Contractor dossier
101 projects on file, including joint ventures this contractor is part of.
Total projects
101
Total budget
₱4B
Average progress
99.0%
Completion rate
91.1%
Average risk score
47.6
Medium risk on average, out of 100
Flagged as unusual
3
3.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 101 | ₱4B | 47.6 | 3 | 99.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 47 | ₱1.6B | 47.3 | 1 | 99.7% |
| Flood Control and Drainage | 29 | ₱2B | 54.8 | 0 | 98.0% |
| Buildings and Facilities | 23 | ₱275.1M | 34.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱192.8M | 94.3 | 2 | 84.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BF0034OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (SANTIAGO SECTION PHASE 4) QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 79% | High risk94 | Flagged0.005 |
| 25BF0033OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (SANTIAGO SECTION PHASE 3), BARANGAY SANTIAGO, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 91% | High risk94 | Flagged0.001 |
| 17BF0027NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS PRIMARY ROADS-OTHER PRIMARY ROADS ALONG NATIONAL ROADS ALONG SANTIAGO-TUGUEGARAO ROAD, K0369+000-K0371+000, K0373+000-K0374+000, K0374+947-K0376+000, AURORA AND SAN MANUEL, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱91.2M | 100% | High risk69 | —-0.026 |
| 25BG0077CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF ROAD, BARANGAY BURGOS- SAN FRANCISCO, ALICIA, ISA | Region II | Isabela 3rd DEO | On-Going | ₱4.9M | 100% | High risk68 | —-0.034 |
| 25BG0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY AURORA-CALLAO, ALICIA, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱4.9M | 100% | High risk68 | —-0.034 |
| 17BF0052CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS: CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT (QUI-BUR BRIDGE ABUTMENT B DOWNSTREAM SECTION), STA.0+000-STA.0+500, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱18.6M | 100% | High risk67 | —-0.043 |
| 17BF0023CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (BRGY. SAN PEDRO AND MARCOS SECTION) STA.0+000-STA.0+750, ROXAS, ISABELA, SAN PEDRO AND MARCOS,ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱27.9M | 100% | High risk67 | —-0.039 |
| 17BF0053CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS: CONSTRUCTION OF DISABUNGAN RIVER FLOOD CONTROL PROJECT (BINATUG BRIDGE ABUTMENT (B) SECTION), SAN MARIANO, ISABELA, BINATUG, SAN MARIANO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱18.6M | 100% | High risk66 | —-0.043 |
| 17BG0027NETWORK DEVELOPMENT, IMPROVEMENT/WIDENING OF NATIONAL ROADS, SANTIAGO-TUGUEGARAO RD., K0342+(-039)-K0343+884, OSCARIZ, RAMON, ISABELA - SINAMAR SUR, SAN MATEO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱46.5M | 100% | High risk66 | —-0.053 |
| 17BG0021CONCRETING OF SAN PABLO-SAN PABLO ROAD, BRGY. SAN PABLO, ALICIA, ISABELA 3RD LD, SAN PABLO, ALICIA, ISABELA STA. 0+000-0+560.00 W/ EXCEPTION STA. 0+000-0+056.50 | Region II | Isabela 3rd DEO | Completed | ₱6.6M | 100% | High risk66 | —-0.057 |
| 24BG0046OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAGAT RIVER, TUROD | Region II | Isabela 3rd DEO | Completed | ₱144.5M | 100% | High risk65 | —-0.044 |
| 17BF0018ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4)-TERTIARY ROADS ALONG NAGUILIAN-SAN MARIANO ROAD | Region II | Isabela 2nd DEO | Completed | ₱29M | 100% | High risk65 | —-0.050 |
| 23B00058OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, SIFFU RIVER AT ANAO, ROXAS, IS | Region II | Region II | Completed | ₱190.6M | 100% | High risk64 | —-0.035 |
| 25BG0109OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER FLOOD CONTROL STRUCTURE, BARANGAY SAN MANUEL, NAGUILIAN, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱93.6M | 70% | High risk63 | —-0.022 |
| 22BG0053OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. N | Region II | Isabela 3rd DEO | Completed | ₱95.1M | 100% | High risk63 | —-0.054 |
| 19B00011OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MNG'T PROGRAM - CONST'N/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONST'N OF MAGAT RIVER FLOOD MNG'T, SAN ROQUE, SAN MATEO, ISABELA | Region II | Region II | Completed | ₱121.9M | 100% | High risk62 | —-0.051 |
| 24BF0034ORGANIZATIONAL OUTCOME 2: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, | Region II | Isabela 2nd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.053 |
| 25BF0036OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (IMBIAO SECTION PHASE II), ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 77% | High risk62 | —-0.023 |
| 24BG0063OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJ, BRGY DISTRICT 1 CONT. (STA 0+246.80-STA 0+701.10) | Region II | Isabela 3rd DEO | On-Going | ₱96.4M | 100% | High risk62 | —-0.028 |
| 25BG0096OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL STRUCTURE, BARANGAY MALALATANG TUNGI, REINA MERCEDES | Region II | Isabela 3rd DEO | On-Going | ₱96.4M | 94% | High risk62 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BF0034OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (SANTIAGO SECTION PHASE 4) QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 79% | High risk94 | Flagged0.005 |
| 18BF0111CONCRETING OF BRGY. MABINI - BRGY. UNION FMR PHASE I, BRGY. MABINI AND BRGY. UNION, GAMU, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.7M | 100% | Medium risk47 | Flagged0.003 |
| 25BF0033OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (SANTIAGO SECTION PHASE 3), BARANGAY SANTIAGO, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.4M | 91% | High risk94 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 20B00032ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALICIA BYPASS ROAD, ALICIA, ISABELA ROAD, ISABELA; STA. 0+860 - STA. 1+747.02, ALICIA, ISABELA | Region II | Region II | Completed | ₱100.9M | 100% | Medium risk56 | —-0.068 |
| 27 | 18B00020NETWORK DEV'T: CONST'N OF BY-PASS AND DIVERSION ROAD ALONG SAN MATEO-ALFONSO LISTA DIVERSION ROAD, INCLUDING ROW, ISABELA, K0000+000-K0002+820=STA. 000++000-STA. 002+820, SAN MATEO, ISABELA | Region II | Region II | Completed | ₱110.3M | 100% | Medium risk55 | —-0.069 |
| 28 | 23B00010OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- SANTIAGO CIRCUMFERENTIAL ROAD, PACKAGE 1, ISABELA | Region II | Region II | Completed | ₱92.4M | 100% | Medium risk55 | —-0.071 |
| 29 | 23B00004OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- CORDON BY-PASS ROAD - PACKAGE 1 | Region II | Region II | Completed | ₱111.1M | 100% | Medium risk55 | —-0.069 |
| 30 | 17BF0088CONCRETING OF MABINI-UNION FMR, MABINI-UNION, GAMU, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱8.5M | 100% | Medium risk55 | —-0.003 |
| 31 | 18BF0177CONSTRUCTION OF SAN MARIANO EVACUATION CENTER (PHASE I), SAN MARIANO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱46.8M | 100% | Medium risk53 | —-0.075 |
| 32 | 18BG0068NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALICIA BY-PASS ROAD, INCL. ROW AND SLOPE PROTECTION, ALICIA, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱77.4M | 100% | Medium risk51 | —-0.075 |
| 33 | 19BG0001NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - ALICIA BYPASS ROAD INCL. ROW AND SLOPE PROTECTION, ALICIA, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱75.4M | 100% | Medium risk51 | —-0.076 |
| 34 | 21BG0089OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - NAGUILIAN (JCT. CVR) - PALANAN ROAD, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱71.3M | 100% | Medium risk51 | —-0.075 |
| 35 | 21BG0062OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY.PALATTAO, NAGUILIAN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱56.1M | 100% | Medium risk51 | —-0.065 |
| 36 | 24BG0183OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAGAYAN RIVER, BRGY. CENTRO 3, ANGADA | Region II | Isabela 3rd DEO | Completed | ₱77.1M | 100% | Medium risk51 | —-0.062 |
| 37 | 20B00051CONSTRUCTION OF EVACUATION CENTER, BRGY. CENTRO 03, ANGADANAN, ISABELA | Region II | Region II | Completed | ₱34.2M | 100% | Medium risk50 | —-0.071 |
| 38 | 20BG0137LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SAN MARIANO EVACUATION CENTER - PHASE 2), BRGY. MINANGA, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱28.8M | 100% | Medium risk49 | —-0.063 |
| 39 | 20BG0138CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF EVACUATION CENTER (PHASE 2), SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱28.8M | 100% | Medium risk49 | —-0.077 |
| 40 | 17BF0071CONSTRUCTION OF MULTI-PURPOSE EVACUATION CENTER, SAN MANUEL NAGUILIAN, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.7M | 100% | Medium risk49 | —-0.046 |
| 41 | 20BG0079OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - NAGUILIAN-BENITO SOLIVEN-SAN MARIANO-DIVILACAN-MACONACON-PALANAN ROAD, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱47.8M | 100% | Medium risk48 | —-0.079 |
| 42 | 19BG0060LOCAL INFRASTRUCTURE PROGRAM -LOCAL ROADS AND BRIDGES - CONCRETING OF BANNAWAG-CALOACAN ROAD BRGY. CALOACAN-BANNAWAG, ANGADANAN, LSABELA | Region II | Isabela 3rd DEO | Completed | ₱48.5M | 100% | Medium risk48 | —-0.054 |
| 43 | 23BF0047ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CO | Region II | Isabela 2nd DEO | Completed | ₱48.2M | 100% | Medium risk47 | —-0.067 |
| 44 | 18BF0111CONCRETING OF BRGY. MABINI - BRGY. UNION FMR PHASE I, BRGY. MABINI AND BRGY. UNION, GAMU, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.7M | 100% | Medium risk47 | Flagged0.003 |
| 45 | 24BG0030OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, ROXAS SECTI | Region II | Isabela 3rd DEO | Completed | ₱48.9M | 100% | Medium risk47 | —-0.065 |
| 46 | 19BF0054PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CASILI CREEK FLOOD CONTROL PROJECT (MALLIG PUBLIC MARKET SECTION), MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱47.5M | 100% | Medium risk47 | —-0.067 |
| 47 | 17BF0086CONCRETING OF SAN PLACIDO PUROK 1-2 FMR, SAN PLACIDO, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.7M | 100% | Medium risk47 | —-0.000 |
| 48 | 18BF0027ASSET PRESERVATION: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROAD ALONG NAGUILIAN-SAN MARIANO ROAD (S00789LZ) K0399+000-K0400+000, K0400+000-K0401+000, K0401+000-K0402+000, K0402+000-K0402+470, STA.FILOMENA AND ZONE III, SAN | Region II | Isabela 2nd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.079 |
| 49 | 18BF0062NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS ALONG DAANG MAHARLIKA(LZ) (S00782LZ) K0382+(-1051) - K0382+000, K0383+450 - K0383+668, K0383+740 - K0383+830, K0386+193 - K0386+291, NAGUILIAN, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱40.7M | 100% | Medium risk45 | —-0.082 |
| 50 | 19BG0007NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - ALICIA - SAN MATEO ROAD - K0351+710 TO K0353+000 | Region II | Isabela 3rd DEO | Completed | ₱41.5M | 100% | Medium risk44 | —-0.084 |