Contractor dossier
591 projects on file, including joint ventures this contractor is part of.
Total projects
591
Total budget
₱19.7B
Average progress
96.8%
Completion rate
91.5%
Average risk score
46.5
Medium risk on average, out of 100
Flagged as unusual
14
2.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 286 | ₱7.2B | 41.4 | 3 | 100.0% |
| Negros Island Region | 99 | ₱3B | 48.8 | 4 | 91.4% |
| Region V | 68 | ₱3.4B | 55.8 | 0 | 99.6% |
| Region IV-A | 34 | ₱1B | 50.0 | 0 | 87.0% |
| Region VI | 30 | ₱1.7B | 54.6 | 7 | 82.7% |
| Region X | 27 | ₱1.7B | 48.5 | 0 | 99.2% |
| Region IX | 25 | ₱955.5M | 56.6 | 0 | 100.0% |
| Region IV-B | 13 | ₱466.9M | 39.6 | 0 | 100.0% |
| Region VII | 6 | ₱120.4M | 47.2 | 0 | 100.0% |
| National Capital Region | 3 | ₱79.4M | 46.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 212 | ₱8.8B | 49.5 | 1 | 96.4% |
| Buildings and Facilities | 117 | ₱2.1B | 35.0 | 2 | 97.6% |
| Bridges | 112 | ₱3.2B | 47.6 | 5 | 95.3% |
| Flood Control and Drainage | 111 | ₱4.4B | 49.3 | 1 | 99.6% |
| Water Provision and Storage | 17 | ₱64.8M | 23.1 | 0 | 100.0% |
| OTHER | 12 | ₱531.4M | 76.7 | 0 | 100.0% |
| Bridges, Roads | 5 | ₱510.1M | 61.5 | 1 | 83.4% |
| GAA 2025 SSP | 4 | ₱39.4M | 89.8 | 4 | 59.1% |
| GAA 2025 OO-1 | 1 | ₱22.1M | 86.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GN0064CONSTRUCTION OF ROAD AT BARANGAY GUINTORILAN, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.9M | 36% | High risk94 | Flagged0.022 |
| 25GL0102CONSTRUCTION OF MUNICIPAL HALL - ANNEX BUILDING, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱9.9M | 70% | High risk93 | Flagged0.013 |
| 25RD0095CONSTRUCTION OF ROADS (SITIO LIBOT LIBOT BRGY. PANDAN UP TO BRGY. PROPER), PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.8M | 78% | High risk93 | Flagged0.011 |
| 25GQ0016REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD. - K0049+092 - K0049+157 | Negros Island Region | Negros Occidental 5th DEO | Completed | ₱22.1M | 100% | High risk86 | —-0.030 |
| 20IB0083CONSTRUCTION OF MISSING LINKS/NEW ROADS ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD, JIPAPAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱96.9M | 100% | High risk83 | —-0.023 |
| 20IF0011WIDENING OF PERMANENT BRIDGES, BACAN BR. (B00582LT) ALONG ORMOC-BAYBAY SOUTHERN LEYTE BDRY. ROAD | Region VIII | Leyte 4th DEO | Completed | ₱69.6M | 100% | High risk81 | —-0.035 |
| 17IL0071MAASIN CITY BYPASS ROAD CUM SEA WALL, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱49M | 100% | High risk80 | —-0.036 |
| 25RE0012CONSTRUCTION OF ROAD OF BARANGAY CRUZ PASSING THRU BARANGAY MACASILAO, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱9.9M | 52% | High risk79 | Flagged0.018 |
| 17FG0038INDV. PROJECT PAVING OF SHOULDERS WITH DRAINAGE IMPROVEMENT ALONG NABUA BALATAN ROAD, NABUA BALATAN, CAMARINES SUR K0 477+177 - K0477+440, K0483+000 - 483+591, K0 488+649 - K0 488+801, K0489+590 - K0489+800, K0491+332 - K0 491+622, K0 492+450 - KO 493+000 | Region V | Camarines Sur 5th DEO | Completed | ₱48.2M | 100% | High risk78 | —-0.037 |
| 17IC0024IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG DAANG MAHARLIKA (LT) (S00024LT) K0930+123 - K 0930+816, K0930+824 - K0930+911, K0930+921 - K0931+509, TELEGRAFO, TOLOSA, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱38.4M | 100% | High risk77 | —-0.038 |
| 19IF0098CONSTRUCTION OF MULTI-PURPOSE (MUNICIPAL) BUILDING, PHASE I, MATAG-OB, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱8.9M | 100% | High risk77 | —-0.038 |
| 17FG0039INDV. PROJ. REHAB./RECONST./UPGRADING DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE ALONG IRIGA CITY-SAN ISIDRO-SAGRADA-SAN RAMON-HANAWAN ROAD, IRIGA CITY K0 484+(-031.40)-K0 484+455, K0 485+(-020.80)-K0 485+108.80, K0 486+333-K0 487+000 | Region V | Camarines Sur 5th DEO | Completed | ₱18.6M | 100% | High risk76 | —-0.036 |
| 17FG0044INDV. PROJ. - CONCRETING OF MONTE-CALVARIO-IGBAC BARANGAY ROAD, MONTE-CALVARIO AND IGBAC, BUHI, CAMARINES SUR STA. 00+000-STA. 00+105, STA. 00+165-STA. 00+298, STA. 00+379-STA. 00+733 | Region V | Camarines Sur 5th DEO | Completed | ₱9.4M | 100% | High risk76 | —-0.035 |
| 18JI0054RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES AT SAN JOSE BR. (B00481MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱33.2M | 100% | High risk76 | —-0.029 |
| 21FJ0017OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, APP - REHAB/RECONSTRUCTION OF NATIONAL ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MASBATE-CATAINGAN-PLACER RD - K0072+984 - K0073+498 | Region V | Masbate 3rd DEO | Completed | ₱33.3M | 100% | High risk74 | —-0.033 |
| 17D00039MFO-1 NATIONAL ROAD NETWROK SERVICES CONST. & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS REPLACEMENT OF PERMANENT WEAK BRIDGES PRINCESA BR. (B02425LZ) ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD, QUEZON | Region IV-A | Region IV-A | Completed | ₱86.8M | 100% | High risk74 | —-0.009 |
| 17G00058CONST. OF CONCRETE ROAD - BRGY. SAN ANTONIO - CONDEZ - SAN LUIS - SAN VICENTE - FLORES ROAD LEADING | Region VI | Region VI | Completed | ₱134.8M | 100% | High risk73 | —-0.010 |
| 18J00012CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS, LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE) UPPER LA PAZ, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱118M | 100% | High risk73 | —-0.049 |
| 20F00021LOCAL PROGRAM: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS, CONSTRUCTION OF ROAD WITH SEAWALL, BARANGAY TABA-TABA TO BARANGAY MANGCAMAGONG, BASUD, CAMARINES NORTE, B | Region V | Region V | Completed | ₱144.8M | 100% | High risk72 | —-0.043 |
| 24GG0195CONSTRUCTION OF MULTI - PURPOSE FACILITY, BRGY. BADIANG, ANILAO, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱12.8M | 100% | High risk70 | —-0.058 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19G00109BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SEGMENT 3, INCLUDING ROW, BACOLOD CITY | Region VI | Region VI | On-Going | ₱85.3M | 14% | Medium risk56 | Flagged0.067 |
| 22G00062BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SEGMENT 3, BACOLOD CITY | Region VI | Region VI | On-Going | ₱69.4M | 50% | Medium risk53 | Flagged0.022 |
| 25GN0064CONSTRUCTION OF ROAD AT BARANGAY GUINTORILAN, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.9M | 36% | High risk94 | Flagged0.022 |
| 25RE0012CONSTRUCTION OF ROAD OF BARANGAY CRUZ PASSING THRU BARANGAY MACASILAO, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱9.9M | 52% | High risk79 | Flagged0.018 |
| 25GL0102CONSTRUCTION OF MUNICIPAL HALL - ANNEX BUILDING, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱9.9M | 70% | High risk93 | Flagged0.013 |
| 25RD0095CONSTRUCTION OF ROADS (SITIO LIBOT LIBOT BRGY. PANDAN UP TO BRGY. PROPER), PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.8M | 78% | High risk93 | Flagged0.011 |
| 23G00044BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 1, SEGMENT 3, PHASE 4, TALISAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱67.7M | 62% | Medium risk53 | Flagged0.010 |
| 23G00055BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, BACOLOD CITY | Region VI | Region VI | On-Going | ₱104.8M | 17% | High risk64 | Flagged0.007 |
| 21G00051CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG ILOG - HILABANGAN RIVER, KABANKALAN CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱91.7M | 93% | Medium risk56 | Flagged0.005 |
| 18IB0193CONSTRUCTION OF VILLAHERMOSA BRIDGE, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱25.5M | 100% | Medium risk48 | Flagged0.005 |
| 18IB0191CONSTRUCTION OF HINOLASO BRIDGE II, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱22.5M | 100% | Medium risk48 | Flagged0.002 |
| 18IB0192CONSTRUCTION OF HINOLASO BRIDGE I, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱17.6M | 100% | Medium risk48 | Flagged0.001 |
| 16GB0215CONSTRUCTION OF 4 STOREY TWENTY FOUR(24) CLASSROOM SCHOOL BUILDING AT ANTIQUE NS, SAN JOSE(CAPITAL), | Region VI | Antique DEO | Completed | ₱34.7M | 100% | Medium risk50 | Flagged0.001 |
| 16GB0216CONSTRUCTION OF 4 STOREY TWENTY(20) CLASSROOM SCHOOL BUILDING AT ANTIQUE NS, SAN JOSE(CAPITAL), ANTI | Region VI | Antique DEO | Completed | ₱30.2M | 100% | Medium risk50 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 476 | 18EF0075CONST. OF NEW PERMANENT BRIDGES, TAGBUNG SAING BR. ALONG ARAMAYWAN-BERONG-PTO. PRINCESA ROAD, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱41.1M | 100% | Medium risk41 | —-0.032 |
| 477 | 23KD0061CONSTRUCTION OF MULTI PURPOSE BUILDING IN BARANGAY CUGMAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱23.4M | 100% | Medium risk41 | —-0.037 |
| 478 | 18EF0088REPLACEMENT OF SUMBILING BRIDGE (B00301PW) ALONG PALAWAN CIRCUMFERENTIAL ROAD, BATARAZA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱42.2M | 100% | Medium risk40 | —-0.015 |
| 479 | 18IF0112CONCRETING OF BRGY. SABANG, SITIO TABUNOK-BRGY. HIMARCO FMR, BRGY. SABANG AND BRGY. HIMARCO, PALOMPON, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱4.8M | 100% | Medium risk40 | —-0.043 |
| 480 | 18EF0086WIDENING OF PANACAN BRIDGE (BOOO31PW) ALONG PUERTO PRINCESA SOUTH ROAD, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱27.7M | 100% | Medium risk40 | —-0.035 |
| 481 | 17IB0095CONSTRUCTION/REHABILITATION OF SEVENTEEN UNITS WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTOR, ALL AT EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱3.1M | 100% | Medium risk39 | —-0.033 |
| 482 | 18FI0129CONSTRUCTION OF 1-UNIT 2-STOREY 2-ICT BUILDING (9.50M X 23.00M) AT FEDERICO A. ESTIPONA MEMORIAL HIGH SCHOOL, MANDAON, MASBATE | Region V | Masbate 2nd DEO | Completed | ₱9.4M | 100% | Medium risk39 | —-0.044 |
| 483 | 18EF0061CONST./IMPROVEMENT OF ACCESS ROAD LEADING TO ILOG-ILOG RIVER WATER TUBING, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱19.5M | 100% | Medium risk39 | —-0.069 |
| 484 | 22EH0071REPLACEMENT OF PERMANENT WEAK BRIDGES - OTOD BR. (B00033SY) ALONG SIBUYAN CIRCUMFERENTIAL RD, SIBUYAN ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱32.3M | 100% | Medium risk39 | —-0.047 |
| 485 | 18EE0106CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD TO MALAMPAYA SOUND, MT.. CAPUAS ANDSAN VICENTE LONG BEACH, STA. 0+000 - STA. 0+607.50SAN VICENTE AND TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱18.8M | 100% | Medium risk39 | —-0.074 |
| 486 | 18GO0137CONSTRUCTION OF TWO (2) STOREY-TWO(2) SCIENCE LABORATORY AT BACOLOD CITY NATIONAL HIGH SCHOOL, BRGY. TACULING, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱9.3M | 100% | Medium risk39 | —-0.049 |
| 487 | 18GO0133CONSTRUCTION OT TWO(2) STOREY- TWO(2) INFORMATION & COMMUNICATION TECHNOLOGY (ICT) AT BACOLOD CITY NATIONAL HIGH SCHOOL, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱9.4M | 100% | Medium risk39 | —-0.049 |
| 488 | 22EH0069CONSTRUCTION OF NEW PERMANENT BRIDGES - SAN ROQUE BR. ALONG TABLAS CIRCUMFERENTIAL RD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱24.5M | 100% | Medium risk38 | —-0.050 |
| 489 | 22EH0096CONSTRUCTION OF NEW PERMANENT BRIDGES - MABINI BR. ALONG SIBUYAN CIRCUMFERENTIAL RD, SIBUYAN ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱24.5M | 100% | Medium risk38 | —-0.049 |
| 490 | 17FC0379CONST. OF TWO (2) STOREY FOUR (4) C/L (SCIENCE & ICT LAB.) TABAS NHS, PARACALE CAMS. NORTE | Region V | Camarines Norte DEO | Completed | ₱21.2M | 100% | Medium risk38 | —-0.019 |
| 491 | 22EH0072CONSTRUCTION OF NEW PERMANENT BRIDGES - PAROYHOG BR. ALONG TABLAS CIRCUMFERENTIAL RD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱24.5M | 100% | Medium risk38 | —-0.046 |
| 492 | 17IL0164CONSTRUCTION OF 2STY/10CL SCHOOL BUILDING, SAN PABLO ELEMENTARY SCHOOL (SCH. ID#122046), SAN PABLO, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱22.5M | 100% | Medium risk38 | —-0.024 |
| 493 | 17IL0186CONSTRUCTION OF 2STY/8CL SCHOOL BUILDING, LUNGSODAAN NATIONAL HIGH SCHOOL-BLDG. 2 (SCH. ID#303466), HINUNDAYAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱18.9M | 100% | Medium risk36 | —-0.025 |
| 494 | 17FC0416CONST. OF THREE (3) STOREY THREE (3) REGULAR WORKSHOP, SCIENCE & ICT, SAN FRANCISCO NHS, TALISAY CAM | Region V | Camarines Norte DEO | Completed | ₱12.8M | 100% | Medium risk36 | —-0.024 |
| 495 | 18GM0139CONSTRUCTION OF 1 UNIT TWO (2) STOREY ICT LABORATORY BUILDING AT GUILJUNGAN NHS - ABACA EXT., CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.6M | 100% | Medium risk35 | —-0.045 |
| 496 | 19IF0087CONCRETING OF BRGY. SAN MIGUEL-CANTANDOY FMR, BRGY. SAN MIGUEL AND BRGY. CANTANDOY, PALOMPON, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱4.7M | 100% | Medium risk35 | —-0.042 |
| 497 | 19IF0090CONCRETING OF BRGY. MAHAYAG-BRGY. ANISLAG FMR, PHASE II, BRGY. MAHAYAG AND BRGY. ANISLAG, ISABEL, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱4.7M | 100% | Medium risk35 | —-0.045 |
| 498 | 18IL0104CONCRETING OF BRGY. MATIN-AO-BRGY. CANSIRUNG FMR, BRGY. MATIN-AO AND BRGY. CANSIRUNG, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱4.7M | 100% | Medium risk35 | —-0.041 |
| 499 | 16HM0043CONSTRUCTION OF 4-UNITS 2-STOREY 4-CLASSROOM SCHOOL BUILDING AT CAMPALANAS NATIONAL HIGH SCHOOL, LAZI, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱26.8M | 100% | Medium risk34 | —-0.011 |
| 500 | 16HM0042CONSTRUCTION OF 1-UNIT 2-STOREY 4-CLASSROOM SCHOOL BUILDING AT BASAC NATIONAL HIGH SCHOOL, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱6.5M | 100% | Medium risk32 | —-0.008 |