233 projects on file, including joint ventures this contractor is part of.
Total projects
233
Total budget
₱8.3B
Average progress
98.9%
Completion rate
93.1%
Average risk score
43.9
Medium risk on average, out of 100
Flagged as unusual
10
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 233 | ₱8.3B | 43.9 | 10 | 98.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 82 | ₱4.6B | 52.0 | 4 | 98.1% |
| Buildings and Facilities | 66 | ₱342.4M | 27.5 | 0 | 99.9% |
| Bridges | 41 | ₱1.3B | 46.2 | 5 | 97.9% |
| Flood Control and Drainage | 39 | ₱1.6B | 49.7 | 1 | 99.8% |
| Bridges, Roads | 4 | ₱388.5M | 59.8 | 0 | 100.0% |
| OTHER | 1 | ₱44.1M | 78.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19IB0071CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO PANINIHI-AN ISLAND AND BARANGITAW BEACH, SULAT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱44.1M | 100% | High risk78 | —-0.030 |
| 17IL0040LILO-AN-SAN RICARDO CIRCUMFERENTIAL ROAD (SAN RAMON SECTION), INCLUDING BRIDGES, SAN RICARDO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.049 |
| 18IB0084CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURIST DESTINATIONS BORONGAN - LLORENTE CLOSED CANOPY AREA, BRGY. SAN GABRIEL - BRGY. TAGASLIAN - BRGY. DEL PILAR INCLUDING BRIDGE, MAYDOLONG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱194M | 100% | High risk66 | —-0.035 |
| 18I00015ROAD WIDENING - PRIMARY ROADS: PALO - CARIGARA - ORMOC ROAD, KO919+247.92 - KO921+514; KO921+538 - KO926+407, LEYTE 1ST LD | Region VIII | Region VIII | Completed | ₱192.2M | 100% | High risk65 | —-0.059 |
| 18IL0010CONSTRUCTION OF CONCRETE BRIDGE, LILOAN-SAN RICARDO CIRCUMFERENTIAL ROAD, VIADUCT, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱168.9M | 100% | High risk65 | —-0.014 |
| 21IL0042NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS LILOAN - SAN RICARDO CIRCUMFERENTIAL ROAD (CONSTRUCTION OF VIADUCT), SOUTHERN LEYTE, SAN RICARDO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱144.8M | 100% | High risk65 | —-0.030 |
| 22IB0088CONSTRUCTION OF NEW BRIDGES, BIGO BR., ALONG ARTECHE - JIPAPAD - LAS NAVAS - RAWIS RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 100% | High risk63 | Flagged0.003 |
| 19I00151REHABILITATION/RECONSTRUCTION OF CIRCUMFERENTIAL ROADS WITH SLIPS, SLOPES COLLAPSED AND LANDSLIDE ALONG BRGY. PINGAN, GEN. MAC ACTHUR, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱99.1M | 100% | High risk63 | —-0.021 |
| 18I00036CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 0+720 - STATION 0+982, SECTION 5 PHASE 8, BRGY. COGON, PALO, LEYTE | Region VIII | Region VIII | Completed | ₱101.1M | 100% | High risk63 | —-0.053 |
| 20I00073CONSTRUCTION OF FLOOD CONTROL WALL ALONG MAINIT RIVER, PHASE 2, BRGY. CAVITE, ALANGALANG, LEYTE | Region VIII | Region VIII | Completed | ₱95.1M | 100% | High risk63 | —-0.071 |
| 17IL0005CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, SUBA SECTION,STA. 4+640-STA. 5+600, SUBA, SOGOD, SOUTHERN LEYTE, LONE DISTRICT, BRGY. SUBA, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱47M | 100% | High risk63 | —-0.051 |
| 19I00146REHABILITATION/RECONSTRUCTION OF CIRCUMFERENTIAL ROADS WITH SLIPS, SLOPES COLLAPSED AND LANDSLIDE ALONG BRGY. STA. FE, GEN. MAC ARTHUR, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱95.8M | 100% | High risk62 | —-0.025 |
| 20I00015NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - STA. FE - SAN MIGUEL ROAD, LEYTE | Region VIII | Region VIII | Completed | ₱135.1M | 100% | High risk62 | —-0.067 |
| 17IL0001CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, HIBOD-HIBOD SECTION, STA. 3+720 - STA 4+600, HIBOD-HIBOD, SOGOD, SOUTHERN LEYTE LONE DISTRICT, BRGY. HIBOD-HIBOD, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱46.7M | 100% | High risk62 | —-0.051 |
| 18IB0054OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD (S00167SM), K0898+100 - K0898+480; K0909+000 - K0910+710; K0910+1058 - K0911+010; K0911+174 - K0911+330; K0911+351 - K0912+274; K0912+288 - K0912+732; K0912+844 - K0913+344 | Region VIII | Eastern Samar DEO | Completed | ₱94.7M | 100% | High risk61 | —-0.084 |
| 22IB0117CONSTRUCTION OF ROAD, CANYUPAY - BAGONG BARRIO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.081 |
| 17IL0002CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, KANANGKAAN SECTION, STA. 7+920-STA. 8+760, KANANGKAAN, SOGOD, SOUTHERN LEYTE, LONE DISTRICT, BRGY. KANANGKAAN, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱43.9M | 100% | High risk61 | —-0.050 |
| 21I00055CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION/IMPROVEMENT OF JUNCTION NATIONAL ROAD, CAROLINA-CAN-AVID-DOLORES-MASLOG ROAD (BARANGAY AROGANGA - BARANGAY MAGSA.......DOLORES, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱125.9M | 100% | High risk61 | —-0.076 |
| 20IB0003REHABILITATION/RECONSTRUCTIONO F ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROAD BORONGAN - GUIUAN ROAD, K0980+450 - K0980+665 | Region VIII | Eastern Samar DEO | Completed | ₱92.9M | 100% | High risk61 | —-0.084 |
| 22IB0089CONSTRUCTION OF NEW BRIDGES, PAGNAMITAN BR, ALONG GUIUAN - SULANGAN PENINSULA RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 99% | High risk61 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19I00137REPAIR/REHABILITATION OF BRGY. BAYBAY POB. FLOOD CONTROL, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱30M | 93% | Medium risk50 | Flagged0.045 |
| 19I00136RE-OPENING/IMPROVEMENT OF BRGY. DEL REMEDIO - BRGY. SAN MATEO - BRGY. SAN JUAN FARM-TO-MARKET ROAD, STA. 1+900 - STA. 3+257, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱34.9M | 59% | Medium risk49 | Flagged0.040 |
| 19I00135RE-OPENING/IMPROVEMENT OF BRGY. DEL REMEDIO - BRGY. SAN MATEO FARM-TO-MARKET ROAD, STA. 0+000 - STA. 1+900, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱32.4M | 64% | Medium risk50 | Flagged0.038 |
| 17IL0056OPENING/CONSTRUCTION/REHABILITATION OF BRGY. MABICAY-BRGY. SAN PEDRO FMR (STA. 1+000 - STA. 1+620) AND (STA. 1+620 -STA. 3+800), BRGYS. MABICAY AND SAN PEDRO, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱47.5M | 100% | Medium risk57 | Flagged0.013 |
| 22IB0095REHABILITATION OF THE JIPAPAD DETOUR BRIDGE, JIPAPAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.5M | 43% | Medium risk53 | Flagged0.012 |
| 18IB0190CONSTRUCTION OF HINOLASO BRIDGE III INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱49M | 100% | Medium risk52 | Flagged0.009 |
| 22IB0089CONSTRUCTION OF NEW BRIDGES, PAGNAMITAN BR, ALONG GUIUAN - SULANGAN PENINSULA RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 99% | High risk61 | Flagged0.005 |
| 22IB0082REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE DOLORES BR. (B00516SM), ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD | Region VIII | Eastern Samar DEO | On-Going | ₱49M | 72% | Medium risk53 | Flagged0.003 |
| 22IB0088CONSTRUCTION OF NEW BRIDGES, BIGO BR., ALONG ARTECHE - JIPAPAD - LAS NAVAS - RAWIS RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 100% | High risk63 | Flagged0.003 |
| 17IL0038ROAD WIDENING-DAANG MAHARLIKA (LT) K1031+667-K1036+000, K1036+000-K1037+971, K1038+000-K1039+793, LIBAGON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱227.5M | 100% | Medium risk58 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 19IL0067BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - LOCAL PROGRAM, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN VICENTE, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱3.5M | 100% | Low risk28 | —-0.096 |
| 202 | 17IB0093RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT PAYA BRIDGE (B00502SM), ALONG BUENAVISTA-LAWAAN-MARABUT ROAD. | Region VIII | Eastern Samar DEO | Completed | ₱2.5M | 100% | Low risk28 | —-0.031 |
| 203 | 20IL0080LOCAL-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. CABULIHAN, LIMASAWA, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱3M | 100% | Low risk26 | —-0.095 |
| 204 | 19IL0070BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - LOCAL PROGRAM, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TRIANA, LIMASAWA, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱3.5M | 100% | Low risk26 | —-0.095 |
| 205 | 17IB0089RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT STA. CRUZ BRIDGE (B00500SM) ALONG JCT. BUENAVISTA - LAWAAN - MARABUT ROAD | Region VIII | Eastern Samar DEO | Completed | ₱3.8M | 100% | Low risk24 | —-0.032 |
| 206 | 18IB0063RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT BUGAS BRIDGE (B00472SM), ALONG BORONGAN - GUIUAN ROAD | Region VIII | Eastern Samar DEO | Completed | ₱4.4M | 100% | Low risk24 | —-0.056 |
| 207 | 20IL0100LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES - LOCAL ROADS, CONCRETING OF LOCAL ROAD, BRGY. MAGALLANES, LIMASAWA, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱3M | 100% | Low risk24 | —-0.093 |
| 208 | 17IB0090RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT SAN PEDRO BRIDGE (B00498SM) ALONG JCT. BUENAVISTA - LAWAAN - MARABUT ROAD | Region VIII | Eastern Samar DEO | Completed | ₱4.3M | 100% | Low risk23 | —-0.031 |
| 209 | 18IB0064RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT MACABUT BRIDGE (B00492SM), ALONG BORONGAN -GUIUAN ROAD | Region VIII | Eastern Samar DEO | Completed | ₱4.7M | 100% | Low risk23 | —-0.057 |
| 210 | 20IL0104LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES - LOCAL ROADS/CONCRETING OF LOCAL ROAD, BRGY. UNION, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱2M | 100% | Low risk23 | —-0.092 |
| 211 | 18IB0082REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES AT BALANGIGA BRIDGE (B00508SM), ALONG JCT. BUENAVISTA - LAWAAN - MARABUT ROAD | Region VIII | Eastern Samar DEO | Completed | ₱1.9M | 100% | Low risk20 | —-0.056 |
| 212 | 18IL0089LOCAL ROADS AND BRIDGES-LOCAL ROADS-LOCAL INFRASTRUCTURE PROGRAM/CONSTRUCTION/IMPROVEMENT OF MERCEDES-KAWAYAN ROAD, SILAGO, SOUTHERN LEYTE (CONSTRUCTION OF CONCRETE ROAD) | Region VIII | Southern Leyte 1st DEO | Completed | ₱1.9M | 100% | Low risk19 | —-0.091 |
| 213 | 20IL0147LOCAL - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CATMON, ST. BERNARD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱1M | 100% | Low risk19 | —-0.095 |
| 214 | 17IL0083CONSTRUCTION OF 1STY/2CL SCHOOL BUILDING W/ ATTACHED TOILET AND COMMON HANDWASHING FACILITY, STA. CRUZ ELEMENTARY SCHOOL (SCH ID122215), STA. CRUZ, MALITBOG, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱3M | 100% | Low risk10 | —-0.026 |
| 215 | 17IL0111CONSTRUCTION OF 1STY/2CL SCHOOL BUILDING W/ TOILET AND HANDWASHING FACILITY AT GAKAT ELEMENTARY SCHOOL (SCH ID122078), GAKAT, LIBAGON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱2.8M | 100% | Low risk10 | —-0.027 |
| 216 | 17IL0098CONSTRUCTION OF 1STY/2CL SCHOOL BUILDING W/ TOILET AND HANDWASHING FACILITY AT KATIPUNAN NATIONAL HIGH SCHOOL - BLDG 1(SCH ID313408), KATIPUNAN, SILAGO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱2.9M | 100% | Low risk10 | —-0.026 |
| 217 | 17IL0176CONSTRUCTION OF 1STY/2CL SCHOOL BUILDING W/ TOILET AND HANDWASHING FACILITY AT SILAGO CENTRAL SCHOOL - BLDG. 2 (SCH. ID#122059), SILAGO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱2.8M | 100% | Low risk10 | —-0.027 |
| 218 | 17IL0174CONSTRUCTION OF 1STY/2CL SCHOOL BUILDING W/ TOILET AND HANDWASHING FACILITY AT INGAN ELEMENTARY SCHOOL - BLDG. 2 (SCH. ID#122033), HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱2.8M | 100% | Low risk10 | —-0.027 |
| 219 | 17IL0116CONSTRUCTION OF 1STY/2CL SCHOOL BUILDING W/ TOILET AND HANDWASHING FACILITY AT INGAN ELEMENTARY SCHOOL (SCH ID122033), HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱2.8M | 100% | Low risk10 | —-0.027 |
| 220 | 17IL0170CONSTRUCTION OF 1STY/2CL SCHOOL BUILDING W/ TOILET AND HANDWASHING FACILITY AT MALINAO ELEMENTARY SCHOOL - BLDG. 3 (SCH. ID#122297), MALINAO, ST. BERNARD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱2.8M | 100% | Low risk10 | —-0.027 |
| 221 | 17IL0112CONSTRUCTION OF 1STY/2CL SCHOOL BUILDING W/ TOILET AND HANDWASHING FACILITY AT MALINAO ELEMENTARY SCHOOL (SCH ID122297), MALINAO, ST. BERNARD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱2.8M | 100% | Low risk10 | —-0.027 |
| 222 | 17IL0113CONSTRUCTION OF 1STY/2CL SCHOOL BUILDING W/ TOILET AND HANDWASHING FACILITY AT TABONTABON ELEMENTARY SCHOOL (SCH ID122305), TABONTABON, ST. BERNARD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱2.8M | 100% | Low risk10 | —-0.027 |
| 223 | 17IL0171CONSTRUCTION OF 1STY/2CL SCHOOL BUILDING W/ TOILET AND HANDWASHING FACILITY AT TABONTABON ELEMENTARY SCHOOL - BLDG. 2 (SCH. ID#122305), TABONTABON, ST. BERNARD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱2.8M | 100% | Low risk10 | —-0.027 |
| 224 | 17IL0175CONSTRUCTION OF 1STY/2CL SCHOOL BUILDING W/ TOILET AND HANDWASHING FACILITY AT OTAMA ELEMENTARY SCHOOL - BLDG. 2 (SCH. ID#122042), HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱2.8M | 100% | Low risk9 | —-0.027 |
| 225 | 17IL0117CONSTRUCTION OF 1STY/2CL SCHOOL BUILDING W/ ATTACHED TOILET AND COMMON HANDWASHING FACILITY AT OTAMA ELEMENTARY SCHOOL (SCH ID122042), HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱2.8M | 100% | Low risk9 | —-0.027 |