Contractor dossier
233 projects on file, including joint ventures this contractor is part of.
Total projects
233
Total budget
₱8.3B
Average progress
98.9%
Completion rate
93.1%
Average risk score
43.9
Medium risk on average, out of 100
Flagged as unusual
10
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 233 | ₱8.3B | 43.9 | 10 | 98.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 82 | ₱4.6B | 52.0 | 4 | 98.1% |
| Buildings and Facilities | 66 | ₱342.4M | 27.5 | 0 | 99.9% |
| Bridges | 41 | ₱1.3B | 46.2 | 5 | 97.9% |
| Flood Control and Drainage | 39 | ₱1.6B | 49.7 | 1 | 99.8% |
| Bridges, Roads | 4 | ₱388.5M | 59.8 | 0 | 100.0% |
| OTHER | 1 | ₱44.1M | 78.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19IB0071CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO PANINIHI-AN ISLAND AND BARANGITAW BEACH, SULAT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱44.1M | 100% | High risk78 | —-0.030 |
| 17IL0040LILO-AN-SAN RICARDO CIRCUMFERENTIAL ROAD (SAN RAMON SECTION), INCLUDING BRIDGES, SAN RICARDO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.049 |
| 18IB0084CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURIST DESTINATIONS BORONGAN - LLORENTE CLOSED CANOPY AREA, BRGY. SAN GABRIEL - BRGY. TAGASLIAN - BRGY. DEL PILAR INCLUDING BRIDGE, MAYDOLONG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱194M | 100% | High risk66 | —-0.035 |
| 18I00015ROAD WIDENING - PRIMARY ROADS: PALO - CARIGARA - ORMOC ROAD, KO919+247.92 - KO921+514; KO921+538 - KO926+407, LEYTE 1ST LD | Region VIII | Region VIII | Completed | ₱192.2M | 100% | High risk65 | —-0.059 |
| 18IL0010CONSTRUCTION OF CONCRETE BRIDGE, LILOAN-SAN RICARDO CIRCUMFERENTIAL ROAD, VIADUCT, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱168.9M | 100% | High risk65 | —-0.014 |
| 21IL0042NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS LILOAN - SAN RICARDO CIRCUMFERENTIAL ROAD (CONSTRUCTION OF VIADUCT), SOUTHERN LEYTE, SAN RICARDO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱144.8M | 100% | High risk65 | —-0.030 |
| 22IB0088CONSTRUCTION OF NEW BRIDGES, BIGO BR., ALONG ARTECHE - JIPAPAD - LAS NAVAS - RAWIS RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 100% | High risk63 | Flagged0.003 |
| 19I00151REHABILITATION/RECONSTRUCTION OF CIRCUMFERENTIAL ROADS WITH SLIPS, SLOPES COLLAPSED AND LANDSLIDE ALONG BRGY. PINGAN, GEN. MAC ACTHUR, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱99.1M | 100% | High risk63 | —-0.021 |
| 18I00036CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 0+720 - STATION 0+982, SECTION 5 PHASE 8, BRGY. COGON, PALO, LEYTE | Region VIII | Region VIII | Completed | ₱101.1M | 100% | High risk63 | —-0.053 |
| 20I00073CONSTRUCTION OF FLOOD CONTROL WALL ALONG MAINIT RIVER, PHASE 2, BRGY. CAVITE, ALANGALANG, LEYTE | Region VIII | Region VIII | Completed | ₱95.1M | 100% | High risk63 | —-0.071 |
| 17IL0005CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, SUBA SECTION,STA. 4+640-STA. 5+600, SUBA, SOGOD, SOUTHERN LEYTE, LONE DISTRICT, BRGY. SUBA, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱47M | 100% | High risk63 | —-0.051 |
| 19I00146REHABILITATION/RECONSTRUCTION OF CIRCUMFERENTIAL ROADS WITH SLIPS, SLOPES COLLAPSED AND LANDSLIDE ALONG BRGY. STA. FE, GEN. MAC ARTHUR, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱95.8M | 100% | High risk62 | —-0.025 |
| 20I00015NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - STA. FE - SAN MIGUEL ROAD, LEYTE | Region VIII | Region VIII | Completed | ₱135.1M | 100% | High risk62 | —-0.067 |
| 17IL0001CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, HIBOD-HIBOD SECTION, STA. 3+720 - STA 4+600, HIBOD-HIBOD, SOGOD, SOUTHERN LEYTE LONE DISTRICT, BRGY. HIBOD-HIBOD, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱46.7M | 100% | High risk62 | —-0.051 |
| 18IB0054OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD (S00167SM), K0898+100 - K0898+480; K0909+000 - K0910+710; K0910+1058 - K0911+010; K0911+174 - K0911+330; K0911+351 - K0912+274; K0912+288 - K0912+732; K0912+844 - K0913+344 | Region VIII | Eastern Samar DEO | Completed | ₱94.7M | 100% | High risk61 | —-0.084 |
| 22IB0117CONSTRUCTION OF ROAD, CANYUPAY - BAGONG BARRIO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.081 |
| 17IL0002CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, KANANGKAAN SECTION, STA. 7+920-STA. 8+760, KANANGKAAN, SOGOD, SOUTHERN LEYTE, LONE DISTRICT, BRGY. KANANGKAAN, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱43.9M | 100% | High risk61 | —-0.050 |
| 21I00055CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION/IMPROVEMENT OF JUNCTION NATIONAL ROAD, CAROLINA-CAN-AVID-DOLORES-MASLOG ROAD (BARANGAY AROGANGA - BARANGAY MAGSA.......DOLORES, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱125.9M | 100% | High risk61 | —-0.076 |
| 20IB0003REHABILITATION/RECONSTRUCTIONO F ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROAD BORONGAN - GUIUAN ROAD, K0980+450 - K0980+665 | Region VIII | Eastern Samar DEO | Completed | ₱92.9M | 100% | High risk61 | —-0.084 |
| 22IB0089CONSTRUCTION OF NEW BRIDGES, PAGNAMITAN BR, ALONG GUIUAN - SULANGAN PENINSULA RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 99% | High risk61 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19I00137REPAIR/REHABILITATION OF BRGY. BAYBAY POB. FLOOD CONTROL, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱30M | 93% | Medium risk50 | Flagged0.045 |
| 19I00136RE-OPENING/IMPROVEMENT OF BRGY. DEL REMEDIO - BRGY. SAN MATEO - BRGY. SAN JUAN FARM-TO-MARKET ROAD, STA. 1+900 - STA. 3+257, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱34.9M | 59% | Medium risk49 | Flagged0.040 |
| 19I00135RE-OPENING/IMPROVEMENT OF BRGY. DEL REMEDIO - BRGY. SAN MATEO FARM-TO-MARKET ROAD, STA. 0+000 - STA. 1+900, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱32.4M | 64% | Medium risk50 | Flagged0.038 |
| 17IL0056OPENING/CONSTRUCTION/REHABILITATION OF BRGY. MABICAY-BRGY. SAN PEDRO FMR (STA. 1+000 - STA. 1+620) AND (STA. 1+620 -STA. 3+800), BRGYS. MABICAY AND SAN PEDRO, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱47.5M | 100% | Medium risk57 | Flagged0.013 |
| 22IB0095REHABILITATION OF THE JIPAPAD DETOUR BRIDGE, JIPAPAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.5M | 43% | Medium risk53 | Flagged0.012 |
| 18IB0190CONSTRUCTION OF HINOLASO BRIDGE III INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱49M | 100% | Medium risk52 | Flagged0.009 |
| 22IB0089CONSTRUCTION OF NEW BRIDGES, PAGNAMITAN BR, ALONG GUIUAN - SULANGAN PENINSULA RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 99% | High risk61 | Flagged0.005 |
| 22IB0082REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE DOLORES BR. (B00516SM), ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD | Region VIII | Eastern Samar DEO | On-Going | ₱49M | 72% | Medium risk53 | Flagged0.003 |
| 22IB0088CONSTRUCTION OF NEW BRIDGES, BIGO BR., ALONG ARTECHE - JIPAPAD - LAS NAVAS - RAWIS RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 100% | High risk63 | Flagged0.003 |
| 17IL0038ROAD WIDENING-DAANG MAHARLIKA (LT) K1031+667-K1036+000, K1036+000-K1037+971, K1038+000-K1039+793, LIBAGON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱227.5M | 100% | Medium risk58 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 19I00135RE-OPENING/IMPROVEMENT OF BRGY. DEL REMEDIO - BRGY. SAN MATEO FARM-TO-MARKET ROAD, STA. 0+000 - STA. 1+900, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱32.4M | 64% | Medium risk50 | Flagged0.038 |
| 77 | 20IL0083CLUSTER 1 - LOCAL-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGYS. DAO BONTOC, LANAO BONTOC AND OTICON, LIBAGON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱6.9M | 100% | Medium risk50 | —-0.095 |
| 78 | 20IC0045FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONST. OF FLOOD CONTROL ALONG SAPINITON RIVER, BRGY. SANTOL, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱47.7M | 100% | Medium risk49 | —-0.081 |
| 79 | 21IC0016ASSET PRESERVATION - REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - CONST. OF ROAD SLOPE PROTECTION STRUCTURE - BAGAHUPI - BABATNGON - STA. CRUZ - BARUGO - CARIGARA ROAD (S00066LT) CHAINAGE 6380-CHAINAGE 6523 | Region VIII | Leyte 1st DEO | Completed | ₱38.7M | 100% | Medium risk49 | —-0.097 |
| 80 | 20IC0013ASSET PRESERVATION-REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROAD, BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA ROAD, K0923+380-K0924+500, BABATNGON, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱45.8M | 100% | Medium risk49 | —-0.096 |
| 81 | 20IC0012ASSET PRESERVATION - REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, BAGAHUPI - BABATNGON - STA. CRUZ - BARUGO ROAD (S00066LT) CHAINAGE 000 - CHAINAGE 417, BABATNGON, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱45.8M | 100% | Medium risk49 | —-0.091 |
| 82 | 18IB0108OFF-CARRIAGEWAY IMPROVEMENT (SECONDARY ROADS) JCT. BUENAVISTA - LAWAAN- MARABUT ROAD; K0975+266 - K0977+059; K0977+779 - K0978+777; K0978+812 - K0979+000 | Region VIII | Eastern Samar DEO | Completed | ₱39.4M | 100% | Medium risk49 | —-0.095 |
| 83 | 19I00136RE-OPENING/IMPROVEMENT OF BRGY. DEL REMEDIO - BRGY. SAN MATEO - BRGY. SAN JUAN FARM-TO-MARKET ROAD, STA. 1+900 - STA. 3+257, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱34.9M | 59% | Medium risk49 | Flagged0.040 |
| 84 | 19IB0107RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT DANAO BRIDGE (B00456SM), ALONG WRIGHT - TAFT - BORONGAN ROAD | Region VIII | Eastern Samar DEO | Completed | ₱19.6M | 100% | Medium risk49 | —-0.060 |
| 85 | 18IB0020REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPES COLLAPSE AND LANDSLIDE, JCT. BUENAVISTA - LAWAAN - MARABUT ROAD; K)960+767 - K0961+064, K0978+777 - K0978+812, K0989+564-K0898+752, K0982+885 - K0983+049, K0984+975 - K0984+995 | Region VIII | Eastern Samar DEO | Completed | ₱38.1M | 100% | Medium risk49 | —-0.095 |
| 86 | 19IB0109REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE AT VIGAN BRIDGE (B00490SM), ALONG BORONGAN - GUIUAN ROAD | Region VIII | Eastern Samar DEO | Completed | ₱29.4M | 100% | Medium risk49 | —-0.058 |
| 87 | 20IB0026CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, WRIGHT - TAFT - BORONGAN ROAD, K0893+300 - K0893+713, K0895+686 - K0896+000, K0897+978 - K0898+170, K0898+959 - K0899+184, K0904+249 - K0904+397, K0904+422 - K0904+5 | Region VIII | Eastern Samar DEO | Completed | ₱21.9M | 100% | Medium risk49 | —-0.094 |
| 88 | 21IE0034CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CAIGUIT-CABUNGAAN DIVERSION ROAD, LEYTEVILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱34.3M | 100% | Medium risk49 | —-0.095 |
| 89 | 18IL0027BRIDGE/WIDENING OF PERMANENT BRIDGES/ OTICON BR. (B00598LT) ALONG DAANG MAHARLIKA (LT) (WIDENING OF BRIDGE), LIBAGON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱36.6M | 100% | Medium risk49 | —-0.058 |
| 90 | 20IB0004OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS JCT. TAFT-ORAS - SAN POLICARPO - ARTECHE ROAD, K0897+515 - K0897+574, K0899+1122 - K0899+1223, K0902+443 - K0902+538, K0904+327 - K0904+363, K0908+009 - K0908+059, K0908+078 - K0908+239, K0908+950 - K0909+000 | Region VIII | Eastern Samar DEO | Completed | ₱26.2M | 100% | Medium risk49 | —-0.094 |
| 91 | 18IL0161CONSTRUCTION OF 2 STY - 4 CL SCHOOL BUILDING @ NEW GUINSAUGON NATIONAL HIGH SCHOOL (SCH. ID 313407), ST. BERNARD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱14.7M | 100% | Medium risk49 | —-0.052 |
| 92 | 20IL0082CLUSTER 6 - LOCAL-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGYS. CATUOGAN BONTOC, HUGPA TOMAS OPPUS, AND LUAN TOMAS OPPUS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱5.9M | 100% | Medium risk49 | —-0.096 |
| 93 | 18IL0067CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES/ ROAD FROM PATONG-TUBURAN-ILAYA-NAVA-SAN JUAN ROAD CONNECTING TO SC GLOBAL MANUFACTURER, SOGOD BAY COCO-ACTIVE CARBON, KENNEMER FOODS INTERNATIONAL, MACROHON-MAASIN- | Region VIII | Southern Leyte 1st DEO | Completed | ₱34.3M | 100% | Medium risk49 | —-0.093 |
| 94 | 22IB0026CONSTRUCTION OF BRGY. CABONG FLOOD CONTROL, BRGY. CABONG, BORONGAN CITY, EASTERN SAMAR, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.078 |
| 95 | 22IB0023REHABILITATION/ IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG CAN-OBING RIVER, BRGY. BATO, BORONGAN CITY, EASTERN SAMAR, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.079 |
| 96 | 20IB0092CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD FROM NATIONAL HIGHWAY LEADING TO BORONGAN CITY AIRPORT, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱24.5M | 100% | Medium risk49 | —-0.093 |
| 97 | 20IB0006OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS BORONGAN-GUIUAN ROAD, K0960+319 - K0961+673, K0961+708 - K0961+943, K0963+935 - K0964+744 | Region VIII | Eastern Samar DEO | Completed | ₱23.9M | 100% | Medium risk49 | —-0.095 |
| 98 | 18IB0057RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT PAGBABANGNAN BRIDGE (B00471SM), ALONG WRIGHT - TAFT - BORONGAN ROAD | Region VIII | Eastern Samar DEO | Completed | ₱12.2M | 100% | Medium risk49 | —-0.058 |
| 99 | 19IB0247REHABILITATION/REALIGNMENT OF DAMGED/COLLAPSED ACCESS ROAD, ALONG BRGY. STA. FE, GEN. MACARTHUR, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱44.4M | 100% | Medium risk49 | —-0.036 |
| 100 | 18IL0024WIDENING OF PERMANENT BRIDGES/MAGAPSO BR. (00589LT) ALONG DAANG MAHARLIKA (LT) (WIDENING OF BRIDGE), LIBAGON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱25.1M | 100% | Medium risk48 | —-0.058 |