Contractor dossier
591 projects on file, including joint ventures this contractor is part of.
Total projects
591
Total budget
₱19.7B
Average progress
96.8%
Completion rate
91.5%
Average risk score
46.5
Medium risk on average, out of 100
Flagged as unusual
14
2.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 286 | ₱7.2B | 41.4 | 3 | 100.0% |
| Negros Island Region | 99 | ₱3B | 48.8 | 4 | 91.4% |
| Region V | 68 | ₱3.4B | 55.8 | 0 | 99.6% |
| Region IV-A | 34 | ₱1B | 50.0 | 0 | 87.0% |
| Region VI | 30 | ₱1.7B | 54.6 | 7 | 82.7% |
| Region X | 27 | ₱1.7B | 48.5 | 0 | 99.2% |
| Region IX | 25 | ₱955.5M | 56.6 | 0 | 100.0% |
| Region IV-B | 13 | ₱466.9M | 39.6 | 0 | 100.0% |
| Region VII | 6 | ₱120.4M | 47.2 | 0 | 100.0% |
| National Capital Region | 3 | ₱79.4M | 46.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 212 | ₱8.8B | 49.5 | 1 | 96.4% |
| Buildings and Facilities | 117 | ₱2.1B | 35.0 | 2 | 97.6% |
| Bridges | 112 | ₱3.2B | 47.6 | 5 | 95.3% |
| Flood Control and Drainage | 111 | ₱4.4B | 49.3 | 1 | 99.6% |
| Water Provision and Storage | 17 | ₱64.8M | 23.1 | 0 | 100.0% |
| OTHER | 12 | ₱531.4M | 76.7 | 0 | 100.0% |
| Bridges, Roads | 5 | ₱510.1M | 61.5 | 1 | 83.4% |
| GAA 2025 SSP | 4 | ₱39.4M | 89.8 | 4 | 59.1% |
| GAA 2025 OO-1 | 1 | ₱22.1M | 86.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GN0064CONSTRUCTION OF ROAD AT BARANGAY GUINTORILAN, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.9M | 36% | High risk94 | Flagged0.022 |
| 25GL0102CONSTRUCTION OF MUNICIPAL HALL - ANNEX BUILDING, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱9.9M | 70% | High risk93 | Flagged0.013 |
| 25RD0095CONSTRUCTION OF ROADS (SITIO LIBOT LIBOT BRGY. PANDAN UP TO BRGY. PROPER), PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.8M | 78% | High risk93 | Flagged0.011 |
| 25GQ0016REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD. - K0049+092 - K0049+157 | Negros Island Region | Negros Occidental 5th DEO | Completed | ₱22.1M | 100% | High risk86 | —-0.030 |
| 20IB0083CONSTRUCTION OF MISSING LINKS/NEW ROADS ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD, JIPAPAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱96.9M | 100% | High risk83 | —-0.023 |
| 20IF0011WIDENING OF PERMANENT BRIDGES, BACAN BR. (B00582LT) ALONG ORMOC-BAYBAY SOUTHERN LEYTE BDRY. ROAD | Region VIII | Leyte 4th DEO | Completed | ₱69.6M | 100% | High risk81 | —-0.035 |
| 17IL0071MAASIN CITY BYPASS ROAD CUM SEA WALL, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱49M | 100% | High risk80 | —-0.036 |
| 25RE0012CONSTRUCTION OF ROAD OF BARANGAY CRUZ PASSING THRU BARANGAY MACASILAO, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱9.9M | 52% | High risk79 | Flagged0.018 |
| 17FG0038INDV. PROJECT PAVING OF SHOULDERS WITH DRAINAGE IMPROVEMENT ALONG NABUA BALATAN ROAD, NABUA BALATAN, CAMARINES SUR K0 477+177 - K0477+440, K0483+000 - 483+591, K0 488+649 - K0 488+801, K0489+590 - K0489+800, K0491+332 - K0 491+622, K0 492+450 - KO 493+000 | Region V | Camarines Sur 5th DEO | Completed | ₱48.2M | 100% | High risk78 | —-0.037 |
| 17IC0024IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG DAANG MAHARLIKA (LT) (S00024LT) K0930+123 - K 0930+816, K0930+824 - K0930+911, K0930+921 - K0931+509, TELEGRAFO, TOLOSA, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱38.4M | 100% | High risk77 | —-0.038 |
| 19IF0098CONSTRUCTION OF MULTI-PURPOSE (MUNICIPAL) BUILDING, PHASE I, MATAG-OB, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱8.9M | 100% | High risk77 | —-0.038 |
| 17FG0039INDV. PROJ. REHAB./RECONST./UPGRADING DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE ALONG IRIGA CITY-SAN ISIDRO-SAGRADA-SAN RAMON-HANAWAN ROAD, IRIGA CITY K0 484+(-031.40)-K0 484+455, K0 485+(-020.80)-K0 485+108.80, K0 486+333-K0 487+000 | Region V | Camarines Sur 5th DEO | Completed | ₱18.6M | 100% | High risk76 | —-0.036 |
| 17FG0044INDV. PROJ. - CONCRETING OF MONTE-CALVARIO-IGBAC BARANGAY ROAD, MONTE-CALVARIO AND IGBAC, BUHI, CAMARINES SUR STA. 00+000-STA. 00+105, STA. 00+165-STA. 00+298, STA. 00+379-STA. 00+733 | Region V | Camarines Sur 5th DEO | Completed | ₱9.4M | 100% | High risk76 | —-0.035 |
| 18JI0054RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES AT SAN JOSE BR. (B00481MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱33.2M | 100% | High risk76 | —-0.029 |
| 21FJ0017OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, APP - REHAB/RECONSTRUCTION OF NATIONAL ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MASBATE-CATAINGAN-PLACER RD - K0072+984 - K0073+498 | Region V | Masbate 3rd DEO | Completed | ₱33.3M | 100% | High risk74 | —-0.033 |
| 17D00039MFO-1 NATIONAL ROAD NETWROK SERVICES CONST. & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS REPLACEMENT OF PERMANENT WEAK BRIDGES PRINCESA BR. (B02425LZ) ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD, QUEZON | Region IV-A | Region IV-A | Completed | ₱86.8M | 100% | High risk74 | —-0.009 |
| 17G00058CONST. OF CONCRETE ROAD - BRGY. SAN ANTONIO - CONDEZ - SAN LUIS - SAN VICENTE - FLORES ROAD LEADING | Region VI | Region VI | Completed | ₱134.8M | 100% | High risk73 | —-0.010 |
| 18J00012CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS, LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE) UPPER LA PAZ, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱118M | 100% | High risk73 | —-0.049 |
| 20F00021LOCAL PROGRAM: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS, CONSTRUCTION OF ROAD WITH SEAWALL, BARANGAY TABA-TABA TO BARANGAY MANGCAMAGONG, BASUD, CAMARINES NORTE, B | Region V | Region V | Completed | ₱144.8M | 100% | High risk72 | —-0.043 |
| 24GG0195CONSTRUCTION OF MULTI - PURPOSE FACILITY, BRGY. BADIANG, ANILAO, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱12.8M | 100% | High risk70 | —-0.058 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19G00109BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SEGMENT 3, INCLUDING ROW, BACOLOD CITY | Region VI | Region VI | On-Going | ₱85.3M | 14% | Medium risk56 | Flagged0.067 |
| 22G00062BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SEGMENT 3, BACOLOD CITY | Region VI | Region VI | On-Going | ₱69.4M | 50% | Medium risk53 | Flagged0.022 |
| 25GN0064CONSTRUCTION OF ROAD AT BARANGAY GUINTORILAN, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.9M | 36% | High risk94 | Flagged0.022 |
| 25RE0012CONSTRUCTION OF ROAD OF BARANGAY CRUZ PASSING THRU BARANGAY MACASILAO, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱9.9M | 52% | High risk79 | Flagged0.018 |
| 25GL0102CONSTRUCTION OF MUNICIPAL HALL - ANNEX BUILDING, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱9.9M | 70% | High risk93 | Flagged0.013 |
| 25RD0095CONSTRUCTION OF ROADS (SITIO LIBOT LIBOT BRGY. PANDAN UP TO BRGY. PROPER), PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.8M | 78% | High risk93 | Flagged0.011 |
| 23G00044BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 1, SEGMENT 3, PHASE 4, TALISAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱67.7M | 62% | Medium risk53 | Flagged0.010 |
| 23G00055BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, BACOLOD CITY | Region VI | Region VI | On-Going | ₱104.8M | 17% | High risk64 | Flagged0.007 |
| 21G00051CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG ILOG - HILABANGAN RIVER, KABANKALAN CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱91.7M | 93% | Medium risk56 | Flagged0.005 |
| 18IB0193CONSTRUCTION OF VILLAHERMOSA BRIDGE, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱25.5M | 100% | Medium risk48 | Flagged0.005 |
| 18IB0191CONSTRUCTION OF HINOLASO BRIDGE II, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱22.5M | 100% | Medium risk48 | Flagged0.002 |
| 18IB0192CONSTRUCTION OF HINOLASO BRIDGE I, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱17.6M | 100% | Medium risk48 | Flagged0.001 |
| 16GB0215CONSTRUCTION OF 4 STOREY TWENTY FOUR(24) CLASSROOM SCHOOL BUILDING AT ANTIQUE NS, SAN JOSE(CAPITAL), | Region VI | Antique DEO | Completed | ₱34.7M | 100% | Medium risk50 | Flagged0.001 |
| 16GB0216CONSTRUCTION OF 4 STOREY TWENTY(20) CLASSROOM SCHOOL BUILDING AT ANTIQUE NS, SAN JOSE(CAPITAL), ANTI | Region VI | Antique DEO | Completed | ₱30.2M | 100% | Medium risk50 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 326 | 25DB0021ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES - CAWONG BR. (B00002LZ) ALONG PALICO-BALAYAN-BATANGAS RD | Region IV-A | Batangas 1st DEO | On-Going | ₱14M | 17% | Medium risk47 | —-0.015 |
| 327 | 21IL0090BRIDGE - WIDENING OF PERMANENT BRIDGES IBARRA BR. (B00299LT) ALONG BDRY. SOUTHERN LEYTE-MAASIN-MACROHON-SOGOD-JCT. DAANG MAHARLIKA, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱11.8M | 100% | Medium risk47 | —-0.047 |
| 328 | 21IL0124BRIDGE - WIDENING OF PERMANENT BRIDGES TUBURAN BRIDGE (B00297LT) ALONG BDRY SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT DAANG MAHARLIKA, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱11.8M | 100% | Medium risk47 | —-0.051 |
| 329 | 22DB0010ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- SECONDARY ROADS- PALICO-BALAYAN-BATANGAS RD - SECONDARY ROADS - K0117 + 620.50-K0118+603, K0118+618.50-K0119+160 | Region IV-A | Batangas 1st DEO | Completed | ₱41.1M | 100% | Medium risk47 | —-0.103 |
| 330 | 21IF0016ROAD WIDENING - PALOMPON-ISABEL-MERIDA-ORMOC RD K1103+004 - K1103+504 | Region VIII | Leyte 4th DEO | Completed | ₱14M | 100% | Medium risk47 | —-0.095 |
| 331 | 21DB0008NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS - NASUGBU-LIAN-CALATAGAN RD-K0119+000-K0119+492 | Region IV-A | Batangas 1st DEO | Completed | ₱29.1M | 100% | Medium risk47 | —-0.104 |
| 332 | 18IL0078LOCAL ROADS AND BRIDGES-LOCAL ROADS-LOCAL INFRASTRUCTURE PROGRAM/CONCRETING OF BRGY. ROAD, BATUAN-SAN ISIDRO, MAASIN CITY, SOUTHERN LEYTE (CONSTRUCTION OF CONCRETE ROAD) | Region VIII | Southern Leyte 1st DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.094 |
| 333 | 19IL0071LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS, CONSTRUCTION OF MATIN-AO - CANSIRONG ROAD, BRGYS. MATIN-AO AND CANSIRONG, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱9.9M | 100% | Medium risk47 | —-0.094 |
| 334 | 24DB0014ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES-MATINGAIN BR. (B00048LZ) ALONG PALICO-BALAYAN-BATANGAS RD | Region IV-A | Batangas 1st DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.066 |
| 335 | 18FC0074FLOOD MANAGEMENT PROGRAM, CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONST. | Region V | Camarines Norte DEO | Completed | ₱19M | 100% | Medium risk47 | —-0.086 |
| 336 | 18HM0029CONSTRUCTION/IMPROVEMENT OF TAMBISAN ROAD LEADING TO TAMBISAN WHARF, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱12.7M | 100% | Medium risk47 | —-0.090 |
| 337 | 20DN0098REHABILITATION/UPGRADING OF DRAINAGE SYSTEM, RAINBOW VILLAGE (PHASE 2), BRGY. KALAYAAN, ANGONO, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱24M | 100% | Medium risk47 | —-0.088 |
| 338 | 25DB0022ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES - CALAUANG BR. (B00009LZ) ALONG PALICO-BALAYAN-BATANGAS RD | Region IV-A | Batangas 1st DEO | On-Going | ₱12.9M | 0% | Medium risk47 | —-0.010 |
| 339 | 24DB0013ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES-COLONG COLONG BR. (B00005LZ) ALONG PALICO-BALAYAN-BATANGAS RD | Region IV-A | Batangas 1st DEO | Completed | ₱10.8M | 100% | Medium risk47 | —-0.068 |
| 340 | 24DB0016ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES-SINISIAN BR. (B00012LZ) ALONG PALICO-BALAYAN-BATANGAS RD | Region IV-A | Batangas 1st DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.068 |
| 341 | 20DB0024BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES, CUACO BR. (B03178LZ) ALONG NASUGBU-LIAN-CALATAGAN RD | Region IV-A | Batangas 1st DEO | Completed | ₱14.3M | 100% | Medium risk47 | —-0.066 |
| 342 | 24DB0012ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES-BALIBAGO BR. (B03180LZ) ALONG NASUGBU-LIAN-CALATAGAN RD | Region IV-A | Batangas 1st DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.064 |
| 343 | 23DB0013ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - CALACA BR. (B00044LZ) ALONG PALICO-BALAYAN-BATANGAS RD | Region IV-A | Batangas 1st DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.069 |
| 344 | 21DN0053OO1 - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS ANGONO DIVERSION ROAD, K0027+000 - K0027+387, ANGONO, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱23.9M | 100% | Medium risk47 | —-0.104 |
| 345 | 21DN0045IMPROVEMENT/WIDENING OF CIRCUMFERENTIAL ROAD (PRITIL) BINANGONAN, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱20.5M | 100% | Medium risk47 | —-0.108 |
| 346 | 24DB0015ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM -REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES-OBISPO BR. (B00036LZ) ALONG PALICO-BALAYAN-BATANGAS RD | Region IV-A | Batangas 1st DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.067 |
| 347 | 20DB0025BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES- MATALA BR. (B03179LZ) ALONG NASUGBU-LIAN-CALATAGAN RD, LIAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱11.9M | 100% | Medium risk47 | —-0.069 |
| 348 | 21GK0202CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING (NEW CITY LIBRARY) AT BARANGAY ZONE 3, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱9.9M | 100% | Medium risk47 | —-0.081 |
| 349 | 18IL0048CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS/CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, SAN VICENTE SECTION 2, STA. 9+900- 10+066, SOGOD, SOUTHERN LEYTE (CONSTRUCTION OF FLOOD MITIGATION STRUCTURE), SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.075 |
| 350 | 18IL0046CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS/CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, SAN JUAN SECTION 2, STA. 10+850-STA. 10+922, SOGOD, SOUTHERN LEYTE (CONSTRUCTION OF FLOOD MITIGATION STRUCTURE), SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱5.2M | 100% | Medium risk47 | —-0.076 |