Contractor dossier
233 projects on file, including joint ventures this contractor is part of.
Total projects
233
Total budget
₱8.3B
Average progress
98.9%
Completion rate
93.1%
Average risk score
43.9
Medium risk on average, out of 100
Flagged as unusual
10
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 233 | ₱8.3B | 43.9 | 10 | 98.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 82 | ₱4.6B | 52.0 | 4 | 98.1% |
| Buildings and Facilities | 66 | ₱342.4M | 27.5 | 0 | 99.9% |
| Bridges | 41 | ₱1.3B | 46.2 | 5 | 97.9% |
| Flood Control and Drainage | 39 | ₱1.6B | 49.7 | 1 | 99.8% |
| Bridges, Roads | 4 | ₱388.5M | 59.8 | 0 | 100.0% |
| OTHER | 1 | ₱44.1M | 78.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19IB0071CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO PANINIHI-AN ISLAND AND BARANGITAW BEACH, SULAT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱44.1M | 100% | High risk78 | —-0.030 |
| 17IL0040LILO-AN-SAN RICARDO CIRCUMFERENTIAL ROAD (SAN RAMON SECTION), INCLUDING BRIDGES, SAN RICARDO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.049 |
| 18IB0084CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURIST DESTINATIONS BORONGAN - LLORENTE CLOSED CANOPY AREA, BRGY. SAN GABRIEL - BRGY. TAGASLIAN - BRGY. DEL PILAR INCLUDING BRIDGE, MAYDOLONG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱194M | 100% | High risk66 | —-0.035 |
| 18I00015ROAD WIDENING - PRIMARY ROADS: PALO - CARIGARA - ORMOC ROAD, KO919+247.92 - KO921+514; KO921+538 - KO926+407, LEYTE 1ST LD | Region VIII | Region VIII | Completed | ₱192.2M | 100% | High risk65 | —-0.059 |
| 18IL0010CONSTRUCTION OF CONCRETE BRIDGE, LILOAN-SAN RICARDO CIRCUMFERENTIAL ROAD, VIADUCT, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱168.9M | 100% | High risk65 | —-0.014 |
| 21IL0042NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS LILOAN - SAN RICARDO CIRCUMFERENTIAL ROAD (CONSTRUCTION OF VIADUCT), SOUTHERN LEYTE, SAN RICARDO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱144.8M | 100% | High risk65 | —-0.030 |
| 22IB0088CONSTRUCTION OF NEW BRIDGES, BIGO BR., ALONG ARTECHE - JIPAPAD - LAS NAVAS - RAWIS RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 100% | High risk63 | Flagged0.003 |
| 19I00151REHABILITATION/RECONSTRUCTION OF CIRCUMFERENTIAL ROADS WITH SLIPS, SLOPES COLLAPSED AND LANDSLIDE ALONG BRGY. PINGAN, GEN. MAC ACTHUR, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱99.1M | 100% | High risk63 | —-0.021 |
| 18I00036CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 0+720 - STATION 0+982, SECTION 5 PHASE 8, BRGY. COGON, PALO, LEYTE | Region VIII | Region VIII | Completed | ₱101.1M | 100% | High risk63 | —-0.053 |
| 20I00073CONSTRUCTION OF FLOOD CONTROL WALL ALONG MAINIT RIVER, PHASE 2, BRGY. CAVITE, ALANGALANG, LEYTE | Region VIII | Region VIII | Completed | ₱95.1M | 100% | High risk63 | —-0.071 |
| 17IL0005CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, SUBA SECTION,STA. 4+640-STA. 5+600, SUBA, SOGOD, SOUTHERN LEYTE, LONE DISTRICT, BRGY. SUBA, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱47M | 100% | High risk63 | —-0.051 |
| 19I00146REHABILITATION/RECONSTRUCTION OF CIRCUMFERENTIAL ROADS WITH SLIPS, SLOPES COLLAPSED AND LANDSLIDE ALONG BRGY. STA. FE, GEN. MAC ARTHUR, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱95.8M | 100% | High risk62 | —-0.025 |
| 20I00015NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - STA. FE - SAN MIGUEL ROAD, LEYTE | Region VIII | Region VIII | Completed | ₱135.1M | 100% | High risk62 | —-0.067 |
| 17IL0001CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, HIBOD-HIBOD SECTION, STA. 3+720 - STA 4+600, HIBOD-HIBOD, SOGOD, SOUTHERN LEYTE LONE DISTRICT, BRGY. HIBOD-HIBOD, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱46.7M | 100% | High risk62 | —-0.051 |
| 18IB0054OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD (S00167SM), K0898+100 - K0898+480; K0909+000 - K0910+710; K0910+1058 - K0911+010; K0911+174 - K0911+330; K0911+351 - K0912+274; K0912+288 - K0912+732; K0912+844 - K0913+344 | Region VIII | Eastern Samar DEO | Completed | ₱94.7M | 100% | High risk61 | —-0.084 |
| 22IB0117CONSTRUCTION OF ROAD, CANYUPAY - BAGONG BARRIO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.081 |
| 17IL0002CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, KANANGKAAN SECTION, STA. 7+920-STA. 8+760, KANANGKAAN, SOGOD, SOUTHERN LEYTE, LONE DISTRICT, BRGY. KANANGKAAN, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱43.9M | 100% | High risk61 | —-0.050 |
| 21I00055CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION/IMPROVEMENT OF JUNCTION NATIONAL ROAD, CAROLINA-CAN-AVID-DOLORES-MASLOG ROAD (BARANGAY AROGANGA - BARANGAY MAGSA.......DOLORES, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱125.9M | 100% | High risk61 | —-0.076 |
| 20IB0003REHABILITATION/RECONSTRUCTIONO F ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROAD BORONGAN - GUIUAN ROAD, K0980+450 - K0980+665 | Region VIII | Eastern Samar DEO | Completed | ₱92.9M | 100% | High risk61 | —-0.084 |
| 22IB0089CONSTRUCTION OF NEW BRIDGES, PAGNAMITAN BR, ALONG GUIUAN - SULANGAN PENINSULA RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 99% | High risk61 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19I00137REPAIR/REHABILITATION OF BRGY. BAYBAY POB. FLOOD CONTROL, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱30M | 93% | Medium risk50 | Flagged0.045 |
| 19I00136RE-OPENING/IMPROVEMENT OF BRGY. DEL REMEDIO - BRGY. SAN MATEO - BRGY. SAN JUAN FARM-TO-MARKET ROAD, STA. 1+900 - STA. 3+257, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱34.9M | 59% | Medium risk49 | Flagged0.040 |
| 19I00135RE-OPENING/IMPROVEMENT OF BRGY. DEL REMEDIO - BRGY. SAN MATEO FARM-TO-MARKET ROAD, STA. 0+000 - STA. 1+900, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱32.4M | 64% | Medium risk50 | Flagged0.038 |
| 17IL0056OPENING/CONSTRUCTION/REHABILITATION OF BRGY. MABICAY-BRGY. SAN PEDRO FMR (STA. 1+000 - STA. 1+620) AND (STA. 1+620 -STA. 3+800), BRGYS. MABICAY AND SAN PEDRO, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱47.5M | 100% | Medium risk57 | Flagged0.013 |
| 22IB0095REHABILITATION OF THE JIPAPAD DETOUR BRIDGE, JIPAPAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.5M | 43% | Medium risk53 | Flagged0.012 |
| 18IB0190CONSTRUCTION OF HINOLASO BRIDGE III INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱49M | 100% | Medium risk52 | Flagged0.009 |
| 22IB0089CONSTRUCTION OF NEW BRIDGES, PAGNAMITAN BR, ALONG GUIUAN - SULANGAN PENINSULA RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 99% | High risk61 | Flagged0.005 |
| 22IB0082REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE DOLORES BR. (B00516SM), ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD | Region VIII | Eastern Samar DEO | On-Going | ₱49M | 72% | Medium risk53 | Flagged0.003 |
| 22IB0088CONSTRUCTION OF NEW BRIDGES, BIGO BR., ALONG ARTECHE - JIPAPAD - LAS NAVAS - RAWIS RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 100% | High risk63 | Flagged0.003 |
| 17IL0038ROAD WIDENING-DAANG MAHARLIKA (LT) K1031+667-K1036+000, K1036+000-K1037+971, K1038+000-K1039+793, LIBAGON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱227.5M | 100% | Medium risk58 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 21I00005NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - LILOAN - SAN RICARDO CIRCUMFERENTIAL ROAD, PACKAGE 2, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱124M | 73% | High risk60 | —-0.009 |
| 27 | 20I00001NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - LILOAN - SAN RICARDO CIRCUMFERENTIAL ROAD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱119.3M | 84% | High risk60 | —-0.007 |
| 28 | 22I00026NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN - STA. FE - SAN MIGUEL ROAD, LEYTE 1ST LD | Region VIII | Region VIII | Completed | ₱104.8M | 100% | High risk60 | —-0.072 |
| 29 | 22I00007REHABILITATION/RECONSTRUCTION OF NATIONAL ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, SECONDARY ROADS - CALUBIAN - SAN ISIDRO - TABANGO - VILLABA - PALOMPON ROAD, K1054+530 - K1054+665, LEYTE 3RD LD | Region VIII | Region VIII | Completed | ₱100M | 100% | Medium risk59 | —-0.083 |
| 30 | 22I00004ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - PALOMPON - ISABEL - MERIDA - ORMOC RD. - K1070+445 - K1070+626, LEYTE 4TH LD | Region VIII | Region VIII | Completed | ₱100M | 100% | Medium risk59 | —-0.079 |
| 31 | 22I00002ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - PALOMPON - ISABEL - MERIDA - ORMOC RD. - K1070+181 - K1070+280, K1070+308 - K1070+385, LEYTE 4TH LD | Region VIII | Region VIII | Completed | ₱100M | 100% | Medium risk59 | —-0.083 |
| 32 | 21IB0045REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE SECONDARY ROADS, WRIGHT-TAFT-BORONGAN ROAD K0914+780 - K0914+920 | Region VIII | Eastern Samar DEO | On-Going | ₱89.7M | 99% | Medium risk59 | —-0.019 |
| 33 | 21IB0046REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE SCONDARY ROADS , WRIGHT-TAFT-BORONGAN ROAD K0914+920-K0915+060 | Region VIII | Eastern Samar DEO | On-Going | ₱89.7M | 100% | Medium risk59 | —-0.019 |
| 34 | 17IB0021OFF - CARRIAGEWAY IMPROVEMENT ALONG JCT. TAFT - ORAS-SAN POLICARPO - ARTECHE ROAD (S00167SM), K0891+(-814) - K0891+685; K0892+044 - K0894+003; K0909+000 - K0909+836.7; K0903+856 - K0904+205; K0907+270 - K0907+804, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱47.5M | 100% | Medium risk58 | —-0.059 |
| 35 | 17IL0038ROAD WIDENING-DAANG MAHARLIKA (LT) K1031+667-K1036+000, K1036+000-K1037+971, K1038+000-K1039+793, LIBAGON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱227.5M | 100% | Medium risk58 | Flagged0.001 |
| 36 | 19IC0018ASSET PRESERVATION - REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BAGAHUPI-BABATNGON-STA. CRUZ - BARUGO-CARIGARA ROAD (S00066LT) CHAINAGE429 - CHAINAGE 1717, BABATNGON, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱91.7M | 100% | Medium risk58 | —-0.086 |
| 37 | 17IL0056OPENING/CONSTRUCTION/REHABILITATION OF BRGY. MABICAY-BRGY. SAN PEDRO FMR (STA. 1+000 - STA. 1+620) AND (STA. 1+620 -STA. 3+800), BRGYS. MABICAY AND SAN PEDRO, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱47.5M | 100% | Medium risk57 | Flagged0.013 |
| 38 | 21IL0072LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF CANIPAAN-TAWOG-MATIN-AO-CATUBLIAN ROAD, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱91.7M | 100% | Medium risk57 | —-0.083 |
| 39 | 17IB0022OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT. BUENAVISTA - LAWAAN - MARABUT ROAD (S00147SM), K0952+(-828) - K0953+538; K0960+003 - K0961+142 K0961+158 - K0962+549, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱48.1M | 100% | Medium risk57 | —-0.060 |
| 40 | 18IB0077RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT DOLORES BRIDGE (B00516SM), ALONG JCT. TAFT - ORAS- SAN POLICARPO - ARTECHE ROAD | Region VIII | Eastern Samar DEO | Completed | ₱69.5M | 100% | Medium risk56 | —-0.051 |
| 41 | 22IC0014NETWORK DEVELOPMENT-ROAD WIDENING-TERTIARY ROADS-BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA ROAD - K0911+540 - K0913+786, BABATNGON, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱86M | 100% | Medium risk56 | —-0.086 |
| 42 | 17IB0067RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT ORAS BRIDGE (B00522SM) ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱86.5M | 100% | Medium risk56 | —-0.022 |
| 43 | 17IB0052CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD (S00167SM), K0961+650 - K0961+980@B/S; K0963+371 - K0963+911@R/S, K0964+518 - K0964+713@L/S; K0964+792 - K0964+915@L/S, K0965+132 - K0965+303@L/S; K096 | Region VIII | Eastern Samar DEO | Completed | ₱43M | 100% | Medium risk56 | —-0.058 |
| 44 | 17IB0024OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT. TAFT-ORAS-SAN POLICARPO-ARTECHE ROAD (S00167SM) , K0915+212 - KO917+890; K0917+1475 - K0919+402, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱41.5M | 100% | Medium risk56 | —-0.058 |
| 45 | 17IB0020OFF - CARRIAGEWAY IMPROVEMENT ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD (S00167SM), K0939+500 - K0940+744; K0942+280 - K0943+344, K0943+432 - K0944+490; K0944+672 - K0944+1087, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱39.9M | 100% | Medium risk56 | —-0.058 |
| 46 | 18IB0105OFF-CARRIAGEWAY IMPROVEMENT (SECONDARY ROADS) JCT. BUENAVISTA - LAWAAN MARABUT ROAD, K0962+549 - K0962+630; K0962+700 - K0964+290; K0962+630 - K0962+700; K0964+290 - K0969+428; K0969+857 - K0970+150 | Region VIII | Eastern Samar DEO | Completed | ₱74.8M | 100% | Medium risk55 | —-0.089 |
| 47 | 20IB0001OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS JCT. BUENAVISTA - LAWAAN-MARABUT ROAD, K0953+638 - K0954+000, K0954+611 - K0954+836, K0970+150 - K0970+778, K0970+900 - K0972+003, K0972+380 - K0972+917, K0972+877 - K0972+929, K0972+965 - K0973+104, K0973+2 | Region VIII | Eastern Samar DEO | Completed | ₱71.2M | 100% | Medium risk55 | —-0.089 |
| 48 | 19I00127CONSTRUCTION OF EVACUATION CENTER, BALOGO, BRGY. SAN MATEO, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱34.2M | 95% | Medium risk55 | —-0.020 |
| 49 | 20I00051DIVISORIA - LANGIT - SAN ANTONIO FARM - SAN DIEGO - STO. NIÑO ROAD CONNECTING TO TIGBAO - STA. FE - SAN MIGUEL ROAD AND PALO - CARIGARA - ORMOC ROAD IN SUPPORT OF THE GARMENT INDUSTRY IN NEW ERA, BRGY. LANGIT, ALANG-ALANG, LEYTE | Region VIII | Region VIII | Completed | ₱66.6M | 100% | Medium risk55 | —-0.091 |
| 50 | 17IB0054CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG JCT. BUENAVISTA - LAWAAN - MARABUT ROAD(S00147SM), K0969+554 - K0970+915@R/S; K0952+412 - K0952+710@L/S, K0952+412 - K0952+710@L/S; K0952+986 - K0953+359@L/S, K0961+812 - K0962+340@L/S; K0962+700 - | Region VIII | Eastern Samar DEO | Completed | ₱42.8M | 100% | Medium risk55 | —-0.059 |