Contractor dossier
591 projects on file, including joint ventures this contractor is part of.
Total projects
591
Total budget
₱19.7B
Average progress
96.8%
Completion rate
91.5%
Average risk score
46.5
Medium risk on average, out of 100
Flagged as unusual
14
2.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 286 | ₱7.2B | 41.4 | 3 | 100.0% |
| Negros Island Region | 99 | ₱3B | 48.8 | 4 | 91.4% |
| Region V | 68 | ₱3.4B | 55.8 | 0 | 99.6% |
| Region IV-A | 34 | ₱1B | 50.0 | 0 | 87.0% |
| Region VI | 30 | ₱1.7B | 54.6 | 7 | 82.7% |
| Region X | 27 | ₱1.7B | 48.5 | 0 | 99.2% |
| Region IX | 25 | ₱955.5M | 56.6 | 0 | 100.0% |
| Region IV-B | 13 | ₱466.9M | 39.6 | 0 | 100.0% |
| Region VII | 6 | ₱120.4M | 47.2 | 0 | 100.0% |
| National Capital Region | 3 | ₱79.4M | 46.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 212 | ₱8.8B | 49.5 | 1 | 96.4% |
| Buildings and Facilities | 117 | ₱2.1B | 35.0 | 2 | 97.6% |
| Bridges | 112 | ₱3.2B | 47.6 | 5 | 95.3% |
| Flood Control and Drainage | 111 | ₱4.4B | 49.3 | 1 | 99.6% |
| Water Provision and Storage | 17 | ₱64.8M | 23.1 | 0 | 100.0% |
| OTHER | 12 | ₱531.4M | 76.7 | 0 | 100.0% |
| Bridges, Roads | 5 | ₱510.1M | 61.5 | 1 | 83.4% |
| GAA 2025 SSP | 4 | ₱39.4M | 89.8 | 4 | 59.1% |
| GAA 2025 OO-1 | 1 | ₱22.1M | 86.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GN0064CONSTRUCTION OF ROAD AT BARANGAY GUINTORILAN, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.9M | 36% | High risk94 | Flagged0.022 |
| 25GL0102CONSTRUCTION OF MUNICIPAL HALL - ANNEX BUILDING, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱9.9M | 70% | High risk93 | Flagged0.013 |
| 25RD0095CONSTRUCTION OF ROADS (SITIO LIBOT LIBOT BRGY. PANDAN UP TO BRGY. PROPER), PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.8M | 78% | High risk93 | Flagged0.011 |
| 25GQ0016REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD. - K0049+092 - K0049+157 | Negros Island Region | Negros Occidental 5th DEO | Completed | ₱22.1M | 100% | High risk86 | —-0.030 |
| 20IB0083CONSTRUCTION OF MISSING LINKS/NEW ROADS ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD, JIPAPAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱96.9M | 100% | High risk83 | —-0.023 |
| 20IF0011WIDENING OF PERMANENT BRIDGES, BACAN BR. (B00582LT) ALONG ORMOC-BAYBAY SOUTHERN LEYTE BDRY. ROAD | Region VIII | Leyte 4th DEO | Completed | ₱69.6M | 100% | High risk81 | —-0.035 |
| 17IL0071MAASIN CITY BYPASS ROAD CUM SEA WALL, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱49M | 100% | High risk80 | —-0.036 |
| 25RE0012CONSTRUCTION OF ROAD OF BARANGAY CRUZ PASSING THRU BARANGAY MACASILAO, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱9.9M | 52% | High risk79 | Flagged0.018 |
| 17FG0038INDV. PROJECT PAVING OF SHOULDERS WITH DRAINAGE IMPROVEMENT ALONG NABUA BALATAN ROAD, NABUA BALATAN, CAMARINES SUR K0 477+177 - K0477+440, K0483+000 - 483+591, K0 488+649 - K0 488+801, K0489+590 - K0489+800, K0491+332 - K0 491+622, K0 492+450 - KO 493+000 | Region V | Camarines Sur 5th DEO | Completed | ₱48.2M | 100% | High risk78 | —-0.037 |
| 17IC0024IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG DAANG MAHARLIKA (LT) (S00024LT) K0930+123 - K 0930+816, K0930+824 - K0930+911, K0930+921 - K0931+509, TELEGRAFO, TOLOSA, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱38.4M | 100% | High risk77 | —-0.038 |
| 19IF0098CONSTRUCTION OF MULTI-PURPOSE (MUNICIPAL) BUILDING, PHASE I, MATAG-OB, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱8.9M | 100% | High risk77 | —-0.038 |
| 17FG0039INDV. PROJ. REHAB./RECONST./UPGRADING DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE ALONG IRIGA CITY-SAN ISIDRO-SAGRADA-SAN RAMON-HANAWAN ROAD, IRIGA CITY K0 484+(-031.40)-K0 484+455, K0 485+(-020.80)-K0 485+108.80, K0 486+333-K0 487+000 | Region V | Camarines Sur 5th DEO | Completed | ₱18.6M | 100% | High risk76 | —-0.036 |
| 17FG0044INDV. PROJ. - CONCRETING OF MONTE-CALVARIO-IGBAC BARANGAY ROAD, MONTE-CALVARIO AND IGBAC, BUHI, CAMARINES SUR STA. 00+000-STA. 00+105, STA. 00+165-STA. 00+298, STA. 00+379-STA. 00+733 | Region V | Camarines Sur 5th DEO | Completed | ₱9.4M | 100% | High risk76 | —-0.035 |
| 18JI0054RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES AT SAN JOSE BR. (B00481MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱33.2M | 100% | High risk76 | —-0.029 |
| 21FJ0017OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, APP - REHAB/RECONSTRUCTION OF NATIONAL ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MASBATE-CATAINGAN-PLACER RD - K0072+984 - K0073+498 | Region V | Masbate 3rd DEO | Completed | ₱33.3M | 100% | High risk74 | —-0.033 |
| 17D00039MFO-1 NATIONAL ROAD NETWROK SERVICES CONST. & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS REPLACEMENT OF PERMANENT WEAK BRIDGES PRINCESA BR. (B02425LZ) ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD, QUEZON | Region IV-A | Region IV-A | Completed | ₱86.8M | 100% | High risk74 | —-0.009 |
| 17G00058CONST. OF CONCRETE ROAD - BRGY. SAN ANTONIO - CONDEZ - SAN LUIS - SAN VICENTE - FLORES ROAD LEADING | Region VI | Region VI | Completed | ₱134.8M | 100% | High risk73 | —-0.010 |
| 18J00012CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS, LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE) UPPER LA PAZ, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱118M | 100% | High risk73 | —-0.049 |
| 20F00021LOCAL PROGRAM: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS, CONSTRUCTION OF ROAD WITH SEAWALL, BARANGAY TABA-TABA TO BARANGAY MANGCAMAGONG, BASUD, CAMARINES NORTE, B | Region V | Region V | Completed | ₱144.8M | 100% | High risk72 | —-0.043 |
| 24GG0195CONSTRUCTION OF MULTI - PURPOSE FACILITY, BRGY. BADIANG, ANILAO, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱12.8M | 100% | High risk70 | —-0.058 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19G00109BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SEGMENT 3, INCLUDING ROW, BACOLOD CITY | Region VI | Region VI | On-Going | ₱85.3M | 14% | Medium risk56 | Flagged0.067 |
| 22G00062BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SEGMENT 3, BACOLOD CITY | Region VI | Region VI | On-Going | ₱69.4M | 50% | Medium risk53 | Flagged0.022 |
| 25GN0064CONSTRUCTION OF ROAD AT BARANGAY GUINTORILAN, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.9M | 36% | High risk94 | Flagged0.022 |
| 25RE0012CONSTRUCTION OF ROAD OF BARANGAY CRUZ PASSING THRU BARANGAY MACASILAO, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱9.9M | 52% | High risk79 | Flagged0.018 |
| 25GL0102CONSTRUCTION OF MUNICIPAL HALL - ANNEX BUILDING, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱9.9M | 70% | High risk93 | Flagged0.013 |
| 25RD0095CONSTRUCTION OF ROADS (SITIO LIBOT LIBOT BRGY. PANDAN UP TO BRGY. PROPER), PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.8M | 78% | High risk93 | Flagged0.011 |
| 23G00044BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 1, SEGMENT 3, PHASE 4, TALISAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱67.7M | 62% | Medium risk53 | Flagged0.010 |
| 23G00055BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, BACOLOD CITY | Region VI | Region VI | On-Going | ₱104.8M | 17% | High risk64 | Flagged0.007 |
| 21G00051CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG ILOG - HILABANGAN RIVER, KABANKALAN CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱91.7M | 93% | Medium risk56 | Flagged0.005 |
| 18IB0193CONSTRUCTION OF VILLAHERMOSA BRIDGE, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱25.5M | 100% | Medium risk48 | Flagged0.005 |
| 18IB0191CONSTRUCTION OF HINOLASO BRIDGE II, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱22.5M | 100% | Medium risk48 | Flagged0.002 |
| 18IB0192CONSTRUCTION OF HINOLASO BRIDGE I, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱17.6M | 100% | Medium risk48 | Flagged0.001 |
| 16GB0215CONSTRUCTION OF 4 STOREY TWENTY FOUR(24) CLASSROOM SCHOOL BUILDING AT ANTIQUE NS, SAN JOSE(CAPITAL), | Region VI | Antique DEO | Completed | ₱34.7M | 100% | Medium risk50 | Flagged0.001 |
| 16GB0216CONSTRUCTION OF 4 STOREY TWENTY(20) CLASSROOM SCHOOL BUILDING AT ANTIQUE NS, SAN JOSE(CAPITAL), ANTI | Region VI | Antique DEO | Completed | ₱30.2M | 100% | Medium risk50 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 21F00045OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CLUSTER V-I-REHABILITATION/IMPROVEMENT OF REVETMENT ALONG BARANGAY BAGACAY-PACO SECTION, BOTH SIDE | Region V | Region V | On-Going | ₱130.4M | 99% | High risk68 | —-0.016 |
| 27 | 20F00076OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TAGKAWAYAN-LABO DIVERSION ROAD,(LABO SECTION), CAMARINES NORTE, LABO, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱120.4M | 100% | High risk67 | —-0.045 |
| 28 | 24GJ0096CONSTRUCTION OF ROAD (BESIDE MORAGE GARAGE - CUBAY-BALABAGO ROAD), BARANGAY CUBAY, JARO, ILOILO | Region VI | Iloilo City DEO | On-Going | ₱14.8M | 0% | High risk67 | —-0.003 |
| 29 | 25RD0093CONSTRUCTION OF ROAD, RELOCATION SITE, BATUAN PROPER, LA CARLOTA CITY (II), LA CARLOTA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱4.9M | 100% | High risk67 | —-0.043 |
| 30 | 25RD0094CONSTRUCTION OF ROAD, DULOM RELOCATION SITE, BARANGAY ARA-AL, LA CARLOTA (II), LA CARLOTA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱4.9M | 100% | High risk67 | —-0.041 |
| 31 | 18GP0023CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO TUWANG-TUWANGON FALLS, BRGY. DURAN, DUMALAG, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱18.8M | 100% | High risk66 | —-0.053 |
| 32 | 19FK0019NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SORSOGON CITY COASTAL BY-PASS ROAD, PACKAGE 5, SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱93.7M | 100% | High risk66 | —-0.080 |
| 33 | 17F00046CONSTRUCTION OF TWO EVACUATION CENTERS, BRGY TUGHAN, JUBAN, SORSOGON & VIRAC, CATANDUANES | Region V | Region V | Completed | ₱96.7M | 100% | High risk66 | —-0.045 |
| 34 | 16HM0058REHABILITATION /RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) AT TERTIARY ROADS, LUYANG-POO-LAZI RD-K0007+834 - K0009+640 | Negros Island Region | Siquijor DEO | Completed | ₱45.3M | 100% | High risk66 | —-0.054 |
| 35 | 16HM0063REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) SIQUIJOR CIRCUMFERENTIAL ROAD - K0022+859 - K0023+000, K0043+626 - K0044+394, K0044 | Negros Island Region | Siquijor DEO | Completed | ₱38.1M | 100% | High risk66 | —-0.054 |
| 36 | 17J00006ROAD WIDENING INCLUDING DRAINAGE AND RROW OF DIPOLOG OROQUIETA NATIONAL ROAD, ZAMBOANGA DEL NORTE 1ST DEO, K1844+220.00 K1846+266.00, K1846+321.00 K1846+418.00 (NET LENGTH: 2,143.00 LN.M.) | Region IX | Region IX | Completed | ₱62.4M | 100% | High risk66 | —-0.054 |
| 37 | 17FI0031REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG MASBA | Region V | Masbate 2nd DEO | Completed | ₱37.6M | 100% | High risk66 | —-0.057 |
| 38 | 25RD0096CONSTRUCTION OF ROAD, MAGSAYSAY ST. ZARANDIN ST., AND PRESBITERO ST., VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.9M | 79% | High risk66 | —-0.034 |
| 39 | 20FI0032NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINK/NEW ROADS - MALUBI - CABANGCALAN - DAYHAGAN - TINIGBAN - MATABA - ROAD, STA. 2+552 - STA. 3+837, AROROY, MASBATE | Region V | Masbate 2nd DEO | Completed | ₱96.4M | 100% | High risk66 | —-0.087 |
| 40 | 17HM0002CONSTRUCTION OF FLOOD CONTROL STRUCTURE/SHORE PROTECTION AT SIQUIJOR, SIQUIJOR LONE DISTRICT | Negros Island Region | Siquijor DEO | Completed | ₱41.8M | 100% | High risk65 | —-0.041 |
| 41 | 17HM0004CONSTRUCTION OF FLOOD CONTROL STRUCTURE/SHORE PROTECTION AT HELEN, LARENA, SIQUIJOR LONE DISTRICT | Negros Island Region | Siquijor DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.040 |
| 42 | 17J00062ROAD UPGRADING (UNPAVED TO PAVED) OF ZAMBOANGA DEL SUR COASTAL ROAD, ZAMBOANGA DEL SUR 2ND DEO, CHAINAGE 14610 - CHAINAGE 16160, CHAINAGE 22024 - CHAINAGE 23508.16, NET LENGTH: 3,034.16 LN.M. | Region IX | Region IX | Completed | ₱85M | 100% | High risk65 | —-0.044 |
| 43 | 21FC0111CONSTRUCTION OF ROAD WITH SEAWALL, BARANGAY CAYUCYUCAN, MERCEDES CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱94.4M | 100% | High risk65 | —-0.089 |
| 44 | 18IF0071ROAD WIDENING, PALO-CARIGARA-ORMOC ROAD K0984+(-725)-K0984+000; K984+727-K984+875; K984+890-K0986+448; K0986+448-K0987+483; K0987+554-K0988+013; K0990+725-K0990+1098; K0990+1109.11-K0992+633; K0992+642-K0993+178; K0994+030-K0994+317, K1000+126-K1000+654 | Region VIII | Leyte 4th DEO | Completed | ₱193M | 100% | High risk65 | —-0.064 |
| 45 | 18FK0098CLUSTER XI-CONSTRUCTION OF CY-2018 BASIC EDUCATIONAL FACILITIES FUND (BEFF), BATCH I, CASTILLA, SORSOGON | Region V | Sorsogon DEO | Completed | ₱97.4M | 100% | High risk64 | —-0.028 |
| 46 | 21G00043CONSTRUCTION OF BRIDGE, BARANGAY TALABAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱183.4M | 100% | High risk64 | —-0.002 |
| 47 | 17FI0012OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG M.R. ESPINOSA AIRPORT ROAD, MASBATE CITY | Region V | Masbate 2nd DEO | Completed | ₱9.2M | 100% | High risk64 | —-0.065 |
| 48 | 18IC0032CONVERGENCE & SPCL. SUPPORT PROG. - CONST./IMPROV. OF ACCESS RDS. LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES, DIVISORIA-LANGIT-SAN ANTONIO FARM-SAN DIEGO-STO. NIÑO RD., INCL. BRIDGE CONNECTING TO TIGBAO-STA. FE-SAN MIGUEL RD. & PALO-CARIGARA-ORMOC RD | Region VIII | Leyte 1st DEO | Completed | ₱121M | 100% | High risk64 | —-0.068 |
| 49 | 18FK0054CONSTRUCTION OF BUREAU OF JAIL MANAGEMENT AND PENOLOGY (FIRST PHASE), SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱96.9M | 100% | High risk64 | —-0.078 |
| 50 | 17FI0057CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-NA | Region V | Masbate 2nd DEO | Completed | ₱50.5M | 100% | High risk64 | —-0.002 |