Opening the dossier…
Opening the dossier…
Contractor dossier
116 projects on file, including joint ventures this contractor is part of.
Total projects
116
Total budget
₱1.1B
Average progress
93.7%
Completion rate
87.1%
Average risk score
44.5
Medium risk on average, out of 100
Flagged as unusual
4
3.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 49 | ₱519.6M | 50.1 | 4 | 87.8% |
| Region III | 49 | ₱489.3M | 45.2 | 0 | 97.4% |
| National Capital Region | 18 | ₱100.9M | 27.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 45 | ₱494.3M | 44.8 | 0 | 95.0% |
| Buildings and Facilities | 41 | ₱282.6M | 39.2 | 2 | 90.2% |
| Flood Control and Drainage | 14 | ₱188.8M | 52.9 | 0 | 100.0% |
| OTHER | 7 | ₱85.6M | 59.7 | 1 | 100.0% |
| Bridges | 6 | ₱42.6M | 46.0 | 1 | 83.3% |
| Water Provision and Storage | 3 | ₱15.8M | 32.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20DF0227ROAD CONCRETING IN BRGY. PASONG KAWAYAN II TO PASONG KAWAYAN I, GENERAL TRIAS CITY; ROAD CONCRETING IN BRGY. BACAO II, GENERAL TRIAS CITY AND CONSTRUCTION/IMPROVEMENT/REHABILITATION OF DRAINAGE SYSTEM, PASONG KAWAYAN II, GENERAL TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱14.5M | 100% | High risk80 | Flagged0.005 |
| 24DF0112CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE II, BARANGAY TANZANG LUMA III, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱4.9M | 100% | High risk75 | —-0.072 |
| 25CD0104REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY PANGHULO, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱4.8M | 0% | High risk73 | —-0.011 |
| 24DF0172CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BLDGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG, GOVERNOR'S HILLS, BRGY BICLATAN, GEN TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.9M | 0% | High risk72 | Flagged0.002 |
| 24DF0165CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BLDGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG (PHASE 2) AT BARANGAY CAPIPISA, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱5M | 100% | High risk72 | —-0.073 |
| 24CD0243ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS NCR/ BULACAN BDRY. BIGTE IPO DAM RD K0036+239 K0036+600 | Region III | Bulacan 2nd DEO | On-Going | ₱19.3M | 100% | High risk70 | —-0.041 |
| 24CD0234ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS NCR/ BULACAN BDRY BIGTE IPO DAM RD, K0036+890 K0037+100, K0037+440 K0037+670 | Region III | Bulacan 2nd DEO | On-Going | ₱19.3M | 100% | High risk70 | —-0.041 |
| 24CD0241ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS BOCAUE SAN JOSE RD K0037+825 K0038+173 | Region III | Bulacan 2nd DEO | Completed | ₱19.3M | 100% | High risk70 | —-0.069 |
| 24CD0242ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS NCR/ BULACAN BDRY. BIGTE IPO DAM RD K0034+313 K0034+536 | Region III | Bulacan 2nd DEO | On-Going | ₱19.3M | 100% | High risk70 | —-0.041 |
| 24CD0240ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS BOCAUE SAN JOSE RD, K0040+186 K0040+430 | Region III | Bulacan 2nd DEO | On-Going | ₱19.3M | 100% | High risk70 | —-0.041 |
| 25CD0007IMPROVEMENT OF ROAD INCLUDING DRAINAGE CANAL, COL. S. CASTRO STREET, BARANGAY LONGOS, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱9.5M | 97% | High risk70 | —-0.043 |
| 24CD0141ASSET PRESERVATION : PREVENTIVE MAINTENANCE TERTIARY ROAD MEYCAUAYAN-CAMALIG-BAHAY PARI RD- K0021+330 K0021+500 | Region III | Bulacan 2nd DEO | Completed | ₱12.1M | 100% | High risk69 | —-0.069 |
| 25CD0008IMPROVEMENT OF ROAD INCLUDING DRAINAGE CANAL, MAIN ROAD, BARANGAY BAGBAGUIN, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱14.2M | 78% | High risk69 | —-0.037 |
| 25CD0070CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PANDAYAN - SALUYSOY CREEK, BARANGAY SALUYSOY, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱19.2M | 100% | High risk69 | —-0.036 |
| 17CD0132CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (IBAYO SIDE) MARILAO, BULACAN PHASE 2 | Region III | Bulacan 2nd DEO | Completed | ₱11.7M | 100% | High risk69 | —-0.064 |
| 20DF0145ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, KAWIT-NOVELETA DIVERSION RD. - K0022+(-364) - K0022+(-299), K0022+(-224) - K0022+(-167), K0022+(-167) - K0022+(-106), K0022 | Region IV-A | Cavite 1st DEO | Completed | ₱23M | 100% | High risk69 | —-0.040 |
| 19DF0121LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL BRIDGES - CONSTRUCTION OF GREGORIO LUNA BRIDGE AT LIGTONG 4, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱22.8M | 100% | High risk68 | —-0.042 |
| 19DF0096LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, MULTIPURPOSE/FACILITIES -REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. SAPA IV, ROSARIO; CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY S | Region IV-A | Cavite 1st DEO | Completed | ₱7.4M | 100% | High risk67 | —-0.042 |
| 17DQ0056LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM (LIP) - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES, CONSTRUCTION/REHABILITATION OF DRAINAGE SYSTEM, BRGY. 8, CARMONA, CAVITE, REHABILITATION OF DRAINAGE SYSTEM (ZONE 3 & ZONE 10) | Region IV-A | Cavite 3rd DEO | Completed | ₱10.3M | 100% | High risk67 | —-0.060 |
| 20DF0219CONSTRUCTION /IMPROVEMENT/REHABILITATION OF DRAINAGE SYSTEM, EPZA-BACAO ROAD, BACAO, GENERAL TRIAS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱9.7M | 100% | High risk63 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17DF0070LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, IMPROVEMENT OF PUBLIC HOSPITALS AT KAWIT KALAYAAN HOSPITAL, BARANGAY SAN SEBASTIAN, KAWIT, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱2M | 0% | Medium risk51 | Flagged0.028 |
| 24DF0146ORGANIZATIONAL OUTCOME 1 :ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMBRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGESKANLURAN BR. (B03406LZ) ALONG KAWIT-NOVELETA DIVERSION RD. | Region IV-A | Cavite 1st DEO | On-Going | ₱12.4M | 0% | Medium risk55 | Flagged0.020 |
| 20DF0227ROAD CONCRETING IN BRGY. PASONG KAWAYAN II TO PASONG KAWAYAN I, GENERAL TRIAS CITY; ROAD CONCRETING IN BRGY. BACAO II, GENERAL TRIAS CITY AND CONSTRUCTION/IMPROVEMENT/REHABILITATION OF DRAINAGE SYSTEM, PASONG KAWAYAN II, GENERAL TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱14.5M | 100% | High risk80 | Flagged0.005 |
| 24DF0172CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BLDGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG, GOVERNOR'S HILLS, BRGY BICLATAN, GEN TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.9M | 0% | High risk72 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 20DF0227ROAD CONCRETING IN BRGY. PASONG KAWAYAN II TO PASONG KAWAYAN I, GENERAL TRIAS CITY; ROAD CONCRETING IN BRGY. BACAO II, GENERAL TRIAS CITY AND CONSTRUCTION/IMPROVEMENT/REHABILITATION OF DRAINAGE SYSTEM, PASONG KAWAYAN II, GENERAL TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱14.5M | 100% | High risk80 | Flagged0.005 |
| 2 | 24DF0112CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE II, BARANGAY TANZANG LUMA III, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱4.9M | 100% | High risk75 | —-0.072 |
| 3 | 25CD0104REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY PANGHULO, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱4.8M | 0% | High risk73 | —-0.011 |
| 4 | 24DF0172CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BLDGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG, GOVERNOR'S HILLS, BRGY BICLATAN, GEN TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱6.9M | 0% | High risk72 | Flagged0.002 |
| 5 | 24DF0165CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BLDGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONST OF MULTI-PURPOSE BLDG (PHASE 2) AT BARANGAY CAPIPISA, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱5M | 100% | High risk72 | —-0.073 |
| 6 | 24CD0243ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS NCR/ BULACAN BDRY. BIGTE IPO DAM RD K0036+239 K0036+600 | Region III | Bulacan 2nd DEO | On-Going | ₱19.3M | 100% | High risk70 | —-0.041 |
| 7 | 24CD0234ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS NCR/ BULACAN BDRY BIGTE IPO DAM RD, K0036+890 K0037+100, K0037+440 K0037+670 | Region III | Bulacan 2nd DEO | On-Going | ₱19.3M | 100% | High risk70 | —-0.041 |
| 8 | 24CD0241ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS BOCAUE SAN JOSE RD K0037+825 K0038+173 | Region III | Bulacan 2nd DEO | Completed | ₱19.3M | 100% | High risk70 | —-0.069 |
| 9 | 24CD0242ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS NCR/ BULACAN BDRY. BIGTE IPO DAM RD K0034+313 K0034+536 | Region III | Bulacan 2nd DEO | On-Going | ₱19.3M | 100% | High risk70 | —-0.041 |
| 10 | 24CD0240ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS BOCAUE SAN JOSE RD, K0040+186 K0040+430 | Region III | Bulacan 2nd DEO | On-Going | ₱19.3M | 100% | High risk70 | —-0.041 |
| 11 | 25CD0007IMPROVEMENT OF ROAD INCLUDING DRAINAGE CANAL, COL. S. CASTRO STREET, BARANGAY LONGOS, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱9.5M | 97% | High risk70 | —-0.043 |
| 12 | 24CD0141ASSET PRESERVATION : PREVENTIVE MAINTENANCE TERTIARY ROAD MEYCAUAYAN-CAMALIG-BAHAY PARI RD- K0021+330 K0021+500 | Region III | Bulacan 2nd DEO | Completed | ₱12.1M | 100% | High risk69 | —-0.069 |
| 13 | 25CD0008IMPROVEMENT OF ROAD INCLUDING DRAINAGE CANAL, MAIN ROAD, BARANGAY BAGBAGUIN, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱14.2M | 78% | High risk69 | —-0.037 |
| 14 | 25CD0070CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PANDAYAN - SALUYSOY CREEK, BARANGAY SALUYSOY, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱19.2M | 100% | High risk69 | —-0.036 |
| 15 | 17CD0132CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (IBAYO SIDE) MARILAO, BULACAN PHASE 2 | Region III | Bulacan 2nd DEO | Completed | ₱11.7M | 100% | High risk69 | —-0.064 |
| 16 | 20DF0145ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, KAWIT-NOVELETA DIVERSION RD. - K0022+(-364) - K0022+(-299), K0022+(-224) - K0022+(-167), K0022+(-167) - K0022+(-106), K0022 | Region IV-A | Cavite 1st DEO | Completed | ₱23M | 100% | High risk69 | —-0.040 |
| 17 | 19DF0121LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL BRIDGES - CONSTRUCTION OF GREGORIO LUNA BRIDGE AT LIGTONG 4, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱22.8M | 100% | High risk68 | —-0.042 |
| 18 | 19DF0096LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, MULTIPURPOSE/FACILITIES -REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. SAPA IV, ROSARIO; CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY S | Region IV-A | Cavite 1st DEO | Completed | ₱7.4M | 100% | High risk67 | —-0.042 |
| 19 | 17DQ0056LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM (LIP) - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES, CONSTRUCTION/REHABILITATION OF DRAINAGE SYSTEM, BRGY. 8, CARMONA, CAVITE, REHABILITATION OF DRAINAGE SYSTEM (ZONE 3 & ZONE 10) | Region IV-A | Cavite 3rd DEO | Completed | ₱10.3M | 100% | High risk67 | —-0.060 |
| 20 | 20DF0219CONSTRUCTION /IMPROVEMENT/REHABILITATION OF DRAINAGE SYSTEM, EPZA-BACAO ROAD, BACAO, GENERAL TRIAS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱9.7M | 100% | High risk63 | —-0.014 |
| 21 | 19CD0090CONSTRUCTION/UPGRADING OF ROAD INCLUDING DRAINAGE, MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱14.1M | 100% | High risk62 | —-0.042 |
| 22 | 21DF0200OPENING AND CONCRETING OF BRGY. SAN FRANCISCO FMR, BRGY. SAN FRANCISCO, GENERAL TRIAS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱9.6M | 100% | High risk60 | —-0.019 |
| 23 | 17CD0040REPAIR/REHABILITATION OF SLOPE PROTECTION ALONG BULO RIVER (BUGA SECTION), SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱8.5M | 100% | High risk60 | —-0.012 |
| 24 | 17CD0042REPAIR/REHABILITATION OF SLOPE PROTECTION ALONG TARTARO CREEK, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱5M | 100% | Medium risk59 | —-0.011 |
| 25 | 17CD0039REPAIR/REHABILITATION OF SLOPE PROTECTION ALONG BULO RIVER (BARDIAS SECTION), SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱5.3M | 100% | Medium risk58 | —-0.010 |