Contractor dossier
591 projects on file, including joint ventures this contractor is part of.
Total projects
591
Total budget
₱19.7B
Average progress
96.8%
Completion rate
91.5%
Average risk score
46.5
Medium risk on average, out of 100
Flagged as unusual
14
2.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 286 | ₱7.2B | 41.4 | 3 | 100.0% |
| Negros Island Region | 99 | ₱3B | 48.8 | 4 | 91.4% |
| Region V | 68 | ₱3.4B | 55.8 | 0 | 99.6% |
| Region IV-A | 34 | ₱1B | 50.0 | 0 | 87.0% |
| Region VI | 30 | ₱1.7B | 54.6 | 7 | 82.7% |
| Region X | 27 | ₱1.7B | 48.5 | 0 | 99.2% |
| Region IX | 25 | ₱955.5M | 56.6 | 0 | 100.0% |
| Region IV-B | 13 | ₱466.9M | 39.6 | 0 | 100.0% |
| Region VII | 6 | ₱120.4M | 47.2 | 0 | 100.0% |
| National Capital Region | 3 | ₱79.4M | 46.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 212 | ₱8.8B | 49.5 | 1 | 96.4% |
| Buildings and Facilities | 117 | ₱2.1B | 35.0 | 2 | 97.6% |
| Bridges | 112 | ₱3.2B | 47.6 | 5 | 95.3% |
| Flood Control and Drainage | 111 | ₱4.4B | 49.3 | 1 | 99.6% |
| Water Provision and Storage | 17 | ₱64.8M | 23.1 | 0 | 100.0% |
| OTHER | 12 | ₱531.4M | 76.7 | 0 | 100.0% |
| Bridges, Roads | 5 | ₱510.1M | 61.5 | 1 | 83.4% |
| GAA 2025 SSP | 4 | ₱39.4M | 89.8 | 4 | 59.1% |
| GAA 2025 OO-1 | 1 | ₱22.1M | 86.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GN0064CONSTRUCTION OF ROAD AT BARANGAY GUINTORILAN, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.9M | 36% | High risk94 | Flagged0.022 |
| 25GL0102CONSTRUCTION OF MUNICIPAL HALL - ANNEX BUILDING, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱9.9M | 70% | High risk93 | Flagged0.013 |
| 25RD0095CONSTRUCTION OF ROADS (SITIO LIBOT LIBOT BRGY. PANDAN UP TO BRGY. PROPER), PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.8M | 78% | High risk93 | Flagged0.011 |
| 25GQ0016REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD. - K0049+092 - K0049+157 | Negros Island Region | Negros Occidental 5th DEO | Completed | ₱22.1M | 100% | High risk86 | —-0.030 |
| 20IB0083CONSTRUCTION OF MISSING LINKS/NEW ROADS ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD, JIPAPAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱96.9M | 100% | High risk83 | —-0.023 |
| 20IF0011WIDENING OF PERMANENT BRIDGES, BACAN BR. (B00582LT) ALONG ORMOC-BAYBAY SOUTHERN LEYTE BDRY. ROAD | Region VIII | Leyte 4th DEO | Completed | ₱69.6M | 100% | High risk81 | —-0.035 |
| 17IL0071MAASIN CITY BYPASS ROAD CUM SEA WALL, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱49M | 100% | High risk80 | —-0.036 |
| 25RE0012CONSTRUCTION OF ROAD OF BARANGAY CRUZ PASSING THRU BARANGAY MACASILAO, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱9.9M | 52% | High risk79 | Flagged0.018 |
| 17FG0038INDV. PROJECT PAVING OF SHOULDERS WITH DRAINAGE IMPROVEMENT ALONG NABUA BALATAN ROAD, NABUA BALATAN, CAMARINES SUR K0 477+177 - K0477+440, K0483+000 - 483+591, K0 488+649 - K0 488+801, K0489+590 - K0489+800, K0491+332 - K0 491+622, K0 492+450 - KO 493+000 | Region V | Camarines Sur 5th DEO | Completed | ₱48.2M | 100% | High risk78 | —-0.037 |
| 17IC0024IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG DAANG MAHARLIKA (LT) (S00024LT) K0930+123 - K 0930+816, K0930+824 - K0930+911, K0930+921 - K0931+509, TELEGRAFO, TOLOSA, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱38.4M | 100% | High risk77 | —-0.038 |
| 19IF0098CONSTRUCTION OF MULTI-PURPOSE (MUNICIPAL) BUILDING, PHASE I, MATAG-OB, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱8.9M | 100% | High risk77 | —-0.038 |
| 17FG0039INDV. PROJ. REHAB./RECONST./UPGRADING DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE ALONG IRIGA CITY-SAN ISIDRO-SAGRADA-SAN RAMON-HANAWAN ROAD, IRIGA CITY K0 484+(-031.40)-K0 484+455, K0 485+(-020.80)-K0 485+108.80, K0 486+333-K0 487+000 | Region V | Camarines Sur 5th DEO | Completed | ₱18.6M | 100% | High risk76 | —-0.036 |
| 17FG0044INDV. PROJ. - CONCRETING OF MONTE-CALVARIO-IGBAC BARANGAY ROAD, MONTE-CALVARIO AND IGBAC, BUHI, CAMARINES SUR STA. 00+000-STA. 00+105, STA. 00+165-STA. 00+298, STA. 00+379-STA. 00+733 | Region V | Camarines Sur 5th DEO | Completed | ₱9.4M | 100% | High risk76 | —-0.035 |
| 18JI0054RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES AT SAN JOSE BR. (B00481MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱33.2M | 100% | High risk76 | —-0.029 |
| 21FJ0017OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, APP - REHAB/RECONSTRUCTION OF NATIONAL ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MASBATE-CATAINGAN-PLACER RD - K0072+984 - K0073+498 | Region V | Masbate 3rd DEO | Completed | ₱33.3M | 100% | High risk74 | —-0.033 |
| 17D00039MFO-1 NATIONAL ROAD NETWROK SERVICES CONST. & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS REPLACEMENT OF PERMANENT WEAK BRIDGES PRINCESA BR. (B02425LZ) ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD, QUEZON | Region IV-A | Region IV-A | Completed | ₱86.8M | 100% | High risk74 | —-0.009 |
| 17G00058CONST. OF CONCRETE ROAD - BRGY. SAN ANTONIO - CONDEZ - SAN LUIS - SAN VICENTE - FLORES ROAD LEADING | Region VI | Region VI | Completed | ₱134.8M | 100% | High risk73 | —-0.010 |
| 18J00012CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS, LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE) UPPER LA PAZ, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱118M | 100% | High risk73 | —-0.049 |
| 20F00021LOCAL PROGRAM: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS, CONSTRUCTION OF ROAD WITH SEAWALL, BARANGAY TABA-TABA TO BARANGAY MANGCAMAGONG, BASUD, CAMARINES NORTE, B | Region V | Region V | Completed | ₱144.8M | 100% | High risk72 | —-0.043 |
| 24GG0195CONSTRUCTION OF MULTI - PURPOSE FACILITY, BRGY. BADIANG, ANILAO, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱12.8M | 100% | High risk70 | —-0.058 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19G00109BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SEGMENT 3, INCLUDING ROW, BACOLOD CITY | Region VI | Region VI | On-Going | ₱85.3M | 14% | Medium risk56 | Flagged0.067 |
| 22G00062BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SEGMENT 3, BACOLOD CITY | Region VI | Region VI | On-Going | ₱69.4M | 50% | Medium risk53 | Flagged0.022 |
| 25GN0064CONSTRUCTION OF ROAD AT BARANGAY GUINTORILAN, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.9M | 36% | High risk94 | Flagged0.022 |
| 25RE0012CONSTRUCTION OF ROAD OF BARANGAY CRUZ PASSING THRU BARANGAY MACASILAO, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱9.9M | 52% | High risk79 | Flagged0.018 |
| 25GL0102CONSTRUCTION OF MUNICIPAL HALL - ANNEX BUILDING, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱9.9M | 70% | High risk93 | Flagged0.013 |
| 25RD0095CONSTRUCTION OF ROADS (SITIO LIBOT LIBOT BRGY. PANDAN UP TO BRGY. PROPER), PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱9.8M | 78% | High risk93 | Flagged0.011 |
| 23G00044BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 1, SEGMENT 3, PHASE 4, TALISAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱67.7M | 62% | Medium risk53 | Flagged0.010 |
| 23G00055BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, BACOLOD CITY | Region VI | Region VI | On-Going | ₱104.8M | 17% | High risk64 | Flagged0.007 |
| 21G00051CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG ILOG - HILABANGAN RIVER, KABANKALAN CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱91.7M | 93% | Medium risk56 | Flagged0.005 |
| 18IB0193CONSTRUCTION OF VILLAHERMOSA BRIDGE, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱25.5M | 100% | Medium risk48 | Flagged0.005 |
| 18IB0191CONSTRUCTION OF HINOLASO BRIDGE II, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱22.5M | 100% | Medium risk48 | Flagged0.002 |
| 18IB0192CONSTRUCTION OF HINOLASO BRIDGE I, INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱17.6M | 100% | Medium risk48 | Flagged0.001 |
| 16GB0215CONSTRUCTION OF 4 STOREY TWENTY FOUR(24) CLASSROOM SCHOOL BUILDING AT ANTIQUE NS, SAN JOSE(CAPITAL), | Region VI | Antique DEO | Completed | ₱34.7M | 100% | Medium risk50 | Flagged0.001 |
| 16GB0216CONSTRUCTION OF 4 STOREY TWENTY(20) CLASSROOM SCHOOL BUILDING AT ANTIQUE NS, SAN JOSE(CAPITAL), ANTI | Region VI | Antique DEO | Completed | ₱30.2M | 100% | Medium risk50 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 18JC0035WIDENING OF DELUSOM BR. (B00518MN) ALONG SINDANGAN-LILOY RD, LEON B. POSTIGO, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱37.7M | 100% | Medium risk52 | —-0.036 |
| 152 | 18FF0016FY-2018 ASSET PRESERVATION OF NAT'L RD.-REHAB/RECONST/UPGRADING OF DAMAGED PAVED NAT'L RD. INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM ALONG JCT. BINALAY (TINAMBAC)-TAMBAN ROAD, OLAG-PEQUEÑO-BATAAN SECTION, TINAMBAC-SIRUMA, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱28M | 100% | Medium risk52 | —-0.100 |
| 153 | 18JF0018REHABILITATION/ MAJOR REPAIR OF BRIDGE ALONG GUILINAN BR. (B005112MN) ALONG PAGADIAN-ZAMBOANGA CITY RD., ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱23.4M | 100% | Medium risk52 | —-0.056 |
| 154 | 21IL0113NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS LILOAN - SAN RICARDO CIRCUMFERENTIAL ROAD, PACKAGE 1, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.088 |
| 155 | 20JI0059WIDENING OF PERMANENT BRIDGES (CONSTRUCTION OF PARALLEL BRIDGE) - SAN JOSE BR. (B00481MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱41.1M | 100% | Medium risk52 | —-0.043 |
| 156 | 20IL0115CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF CATUBLIAN FLOOD CONTROL, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱67.6M | 100% | Medium risk52 | —-0.075 |
| 157 | 21G00034CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT PATUN-AN RIVER, ABUT 'A' (UPSTREAM) ALONG BACOLOD NORTH ROAD (S00408NR), CALATRAVA, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱79.1M | 100% | Medium risk52 | —-0.055 |
| 158 | 22GO0016CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL TOADS- TERTIARY ROADS - BACOLOD CITY BDRY ROAD ( S00428NR) CHAINAGE 000-CHAINAGE 3285 | Negros Island Region | Bacolod City DEO | Completed | ₱63.4M | 100% | Medium risk52 | —-0.087 |
| 159 | 25R00001BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, BACOLOD CITY | Negros Island Region | Negros Island Region | On-Going | ₱86.7M | 0% | Medium risk52 | —-0.033 |
| 160 | 19GO0108HERNAEZ STREET LEADING TO MURCIA PROPER AND MAMBUKAL RESORT , BRGY. MANSILINGAN, BACOLOD CITY,NEG.OCC | Negros Island Region | Bacolod City DEO | Completed | ₱86.9M | 100% | Medium risk52 | —-0.082 |
| 161 | 18GO0102CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS (HERNAEZ STREET LEADING TO MURCIA PROPER AND MAMBUKAL RESORT) BRGY. MANSILINGAN, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱82.4M | 100% | Medium risk52 | —-0.083 |
| 162 | 23GL0019ROAD WIDENING - JCT BAGONAWA-LA CASTELLANA-ISABELA RD - K0072 + 244 - K0074 + 138 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱62.2M | 100% | Medium risk52 | —-0.086 |
| 163 | 21JF0012CONSTRUCTION OF FLOOD CONTROL ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD, BULUAN RIVER (PHASE III) (UPSTREAM), ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱41.2M | 100% | Medium risk52 | —-0.072 |
| 164 | 18FF0026CY-2018 ASSET PRESERVATION OF NAT'L RD REHAB/RECONST/UPGRADING OF DAM'G PAVED NAT'L RD INCLUDING DRAINGE BASED ON PAVEMENT MGMN'T SYSTEM/(HDM-4) ALONG JUNCTION-DIGDIGON (GOA)-TINAMBAC RD, SAGAD BINALAY-POBLACION SECTION, TINAMBAC, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱13.6M | 100% | Medium risk52 | —-0.101 |
| 165 | 22KD0016CONST OF DRAINAGE STRUCTURE ALONG BCIR K1437+080 TO K1437+562 | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱75.4M | 100% | Medium risk52 | —-0.080 |
| 166 | 24IL0016FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE - BDRY. SO. LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA RD. - ALONG MAASIN CITY SECTION | Region VIII | Southern Leyte 1st DEO | Completed | ₱61.7M | 100% | Medium risk52 | —-0.075 |
| 167 | 18JF0016CONSTRUCTION OF FLOOD CONTROL PROJECT PHASE I IN METRO BRGY. OF IPIL (DON ANDRES, LOWER TAWAY, SANITO, POBLACION/ BANGKEROHAN), IPIL, Z.S | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱27.7M | 100% | Medium risk52 | —-0.073 |
| 168 | 18KF0071REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG STA. FELOMINA-BONBONON-DIGKILAAN-ROGONGON ROAD INCLUDING ROW K1549+(-200)-K1551+000 | Region X | Lanao del Norte 1st DEO | Completed | ₱83.3M | 100% | Medium risk51 | —-0.083 |
| 169 | 20FG0027REHABILITATION/RECONSTRUCTION OF NATIONAL ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD (P00401469LZ)K0566+860 - K0567+010K0567+618 - K0567+668CARAMOAN, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱15.8M | 100% | Medium risk51 | —-0.101 |
| 170 | 21IF0028CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, RURAL HEALTH UNIT-PALOMPON MUNICIPAL HEALTH OFFICE, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱9.4M | 100% | Medium risk51 | —-0.098 |
| 171 | 21IL0117LOCAL - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF MULTI-PURPOSE BUILDING (OPD) BUILDING, SOGOD DISTRICT HOSPITAL, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱14.8M | 100% | Medium risk51 | —-0.095 |
| 172 | 22G00171CONSTRUCTION OF (COMPLETION) OF MULTI-PURPOSE BUILDING (BACOLOD MUSEUM), BRGY. TANGUB, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱48.3M | 100% | Medium risk51 | —-0.065 |
| 173 | 19IF0073REHABILITATION OF PALOMPON CIVIC CENTER, RIZAL ST., GOVERNMENT CENTER, PALOMPON, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱6.6M | 100% | Medium risk51 | —-0.098 |
| 174 | 18JC0033WIDENING OF MILANID BR. (B00516MN) ALONG SINDANGAN-LILOY RD, LEON B. POSTIGO, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱23.6M | 100% | Medium risk51 | —-0.049 |
| 175 | 19KF0080REHABILITATION/RECONSTRCUTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, STA. FELOMINA-BONBONON-DIGKILAAN-ROGONGON ROAD, K1535+384-1535+811, K1537+200-K1537+380, K1537+800-K1537+998,K1540+500-K1540+550, ILIGAN CITY | Region X | Lanao del Norte 1st DEO | Completed | ₱66.9M | 100% | Medium risk51 | —-0.088 |