Contractor dossier
569 projects on file, including joint ventures this contractor is part of.
Total projects
569
Total budget
₱13.9B
Average progress
91.1%
Completion rate
61.2%
Below 70%
Average risk score
48.0
Medium risk on average, out of 100
Flagged as unusual
36
6.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 397 | ₱10.2B | 50.2 | 27 | 88.3% |
| Region I | 172 | ₱3.6B | 42.9 | 9 | 97.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 251 | ₱3.2B | 47.5 | 13 | 91.2% |
| Roads | 208 | ₱6.4B | 46.3 | 9 | 90.1% |
| Flood Control and Drainage | 78 | ₱3.3B | 48.0 | 3 | 94.5% |
| Bridges | 19 | ₱577.9M | 49.7 | 3 | 87.2% |
| OTHER | 8 | ₱208.1M | 78.3 | 4 | 94.0% |
| GAA 2025 SSP | 3 | ₱57.5M | 87.3 | 2 | 70.0% |
| GAA 2025 OO-1 | 1 | ₱29.4M | 92.2 | 1 | 93.2% |
| GAA 2025 OO-2 | 1 | ₱112.3M | 89.3 | 1 | 95.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AC0044COMPLETION OF MULTI-PURPOSE BUILDING (LEGISLATIVE BUILDING) STO. DOMINGO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱39.4M | 41% | High risk96 | Flagged0.035 |
| 25AC0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, PANTAY INTEGRATED SCHOOL, PANTAY FATIMA, VIGAN CITY | Region I | Ilocos Sur 1st DEO | On-Going | ₱13.4M | 69% | High risk96 | Flagged0.028 |
| 25PA0115ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS, ABRA-ILOCOS NORTE RD-K0442+000-K0443+000 | Cordillera Administrative Region | Abra DEO | On-Going | ₱29.4M | 93% | High risk92 | Flagged0.002 |
| 25AC0008CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY PANTAY AND BARANGAY TAMURONG, CAOAYAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱112.3M | 95% | High risk89 | Flagged0.007 |
| 25PA0150CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, APAO PRIMARY SCHOOL, BRGY. APAO, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱5.7M | 58% | High risk87 | Flagged0.054 |
| 23PA0167CONSTRUCTION OF 1-STOREY, 2-CLASSROOM SCHOOL BUILDING, BENBEN ELEMENTARY SCHOOL, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱7.3M | 99% | High risk86 | Flagged0.058 |
| 22PA0165CONSTRUCTION (COMPLETION) OF CONVENTION CENTER, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | High risk80 | Flagged0.000 |
| 22PA0234REHABILITATION OF UPPER TINEG ROAD, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | High risk78 | —-0.022 |
| 24PA01621. CONSTRUCTION OF ZONE 1 BRIDGE ALONG ABRA-ILOCOS NORTE ROAD; 2. CONSTRUCTION OF ZONE 5 BRIDGE ALONG ABRA-ILOCOS SUR ROAD, A.) ZONE 1, BANGUED ALONG ABRA-ILOCOS NORTE ROAD AND B.) ZONE 5, BANGUED ALONG ABRA-ILOCOS SUR ROAD | Cordillera Administrative Region | Abra DEO | On-Going | ₱28.5M | 95% | High risk77 | Flagged0.007 |
| 24PA0104CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY YUYENG, PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱4.9M | 100% | High risk75 | —-0.023 |
| 24PA0156CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY POBLACION WEST, PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱5M | 100% | High risk74 | —-0.024 |
| 17AC0007CONSTRUCTION OF DRAINAGE CANAL, VIGAN - STA. CATALINA ROAD, K0407+405 - K0408+288 | Region I | Ilocos Sur 1st DEO | Completed | ₱11.2M | 100% | High risk70 | —-0.026 |
| 25PA0017CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY LINGEY, BUCLOC, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱4.7M | 100% | High risk70 | —-0.016 |
| 23PA0109OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY BA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.1M | 95% | High risk69 | Flagged0.005 |
| 24PA0045SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DUGONG BRIDGE, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139.7M | 98% | High risk68 | Flagged0.006 |
| 23PA0047SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF TOON-SAN GREGORIO FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.038 |
| 24AC0104CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BICAL RIVER, SAN JUAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.5M | 98% | High risk67 | Flagged0.029 |
| 25PA0070CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY CALABA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱93.6M | 49% | High risk66 | —-0.009 |
| 22PA0225SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PATAGUI FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱94.3M | 78% | High risk66 | —-0.000 |
| 22PA0229SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF CORIBOT FLOOD CONTROL STRUCTURE, BARANGAY MUDENG, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱94.1M | 100% | High risk65 | —-0.051 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23PA0167CONSTRUCTION OF 1-STOREY, 2-CLASSROOM SCHOOL BUILDING, BENBEN ELEMENTARY SCHOOL, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱7.3M | 99% | High risk86 | Flagged0.058 |
| 25PA0150CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, APAO PRIMARY SCHOOL, BRGY. APAO, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱5.7M | 58% | High risk87 | Flagged0.054 |
| 24AC0086CONSTRUCTION OF CLASSROOMS, FOUR (4) STOREY, SIXTEEN (16) CLASSROOM (MODIFIED STANDARD) SCHOOL BUILDING, ILOCOS SUR NATIONAL HIGH SCHOOL, VIGAN CITY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱48M | 24% | Medium risk51 | Flagged0.036 |
| 24AC0096CONSTRUCTION OF 3-STOREY 14-CLASSROOM SCHOOL BUILDING IN SAN VICENTE INTEGRATED SCHOOL, POBLACION, SAN VICENTE, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱39.6M | 16% | Medium risk47 | Flagged0.036 |
| 25AC0044COMPLETION OF MULTI-PURPOSE BUILDING (LEGISLATIVE BUILDING) STO. DOMINGO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱39.4M | 41% | High risk96 | Flagged0.035 |
| 24AC0104CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BICAL RIVER, SAN JUAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.5M | 98% | High risk67 | Flagged0.029 |
| 25AC0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, PANTAY INTEGRATED SCHOOL, PANTAY FATIMA, VIGAN CITY | Region I | Ilocos Sur 1st DEO | On-Going | ₱13.4M | 69% | High risk96 | Flagged0.028 |
| 25AC0035REPLACEMENT OF BRIDGE, KALIWET, SANTO DOMINGO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱35.1M | 37% | Medium risk60 | Flagged0.020 |
| 23PA0164CONSTRUCTION OF 2 UNITS, 2-STOREY, 4-CLASSROOM SCHOOL BUILDING, PEÑARRUBIA INTEGRATED SCHOOL, PEÑARRUBIA, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱27M | 77% | Medium risk51 | Flagged0.019 |
| 24PA0213CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY SAN JUAN NORTE, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 34% | Medium risk51 | Flagged0.016 |
| 23PA0157CONCRETING OF BARANGAY BACOOC TO BARANGAY PAGANAO FMR, PHASE II, BARANGAY BACOOC AND BARANGAY PAGANAO, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱11.9M | 97% | Medium risk46 | Flagged0.016 |
| 23PA0165CONSTRUCTION OF 2-STOREY, 4-CLASSROOM SCHOOL BUILDING, LANGIDEN NATIONAL HIGH SCHOOL, LANGIDEN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱13.4M | 91% | Medium risk53 | Flagged0.013 |
| 23PA0159CONCRETING OF BRGY. GAPANG TO SITIO BATBATO, BRGY. KINABITI FMR, BRGY. GAPANG AND BRGY. KINABITI, PILAR, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱11.7M | 100% | Medium risk44 | Flagged0.013 |
| 23PA0149CONCRETING OF BARANGAY POBLACION TO SITIO CAGUYEN, BARANGAY CAWAYAN FMR, PHASE II, BARANGAY POBLACION AND BARANGAY CAWAYAN, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱11.6M | 100% | Medium risk47 | Flagged0.012 |
| 24PA0125CONCRETING OF SITIO SINABAAN, BRGY. TAGODTOD TO BRGY. LAGUIBEN FMR, BRGY. TAGODTOD AND BRGY. LAGUIBEN, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱9.5M | 88% | Medium risk46 | Flagged0.010 |
| 24PA0218CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY POBLACION EAST, PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 68% | Medium risk52 | Flagged0.008 |
| 24PA0134CONCRETING OF KILENG-LENNENG FMR, BRGY. LENNENG, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 95% | Medium risk46 | Flagged0.008 |
| 24PA0133CONCRETING OF BRGY. MOGAO TO SUCAO FMR, BRGY. MOGAO AND BRGY. DOMINGLAY, LICUAN - BAAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱4.7M | 98% | Medium risk47 | Flagged0.008 |
| 24AC0081CONCRETING OF BRGY. BALIW-BRGY. BARIKIR-BRGY. CABANGTALAN FMR, BRGY. BALIW, BRGY. BARIKIR AND BRGY. CABANGTALAN, SINAIT, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱14.9M | 100% | Medium risk44 | Flagged0.008 |
| 24PA0124CONCRETING OF SITIO-SAOATAN TO SITIO PUGARO, BRGY. MALITA FMR, BRGY. MALITA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱19.1M | 100% | Medium risk51 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 22PA0289REHABILITATION OF DOLORES-SAN JUAN ROAD, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk53 | —-0.078 |
| 202 | 21AC0118CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING CENTER), BRGY. GUIMOD, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱29.7M | 100% | Medium risk52 | —-0.078 |
| 203 | 22PA0233SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTION, CONSTRUCTION OF SAN GREGORIO-TOON-PANGAL ROAD, BARANGAYS SAN GREGORIO, TOON AND PANGAL, MUNICIPALITIE | Cordillera Administrative Region | Abra DEO | On-Going | ₱49M | 94% | Medium risk52 | —-0.020 |
| 204 | 23PA0242CONSTRUCTION OF 2 UNITS 1-STOREY, 2-CLASSROOM SCHOOL BUILDING, DUGONG ELEMENTARY SCHOOL, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱17.1M | 100% | Medium risk52 | Flagged0.004 |
| 205 | 22PA0286REHABILITATION OF MALIBCONG ROAD, MALIBCONG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.080 |
| 206 | 22PA0199SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, DOMENGLAY-BINASARAN ROAD, LICUAN-BAAY AND MALIBCONG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.080 |
| 207 | 23PA0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) SPECIAL ROAD FUND-MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 INSTALLATION OF STREET LIGHTS, MUNICIPALITY OF BANGUED, LA PAZ, DANGLAS AND LAGAYAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱48.9M | 100% | Medium risk52 | —-0.077 |
| 208 | 22PA0221SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANABO ROAD, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.079 |
| 209 | 17AC0040WIDENING OF GONGOGONG BRIDGE ALONG MANILA NORTH ROAD | Region I | Ilocos Sur 1st DEO | Completed | ₱11.3M | 100% | Medium risk52 | —-0.022 |
| 210 | 22AD0035CONSTRUCTION OF MULTI-PURPOSE BUILDING (CANDON SPORTS COMPLEX), BAGANI CAMPO, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱43.2M | 100% | Medium risk52 | —-0.074 |
| 211 | 22PA0256SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, KIRSODAN-BAAY ROAD, BAAY-LICUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.081 |
| 212 | 22PA0293CONSTRUCTION OF ANINIPIL-TABIOG-LUBLUBNAK-ABANG ROAD (PHASE III), STA.0+000-STA.3+000, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.080 |
| 213 | 22PA0274CONSTRUCTION OF NORTH AND SOUTH POBLACION ROAD (PHASE II), STA.0+000-STA.3+000, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.079 |
| 214 | 22PA0271REHABILITATION OF PEÑARRUBIA-BUCAY ROAD, BUCAY SECTION, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.080 |
| 215 | 22PA0275CONSTRUCTION OF ABAQUID-DANGLAS-NAGAPARAN ROAD, MUNICIPALITY OF DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.076 |
| 216 | 22PA0290CONSTRUCTION OF DANGLAS ROAD, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.076 |
| 217 | 23PA0064CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY NANANGDUAN, PILAR, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱5M | 100% | Medium risk52 | —-0.078 |
| 218 | 22PA0196CONSTRUCTION OF CONCRETE ROAD APAO-LAN AG ROAD, TINEG/LACUB, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.079 |
| 219 | 24AC0026CONSTRUCTION OF MULTI-PURPOSE BUILDING, NAGSUPOTAN, SAN JUAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱5.9M | 100% | Medium risk52 | —-0.083 |
| 220 | 25PA0001SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRIDGE, SINALANG-PALAO, BANGUED, ABRA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱18.7M | 64% | Medium risk52 | —-0.010 |
| 221 | 22PA0270CONSTRUCTION OF ROAD, POBLACION-MALAPAAO (PHASE II), STA.0+000-STA.3+000, LANGIDEN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱46.5M | 84% | Medium risk52 | —-0.020 |
| 222 | 22PA0277REHABILITATION OF MALAMSIT-STA.ROSA ROAD, PEÑARRUBIA, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.077 |
| 223 | 22PA0219REHABILITATION OF STA. ROSA-BUGBOG ROAD (PHASE II), STA.0+000-STA.3+500, PEÑARRUBIA AND BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.078 |
| 224 | 22PA0287REHABILITATION OF STA. ROSA-LAYUGAN ROAD, STA. ROSA & LAYUGAN, PEÑARRUBIA & BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.078 |
| 225 | 25PA0011ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES, BALINGASA BRIDGE (B02228LZ) ALONG ABRA-KALINGA RD (PHASE II) | Cordillera Administrative Region | Abra DEO | On-Going | ₱27.7M | 18% | Medium risk52 | Flagged0.003 |