Contractor dossier
591 projects on file, including joint ventures this contractor is part of.
Total projects
591
Total budget
₱19.7B
Average progress
96.8%
Completion rate
91.5%
Average risk score
46.5
Medium risk on average, out of 100
Flagged as unusual
14
2.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 286 | ₱7.2B | 41.4 | 3 | 100.0% |
| Negros Island Region | 99 | ₱3B | 48.8 | 4 | 91.4% |
| Region V | 68 | ₱3.4B | 55.8 | 0 | 99.6% |
| Region IV-A | 34 | ₱1B | 50.0 | 0 | 87.0% |
| Region VI | 30 | ₱1.7B | 54.6 | 7 | 82.7% |
| Region X | 27 | ₱1.7B | 48.5 | 0 | 99.2% |
| Region IX | 25 | ₱955.5M | 56.6 | 0 | 100.0% |
| Region IV-B | 13 | ₱466.9M | 39.6 | 0 | 100.0% |
| Region VII | 6 | ₱120.4M | 47.2 | 0 | 100.0% |
| National Capital Region | 3 | ₱79.4M | 46.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 212 | ₱8.8B | 49.5 | 1 | 96.4% |
| Buildings and Facilities | 117 | ₱2.1B | 35.0 | 2 | 97.6% |
| Bridges | 112 | ₱3.2B | 47.6 | 5 | 95.3% |
| Flood Control and Drainage | 111 | ₱4.4B | 49.3 | 1 | 99.6% |
| Water Provision and Storage | 17 | ₱64.8M | 23.1 | 0 | 100.0% |
| OTHER | 12 | ₱531.4M | 76.7 | 0 | 100.0% |
| Bridges, Roads | 5 | ₱510.1M | 61.5 | 1 | 83.4% |
| GAA 2025 SSP | 4 | ₱39.4M | 89.8 | 4 | 59.1% |
| GAA 2025 OO-1 | 1 | ₱22.1M | 86.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GN0064CONSTRUCTION OF ROAD AT BARANGAY GUINTORILAN, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.9M | 36% | High risk94 | Flagged0.022 |
| 25GL0102CONSTRUCTION OF MUNICIPAL HALL - ANNEX BUILDING, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱9.9M | 70% | High risk93 | Flagged0.013 |
| 25RD0095CONSTRUCTION OF ROADS (SITIO LIBOT LIBOT BRGY. PANDAN UP TO BRGY. PROPER), PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.8M | 78% | High risk93 | Flagged0.011 |
| 25GQ0016REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD. - K0049+092 - K0049+157 | Negros Island Region | Negros Occidental 5th DEO | Completed | ₱22.1M | 100% | High risk86 | —-0.030 |
| 20IB0083CONSTRUCTION OF MISSING LINKS/NEW ROADS ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD, JIPAPAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱96.9M | 100% | High risk83 | —-0.023 |
| 20IF0011WIDENING OF PERMANENT BRIDGES, BACAN BR. (B00582LT) ALONG ORMOC-BAYBAY SOUTHERN LEYTE BDRY. ROAD | Region VIII | Leyte 4th DEO | Completed | ₱69.6M | 100% | High risk81 | —-0.035 |
| 17IL0071MAASIN CITY BYPASS ROAD CUM SEA WALL, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱49M | 100% | High risk80 | —-0.036 |
| 25RE0012CONSTRUCTION OF ROAD OF BARANGAY CRUZ PASSING THRU BARANGAY MACASILAO, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱9.9M | 52% | High risk79 | Flagged0.018 |
| 17FG0038INDV. PROJECT PAVING OF SHOULDERS WITH DRAINAGE IMPROVEMENT ALONG NABUA BALATAN ROAD, NABUA BALATAN, CAMARINES SUR K0 477+177 - K0477+440, K0483+000 - 483+591, K0 488+649 - K0 488+801, K0489+590 - K0489+800, K0491+332 - K0 491+622, K0 492+450 - KO 493+000 | Region V | Camarines Sur 5th DEO | Completed | ₱48.2M | 100% | High risk78 | —-0.037 |
| 17IC0024IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG DAANG MAHARLIKA (LT) (S00024LT) K0930+123 - K 0930+816, K0930+824 - K0930+911, K0930+921 - K0931+509, TELEGRAFO, TOLOSA, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱38.4M | 100% | High risk77 | —-0.038 |
| 19IF0098CONSTRUCTION OF MULTI-PURPOSE (MUNICIPAL) BUILDING, PHASE I, MATAG-OB, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱8.9M | 100% | High risk77 | —-0.038 |
| 17FG0039INDV. PROJ. REHAB./RECONST./UPGRADING DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE ALONG IRIGA CITY-SAN ISIDRO-SAGRADA-SAN RAMON-HANAWAN ROAD, IRIGA CITY K0 484+(-031.40)-K0 484+455, K0 485+(-020.80)-K0 485+108.80, K0 486+333-K0 487+000 | Region V | Camarines Sur 5th DEO | Completed | ₱18.6M | 100% | High risk76 | —-0.036 |
| 17FG0044INDV. PROJ. - CONCRETING OF MONTE-CALVARIO-IGBAC BARANGAY ROAD, MONTE-CALVARIO AND IGBAC, BUHI, CAMARINES SUR STA. 00+000-STA. 00+105, STA. 00+165-STA. 00+298, STA. 00+379-STA. 00+733 | Region V | Camarines Sur 5th DEO | Completed | ₱9.4M | 100% | High risk76 | —-0.035 |
| 18JI0054RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES AT SAN JOSE BR. (B00481MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱33.2M | 100% | High risk76 | —-0.029 |
| 21FJ0017OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, APP - REHAB/RECONSTRUCTION OF NATIONAL ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MASBATE-CATAINGAN-PLACER RD - K0072+984 - K0073+498 | Region V | Masbate 3rd DEO | Completed | ₱33.3M | 100% | High risk74 | —-0.033 |
| 17D00039MFO-1 NATIONAL ROAD NETWROK SERVICES CONST. & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS REPLACEMENT OF PERMANENT WEAK BRIDGES PRINCESA BR. (B02425LZ) ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD, QUEZON | Region IV-A | Region IV-A | Completed | ₱86.8M | 100% | High risk74 | —-0.009 |
| 17G00058CONST. OF CONCRETE ROAD - BRGY. SAN ANTONIO - CONDEZ - SAN LUIS - SAN VICENTE - FLORES ROAD LEADING | Region VI | Region VI | Completed | ₱134.8M | 100% | High risk73 | —-0.010 |
| 18J00012CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS, LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE) UPPER LA PAZ, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱118M | 100% | High risk73 | —-0.049 |
| 20F00021LOCAL PROGRAM: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS, CONSTRUCTION OF ROAD WITH SEAWALL, BARANGAY TABA-TABA TO BARANGAY MANGCAMAGONG, BASUD, CAMARINES NORTE, B | Region V | Region V | Completed | ₱144.8M | 100% | High risk72 | —-0.043 |
| 24GG0195CONSTRUCTION OF MULTI - PURPOSE FACILITY, BRGY. BADIANG, ANILAO, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱12.8M | 100% | High risk70 | —-0.058 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19G00109BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SEGMENT 3, INCLUDING ROW, BACOLOD CITY | Region VI | Region VI | On-Going | ₱85.3M | 14% | Medium risk56 | Flagged0.067 |
| 22G00062BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SEGMENT 3, BACOLOD CITY | Region VI | Region VI | On-Going | ₱69.4M | 50% | Medium risk53 | Flagged0.022 |
| 25GN0064CONSTRUCTION OF ROAD AT BARANGAY GUINTORILAN, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.9M | 36% | High risk94 | Flagged0.022 |
| 25RE0012CONSTRUCTION OF ROAD OF BARANGAY CRUZ PASSING THRU BARANGAY MACASILAO, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱9.9M | 52% | High risk79 | Flagged0.018 |
| 25GL0102CONSTRUCTION OF MUNICIPAL HALL - ANNEX BUILDING, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱9.9M | 70% | High risk93 | Flagged0.013 |
| 25RD0095CONSTRUCTION OF ROADS (SITIO LIBOT LIBOT BRGY. PANDAN UP TO BRGY. PROPER), PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.8M | 78% | High risk93 | Flagged0.011 |
| 23G00044BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 1, SEGMENT 3, PHASE 4, TALISAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱67.7M | 62% | Medium risk53 | Flagged0.010 |
| 23G00055BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, BACOLOD CITY | Region VI | Region VI | On-Going | ₱104.8M | 17% | High risk64 | Flagged0.007 |
| 21G00051CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG ILOG - HILABANGAN RIVER, KABANKALAN CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱91.7M | 93% | Medium risk56 | Flagged0.005 |
| 18IB0193CONSTRUCTION OF VILLAHERMOSA BRIDGE, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱25.5M | 100% | Medium risk48 | Flagged0.005 |
| 18IB0191CONSTRUCTION OF HINOLASO BRIDGE II, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱22.5M | 100% | Medium risk48 | Flagged0.002 |
| 18IB0192CONSTRUCTION OF HINOLASO BRIDGE I, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱17.6M | 100% | Medium risk48 | Flagged0.001 |
| 16GB0215CONSTRUCTION OF 4 STOREY TWENTY FOUR(24) CLASSROOM SCHOOL BUILDING AT ANTIQUE NS, SAN JOSE(CAPITAL), | Region VI | Antique DEO | Completed | ₱34.7M | 100% | Medium risk50 | Flagged0.001 |
| 16GB0216CONSTRUCTION OF 4 STOREY TWENTY(20) CLASSROOM SCHOOL BUILDING AT ANTIQUE NS, SAN JOSE(CAPITAL), ANTI | Region VI | Antique DEO | Completed | ₱30.2M | 100% | Medium risk50 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20K00055CONSTRUCTION OF MISSING LINKS/NEW ROADS, ILIGAN CITY - CAGAYAN DE ORO CITY ALTERNATE ROUTE (DIGKILAAN - BULUA SECTION), PACKAGE 4, LANAO DEL NORTE | Region X | Region X | Completed | ₱97.3M | 100% | Medium risk56 | —-0.081 |
| 102 | 18KF0074REHAB./RECON. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG STA. FELOMINA-BONBONON-DIGKILAAN-ROGONGON ROAD K1528+500-K1528+562, K1528+500-K1528+600, K1533+900-K1534+053, K1555+000-K1556+000 | Region X | Lanao del Norte 1st DEO | Completed | ₱92.9M | 100% | Medium risk56 | —-0.083 |
| 103 | 17IL0043NETWORK DEVELOPMENT- OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG ABUYOG -SILAGO ROAD K0996+000 - K1001+753, SILAGO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱48M | 100% | Medium risk56 | —-0.059 |
| 104 | 17IL0042CONCRETING OF BRGY. LONOY-TIGBAWAN ROAD, CITY OF MAASIN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱49.5M | 100% | Medium risk56 | —-0.058 |
| 105 | 21G00051CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG ILOG - HILABANGAN RIVER, KABANKALAN CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱91.7M | 93% | Medium risk56 | Flagged0.005 |
| 106 | 19G00109BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SEGMENT 3, INCLUDING ROW, BACOLOD CITY | Region VI | Region VI | On-Going | ₱85.3M | 14% | Medium risk56 | Flagged0.067 |
| 107 | 18FI0025NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS MANDAON-DAYHAGAN ROAD, MASBATE | Region V | Masbate 2nd DEO | Completed | ₱46.5M | 100% | Medium risk55 | —-0.096 |
| 108 | 18IF0054WIDENING OF BRIDGE - BAO BR. (B00184LT) ALONG PALO-CARIGARA-ORMOC ROAD | Region VIII | Leyte 4th DEO | Completed | ₱73M | 100% | Medium risk55 | —-0.056 |
| 109 | 17IB0051REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SOIL COLLAPSE & LANDSLIDE (S00167SM) JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD, K0946+900 - K0947+100, K0947+000 - K0947+300, K0947+600 - K0947+800, K0947+600 - K0947+795, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱44.1M | 100% | Medium risk55 | —-0.058 |
| 110 | 20IF0034CONSTRUCTION OF NEW BRIDGES - LUNDAG BR 2 ALONG MERIDA - LUNDAG - PUTING BATO - CONSOLACION - ISABEL ROAD | Region VIII | Leyte 4th DEO | Completed | ₱73.3M | 100% | Medium risk55 | —-0.054 |
| 111 | 17IF0010ASSET PRESERVATION OF NAT'L RDS. - REHAB./RECONST. UPGRADING OF DAMAGED PAVED NAT'L RDS. INCLUDING DRAINAGE BASED ON PAVEMENT MGNT. SYSTEM/ HIGWAY DEVT. & MGNT. -4 (HDM-4) SECONDARY, VILLABA-PALOMPON ROAD, K1060+890 - K1061+188, K1063+110 - K1063+155 | Region VIII | Leyte 4th DEO | Completed | ₱9.8M | 100% | Medium risk55 | —-0.060 |
| 112 | 18IB0036OFF-CARRIAGEWAY IMPROVEMENT ALONG ARTECHE-JIPAPAD-LAS NAVAS - RAWIS ROAD (S00137SM), K0968+(-088) - K0973+645 | Region VIII | Eastern Samar DEO | Completed | ₱88.5M | 100% | Medium risk55 | —-0.084 |
| 113 | 17IL0046NETWORK DEVELOPMENT- OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG JCT. HIMAY-ANGAN - SILAGO-ABUYOG ROAD K1099+065-K1101+875 HINUNGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱48M | 100% | Medium risk55 | —-0.059 |
| 114 | 18IB0037OFF-CARRIAGEWAY IMPROVEMENT ALONG BORONGAN - GUIUAN ROAD (S00170SM), K0973+127.9 - K0976+286; K0976+470 - K0978+447; K0978+485 - K0978+503; K0978+533 - K0979+125 | Region VIII | Eastern Samar DEO | Completed | ₱55.7M | 100% | Medium risk55 | —-0.092 |
| 115 | 20IL0027NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS/LILO-AN - SAN RICARDO CIRCUMFERENTIAL ROAD, BENIT-ESPERANZA SECTION, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱77.2M | 100% | Medium risk55 | —-0.077 |
| 116 | 20IL0074BRIDGE-WIDENING OF PERMANENT BRIDGE, BOGASONG BRIDGE 1 (B00601LT) ALONG DAANG MAHARLIKA | Region VIII | Southern Leyte 1st DEO | Completed | ₱66.6M | 100% | Medium risk55 | —-0.046 |
| 117 | 18IF0058WIDENING OF BRIDGE - PALANAS BR. (B00580LT) ALONG ORMOC-BAYBAY SOUTHERN LEYTE BDRY ROAD | Region VIII | Leyte 4th DEO | Completed | ₱72.2M | 100% | Medium risk55 | —-0.055 |
| 118 | 18IB0109CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD FROM NATIONAL HIGHWAY TO BRGY. IBERAN, SALCEDO, EASTERN SAMAR CONNECTING TO THE CASSAVA FLOUR PROCESSING PROJECT AND PROVINCIAL CACAO NURSERY PROJECT, SALCEDO, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱72.4M | 100% | Medium risk55 | —-0.087 |
| 119 | 25DD0247ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, BULACNIN BR. 1 (B03069LZ) ALONG LIPA-BALETE RD | Region IV-A | Batangas 4th DEO | On-Going | ₱84.2M | 3% | Medium risk55 | —-0.003 |
| 120 | 17IF0028NETWORK DEVELOPMENT - OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE SECONDARY, VILLABA - PALOMPON ROAD, S00159LT, K1059+(-649) - K1061+000 | Region VIII | Leyte 4th DEO | Completed | ₱43.9M | 100% | Medium risk55 | —-0.060 |
| 121 | 17IL0016CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD-BDRY. SO. LEYTE-MAASIN-MACROHON-SOGOD-JCT.-MAHARLIKA (S00194LT) K1149+000-K1152+000, MACROHON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱48M | 100% | Medium risk55 | —-0.058 |
| 122 | 17IL0014OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG LILOAN-SAN RICARDO ROAD(S00218LT) K1070+685.00 - K1072+000.00SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱48M | 100% | Medium risk55 | —-0.058 |
| 123 | 21FI0014FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LUMBANG RIVER FLOOD CONTROL, STA. 3+758 - STA. 4+100 (UPSTREAM, RIGHT SIDE), STA.3+758 - STA.4+100 (UPSTREAM, LEFT SIDE), NET LENGTH | Region V | Masbate 2nd DEO | Completed | ₱49M | 100% | Medium risk55 | —-0.085 |
| 124 | 18JG0047IMPROVEMENT/CONCRETING OF CULABAY - CAPISAN ROAD, TABINA, ZAMBOANGA DEL SUR, STA. 0+000.00 - STA. 3+700.00, NET LENGTH=3.700 KM. | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱34.7M | 100% | Medium risk55 | —-0.077 |
| 125 | 17IF0029ASSET PRESERVATION OF NATIONAL ROADS - CONST/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY CONST/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, PALOMPON-ISABEL-MERIDA-ORMOC ROAD, S00152LT, K1085+020-K1086+669 | Region VIII | Leyte 4th DEO | Completed | ₱23.9M | 100% | Medium risk55 | —-0.060 |