Contractor dossier
53 projects on file, including joint ventures this contractor is part of.
Total projects
53
Total budget
₱680M
Average progress
97.8%
Completion rate
88.7%
Average risk score
29.2
Low risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 50 | ₱654.8M | 29.0 | 0 | 97.8% |
| Cordillera Administrative Region | 3 | ₱25.3M | 33.1 | 0 | 98.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 27 | ₱398.1M | 26.3 | 0 | 97.2% |
| Buildings and Facilities | 18 | ₱132.1M | 24.7 | 0 | 100.0% |
| Flood Control and Drainage | 6 | ₱138.3M | 50.3 | 0 | 93.5% |
| GAA 2025 OO-2 | 1 | ₱9.7M | 69.4 | 0 | 100.0% |
| Bridges | 1 | ₱1.9M | 22.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CL0125CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANCAL-SAN ISIDRO-MAMBOG RIVER (TOTUN LANUM) PHASE 1, SITIO TAMBAK, (NORTH SIDE), BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱47.6M | 100% | High risk73 | —-0.057 |
| 25CE0078CONSTRUCTION OF DRAINAGE STRUCTURE AT PRIS SDC (PH2), TALUGTUG, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱9.7M | 100% | High risk69 | —-0.051 |
| 25CN0035REHABILITATION OF SLOPE PROTECTION STRUCTURE ALONG PACUGAO RIVER AT KABITUKULAN CIS, MARIA AURORA, AURORA | Region III | Aurora DEO | On-Going | ₱14.4M | 83% | High risk66 | —-0.029 |
| 25CN0082CONSTRUCTION OF ROAD, BARANGAY FLORIDA, MARIA AURORA, AURORA | Region III | Aurora DEO | On-Going | ₱19.2M | 96% | High risk66 | —-0.043 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24CL0125CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANCAL-SAN ISIDRO-MAMBOG RIVER (TOTUN LANUM) PHASE 1, SITIO TAMBAK, (NORTH SIDE), BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱47.6M | 100% | High risk73 | —-0.057 |
| 2 | 25CE0078CONSTRUCTION OF DRAINAGE STRUCTURE AT PRIS SDC (PH2), TALUGTUG, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱9.7M | 100% | High risk69 | —-0.051 |
| 3 | 25CN0035REHABILITATION OF SLOPE PROTECTION STRUCTURE ALONG PACUGAO RIVER AT KABITUKULAN CIS, MARIA AURORA, AURORA | Region III | Aurora DEO | On-Going | ₱14.4M | 83% | High risk66 | —-0.029 |
| 4 | 25CN0082CONSTRUCTION OF ROAD, BARANGAY FLORIDA, MARIA AURORA, AURORA | Region III | Aurora DEO | On-Going | ₱19.2M | 96% | High risk66 | —-0.043 |
| 5 | 16CF0229RESTORATION OF DIGMALA RIVER CONTROL ARIENDO, BONGABON, NUEVA ECIJA STA. 2+174.72 TO STA. 2+524.72, STA. 4+074.90 TO STA. 4+127.90 | Region III | Nueva Ecija 2nd DEO | Completed | ₱12.9M | 100% | Medium risk57 | —-0.008 |
| 6 | 24PC0066ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS- ASPHALT OVERLAY ALONG KABUGAO-PUDTOL-LUNA-CAGAYAN BOUNDARY ROAD, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱19.3M | 95% | Medium risk53 | —-0.042 |
| 7 | 21CE0079ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0167+200 - K0167+240 | Region III | Nueva Ecija 1st DEO | Completed | ₱67.5M | 100% | Medium risk40 | —-0.097 |
| 8 | 25CN0072CONSTRUCTION OF ROAD, BARANGAY BUHANGIN, BALER, AURORA | Region III | Aurora DEO | On-Going | ₱47.3M | 35% | Medium risk39 | —-0.056 |
| 9 | 20CN0091CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DIARABASIN, DIPACULAO, AURORA | Region III | Aurora DEO | Completed | ₱5.4M | 100% | Medium risk39 | —-0.102 |
| 10 | 23CN0141CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. CABITUCULAN WEST, MARIA AURORA, AURORA | Region III | Aurora DEO | Completed | ₱4.9M | 100% | Medium risk37 | —-0.102 |
| 11 | 19CN0057CONSTRUCTION OF ZABALI FLOOD CONTROL, SO. CONTROL, BRGY. ZABALI, BALER, AURORA | Region III | Aurora DEO | Completed | ₱19.6M | 100% | Medium risk37 | —-0.089 |
| 12 | 25CN0034REHABILITATION OF SLOPE PROTECTION STRUCTURE ALONG DIAMANEN RIVER AT DIAMANEN CIS, DIPACULAO, AURORA | Region III | Aurora DEO | On-Going | ₱14.4M | 78% | Medium risk36 | —-0.051 |
| 13 | 24CN0225CONCRETING OF BRGY. WENCESLAO TO BRGY. STO. TOMAS FMR, BRGY. WENCESLAO, AND BRGY. STO. TOMAS, MARIA AURORA, AURORA | Region III | Aurora DEO | On-Going | ₱18.9M | 97% | Medium risk35 | —-0.007 |
| 14 | 22CE0041ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0190+150 - K0190+230 | Region III | Nueva Ecija 1st DEO | Completed | ₱40.2M | 100% | Medium risk35 | —-0.097 |
| 15 | 23CE0146CONSTRUCTION OF EVACUATION CENTER, BRGY. BERTESE, QUEZON, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱44.5M | 100% | Medium risk35 | —-0.097 |
| 16 | 23CN0014ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, A. CASTAÑEDA - MA AURORA - SN LUIS RD - K0198+623 - K0198+660, K0202+376 - K0202+481, K0204+275 - K0204+358, K0204+533 - K0204+600,... | Region III | Aurora DEO | Completed | ₱24.1M | 100% | Medium risk34 | —-0.102 |
| 17 | 18CE0133ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROAD, DAANG MAHARLIKA (LZ), NUEVA ECIJA K0169+1216 - K0170+000; K0170+044 - K0170+070; K0170+231 - K170+252; K0170+290 - K0170+415; K0171+150 - K01 | Region III | Nueva Ecija 1st DEO | Completed | ₱27.9M | 100% | Medium risk34 | —-0.098 |
| 18 | 23CN0168CONCRETING OF SITIO DIMANAGSAG BRGY. CALABUANAN FMR, BRGY. CALABUANAN, BALER, AURORA | Region III | Aurora DEO | Completed | ₱19.9M | 100% | Medium risk34 | —-0.039 |
| 19 | 23CE0129CONCRETING OF SAN JOSE - MUNOZ ROAD VIA SAN FELIPE, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱28.8M | 100% | Medium risk33 | —-0.102 |
| 20 | 20CN0021CONSTRUCTION OF MARIA AURORA RIVER CONTROL MARIA AURORA, AURORA | Region III | Aurora DEO | Completed | ₱29.4M | 100% | Medium risk33 | —-0.089 |
| 21 | 18CF0040ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS- TERTIARY ROADS - CABANATUAN - CARMEN RD. | Region III | Nueva Ecija 2nd DEO | Completed | ₱22.9M | 100% | Medium risk32 | —-0.105 |
| 22 | 21CE0066CONSTRUCTION OF SCHOOL BUILDING, VILLA NATI ELEMENTARY SCHOOL, BARANGAY VILLA NATI, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱4.9M | 100% | Medium risk32 | —-0.104 |
| 23 | 23CE0105CONSTRUCTION OF SENIOR CITIZENS MULTI-PURPOSE BUILDING, MUNICIPALITY OF TALAVERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱4.9M | 100% | Medium risk32 | —-0.105 |
| 24 | 23CE0104CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZENS CENTER), MUNICIPALITY OF TALAVERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱4.9M | 100% | Medium risk31 | —-0.105 |
| 25 | 25CE0225ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS, SN JOSE-LUPAO RD - K0171 + 463 - K0172 + 259 | Region III | Nueva Ecija 1st DEO | Completed | ₱11.3M | 100% | Medium risk31 | —-0.103 |