | Flagged0.058 |
| 25PA0150CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, APAO PRIMARY SCHOOL, BRGY. APAO, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱5.7M | 58% | High risk87 | Flagged0.054 |
| 24AC0086CONSTRUCTION OF CLASSROOMS, FOUR (4) STOREY, SIXTEEN (16) CLASSROOM (MODIFIED STANDARD) SCHOOL BUILDING, ILOCOS SUR NATIONAL HIGH SCHOOL, VIGAN CITY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱48M | 24% | Medium risk51 | Flagged0.036 |
| 24AC0096CONSTRUCTION OF 3-STOREY 14-CLASSROOM SCHOOL BUILDING IN SAN VICENTE INTEGRATED SCHOOL, POBLACION, SAN VICENTE, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱39.6M | 16% | Medium risk47 | Flagged0.036 |
| 25AC0044COMPLETION OF MULTI-PURPOSE BUILDING (LEGISLATIVE BUILDING) STO. DOMINGO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱39.4M | 41% | High risk96 | Flagged0.035 |
| 24AC0104CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BICAL RIVER, SAN JUAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.5M | 98% | High risk67 | Flagged0.029 |
| 25AC0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, PANTAY INTEGRATED SCHOOL, PANTAY FATIMA, VIGAN CITY | Region I | Ilocos Sur 1st DEO | On-Going | ₱13.4M | 69% | High risk96 | Flagged0.028 |
| 25AC0035REPLACEMENT OF BRIDGE, KALIWET, SANTO DOMINGO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱35.1M | 37% | Medium risk60 | Flagged0.020 |
| 23PA0164CONSTRUCTION OF 2 UNITS, 2-STOREY, 4-CLASSROOM SCHOOL BUILDING, PEÑARRUBIA INTEGRATED SCHOOL, PEÑARRUBIA, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱27M | 77% | Medium risk51 | Flagged0.019 |
| 24PA0213CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY SAN JUAN NORTE, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 34% | Medium risk51 | Flagged0.016 |
| 23PA0157CONCRETING OF BARANGAY BACOOC TO BARANGAY PAGANAO FMR, PHASE II, BARANGAY BACOOC AND BARANGAY PAGANAO, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱11.9M | 97% | Medium risk46 | Flagged0.016 |
| 23PA0165CONSTRUCTION OF 2-STOREY, 4-CLASSROOM SCHOOL BUILDING, LANGIDEN NATIONAL HIGH SCHOOL, LANGIDEN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱13.4M | 91% | Medium risk53 | Flagged0.013 |
| 23PA0159CONCRETING OF BRGY. GAPANG TO SITIO BATBATO, BRGY. KINABITI FMR, BRGY. GAPANG AND BRGY. KINABITI, PILAR, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱11.7M | 100% | Medium risk44 | Flagged0.013 |
| 23PA0149CONCRETING OF BARANGAY POBLACION TO SITIO CAGUYEN, BARANGAY CAWAYAN FMR, PHASE II, BARANGAY POBLACION AND BARANGAY CAWAYAN, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱11.6M | 100% | Medium risk47 | Flagged0.012 |
| 24PA0125CONCRETING OF SITIO SINABAAN, BRGY. TAGODTOD TO BRGY. LAGUIBEN FMR, BRGY. TAGODTOD AND BRGY. LAGUIBEN, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱9.5M | 88% | Medium risk46 | Flagged0.010 |
| 24PA0218CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY POBLACION EAST, PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 68% | Medium risk52 | Flagged0.008 |
| 24PA0134CONCRETING OF KILENG-LENNENG FMR, BRGY. LENNENG, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 95% | Medium risk46 | Flagged0.008 |
| 24PA0133CONCRETING OF BRGY. MOGAO TO SUCAO FMR, BRGY. MOGAO AND BRGY. DOMINGLAY, LICUAN - BAAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 98% | Medium risk47 | Flagged0.008 |
| 24AC0081CONCRETING OF BRGY. BALIW-BRGY. BARIKIR-BRGY. CABANGTALAN FMR, BRGY. BALIW, BRGY. BARIKIR AND BRGY. CABANGTALAN, SINAIT, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱14.9M | 100% | Medium risk44 | Flagged0.008 |
| 24PA0124CONCRETING OF SITIO-SAOATAN TO SITIO PUGARO, BRGY. MALITA FMR, BRGY. MALITA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱19.1M | 100% | Medium risk51 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 25PA0012CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY LUBONG, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 0% | Medium risk57 | —-0.009 |
| 102 | 25PA0015CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY ARAB, PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.8M | 92% | Medium risk57 | —-0.040 |
| 103 | 24PA0001CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), SAN JOSE SUR, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 94% | Medium risk57 | —-0.033 |
| 104 | 24PA0183CONSTRUCTION OF RURAL HEALTH UNIT BLDG., MUNICIPALITY OF BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱9.4M | 91% | Medium risk57 | —-0.036 |
| 105 | 24PA0182CONSTRUCTION OF MULTI-PURPOSE BUILDING (LIGA NG MG BARANGAY), BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱22.6M | 62% | Medium risk57 | —-0.024 |
| 106 | 23PA0186REHABILITATION OF ROAD, JUNCTION ABRA-CERVANTES ROAD-BESAO ROAD, TUBTUBA, TUBO, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.073 |
| 107 | 24PA0148CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, LIGUIS ELEMENTARY SCHOOL, BRGY. LIGUIS LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 96% | Medium risk57 | Flagged0.001 |
| 108 | 23PA0176CONSTRUCTION OF MULTI-PURPOSE BUILDING (PROVINCIAL INTERNAL AFFAIRS SERVICES BUILDING), CAMP JUAN VILLAMOR, CALABA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱9.4M | 100% | Medium risk56 | —-0.033 |
| 109 | 22PA0203CONSTRUCTION OF UNIVERSITY OF ABRA SCHOOL BUILDING, BARANGAY ZONE 3, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱28M | 22% | Medium risk56 | Flagged0.001 |
| 110 | 23PA0141CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY POBLACION, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱9.5M | 90% | Medium risk56 | —-0.024 |
| 111 | 23PA0080CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BANGBANGAR, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱5M | 100% | Medium risk56 | —-0.077 |
| 112 | 23PA0237CONSTRUCTION OF MULTI-PURPOSE BUILDING (LA PAZ FARMERS TRAINING CENTER), LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱23.7M | 97% | Medium risk56 | —-0.029 |
| 113 | 24PA0028OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SEONDARY ROADS, ABRA-KALINGA ROAD, K0409+(815)-K0415+000 | Cordillera Administrative Region | Abra DEO | On-Going | ₱73.4M | 98% | Medium risk56 | —-0.036 |
| 114 | 23PA0197CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY POBLACION, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱14.2M | 98% | Medium risk56 | —-0.030 |
| 115 | 23PA0084CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY PAWA, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.9M | 100% | Medium risk56 | —-0.034 |
| 116 | 23PA0096CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY SALUCAG, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱4.9M | 100% | Medium risk56 | —-0.076 |
| 117 | 23PA0101CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MACRAY, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱4.9M | 100% | Medium risk56 | —-0.075 |
| 118 | 24PA0006CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY COSILI WEST, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.9M | 95% | Medium risk56 | —-0.032 |
| 119 | 24PA0091CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY KIMMALABA, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.9M | 96% | Medium risk56 | —-0.036 |
| 120 | 23AD0077CONSTRUCTION OF MULTI-PURPOSE BUILDING (TERMINAL BUILDING), CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱69.3M | 90% | Medium risk56 | —-0.025 |
| 121 | 24PA0092CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.9M | 95% | Medium risk56 | —-0.036 |
| 122 | 23PA0082CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY PACAC, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱4.9M | 100% | Medium risk56 | —-0.076 |
| 123 | 24PA0011CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY TAGODTOD, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱4.9M | 100% | Medium risk56 | —-0.078 |
| 124 | 23PA0069CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY PALAO, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.9M | 100% | Medium risk56 | —-0.033 |
| 125 | 21PA0169NETWORK DEVELOPMENT PROGRAM PAVING OF UNPAVED ROADS-SECONDARY ROADS, ABRA-KALINGA ROAD, K0472+101.7-K0472+184.4, K0472+184.4-K0472+237.6 (LS), K0472+237.60-K0472-305.30, K0472+357.30-K0472+792.8, K0472+851-K0472+892, K0472+892-K0472+938.5 (LS), K0473+000- | Cordillera Administrative Region | Abra DEO | Completed | ₱72.4M | 100% | Medium risk56 | —-0.078 |