Contractor dossier
362 projects on file, including joint ventures this contractor is part of.
Total projects
362
Total budget
₱17.3B
Average progress
88.7%
Completion rate
69.3%
Below 70%
Average risk score
56.6
Medium risk on average, out of 100
Flagged as unusual
62
17.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VI | 357 | ₱17.2B | 56.7 | 62 | 88.5% |
| Negros Island Region | 5 | ₱133.1M | 45.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 143 | ₱6.8B | 50.3 | 2 | 94.3% |
| Flood Control and Drainage | 75 | ₱4.2B | 52.5 | 2 | 92.0% |
| Bridges | 42 | ₱1.5B | 48.4 | 1 | 95.8% |
| Buildings and Facilities | 36 | ₱1B | 48.2 | 9 | 82.8% |
| OTHER | 25 | ₱1.4B | 79.7 | 20 | 74.8% |
| GAA 2025 OO-1 | 20 | ₱470.4M | 93.1 | 15 | 62.8% |
| GAA 2025 SSP | 9 | ₱714.7M | 95.4 | 9 | 66.0% |
| Bridges, Roads | 7 | ₱670.8M | 58.2 | 1 | 94.4% |
| GAA 2025 OO-2 | 5 | ₱516.1M | 92.3 | 3 | 67.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GJ0023CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG CALAJUNAN CREEK, BARANGAY CALAJUNAN, ILOILO CITY | Region VI | Iloilo City DEO | On-Going | ₱125.9M | 86% | High risk96 | Flagged0.032 |
| 25GF0087CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MIAGAO, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱139.8M | 58% | High risk96 | Flagged0.042 |
| 25G00008CONSTRUCTION OF MAGUGBA BRIDGE, BARANGAY POBLACION, LIBACAO, AKLAN | Region VI | Region VI | On-Going | ₱192.6M | 38% | High risk96 | Flagged0.050 |
| 25G00081PASSI BYPASS ROAD, ILOILO | Region VI | Region VI | On-Going | ₱86.4M | 24% | High risk95 | Flagged0.022 |
| 25GH0145CONSTRUCTION OF ROAD - JUNCTION BAROTAC VIEJO - LEMERY ROAD SITIO - BANGON - BANGON - RIZAL ROAD CONNECTING NRJ ILOILO BAROTAC VIEJO - SAN RAFAEL ROAD, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱79M | 23% | High risk95 | Flagged0.042 |
| 25G00004REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - LUNA - JALANDONI FLYOVER (B00483PN) ALONG JALANDONI FLYOVER | Region VI | Region VI | On-Going | ₱77.3M | 58% | High risk95 | Flagged0.011 |
| 25GF0030CONSTRUCTION OF FLOOD MITIGATING STRUCTURE, MIAGAO TUMAGBOK RIVER, MIAGAO, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱29.6M | 100% | High risk95 | Flagged0.011 |
| 25GI0029INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NEW LUCENA-STA. BARBARA RD - K0016 + (-467) - K0021 + 500 AND CABATUAN-NEW LUCENA-BANGA-BANTE RD - K0041 + (-677) - K0041 + (-186) | Region VI | Iloilo 4th DEO | On-Going | ₱40.7M | 90% | High risk95 | Flagged0.016 |
| 25GH0110REHABILITATION OF ROAD, BARANGAY BAY- ANG CONNECTING CEMPHIL CEMENT PRODUCTION PLANT, AJUY, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱57.7M | 42% | High risk95 | Flagged0.031 |
| 25GF0029CONSTRUCTION OF FLOOD MITIGATING STRUCTURE, MIAGAO SAN JOSE RIVER, MIAGAO, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱29.6M | 81% | High risk95 | Flagged0.021 |
| 25GP0015CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, SITIO BAIDAN TO SITIO AGBALAGON, BARANGAY SAN MIGUEL, DUMALAG, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱19.8M | 76% | High risk95 | Flagged0.019 |
| 25GF0063CONSTRUCTION OF MIAGAO SHORELINE/SEAWALL PROTECTION INCLUDING ACCESS ROAD, MIAGAO, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱96.2M | 69% | High risk94 | Flagged0.006 |
| 25GP0033RECONSTRUCTION TO CONCRETE PAVEMENT - GUINTAS-PINAMALATICAN ROAD, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱29.4M | 47% | High risk93 | Flagged0.010 |
| 25GH0077CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MAYA, BALASAN, ILOILO (PACKAGE 1) | Region VI | Iloilo 3rd DEO | On-Going | ₱144.5M | 30% | High risk93 | Flagged0.019 |
| 25GP0062ROAD WIDENING ILOILO- CAPIZ RD (NEW ROUTE)- K0089+531- K0089+653, K0089+671- K0089+707, K0089+880- K0089+913, K0090+451- K0090+500, K0093+425- K0093+660 | Region VI | Capiz 2nd DEO | On-Going | ₱32.6M | 65% | High risk93 | Flagged0.007 |
| 25GH0081REHABILITATION/ MAJOR REPAIR OF BRIDGE - GERONGAN BR. (B00225PN) ALONG PASSI-SN RAFAEL-LEMERY-SARA RD | Region VI | Iloilo 3rd DEO | On-Going | ₱25.6M | 25% | High risk93 | Flagged0.015 |
| 25GH0045REHABILITATION/MAJOR REPAIR OF BRIDGE- CULASI BR. (B00214PN) ALONG ILOILO EAST COAST- CAPIZ RD | Region VI | Iloilo 3rd DEO | On-Going | ₱19.2M | 78% | High risk93 | Flagged0.002 |
| 25GH0080REHABILITATION/ MAJOR REPAIR OF BRIDGE - TIGBAO BR. (B00212PN) ALONG ILOILO EAST COAST-CAPIZ RD | Region VI | Iloilo 3rd DEO | On-Going | ₱16.4M | 24% | High risk93 | Flagged0.015 |
| 25GF0045PREVENTIVE MAINTENANCE - ILOILO - ANTIQUE RD - K0049 + 1026 - K0050 + 071, K0063 + 026 - K0064 + 117, K0064 + 658 - K0064 + 848 | Region VI | Iloilo 1st DEO | On-Going | ₱30.2M | 97% | High risk93 | —-0.006 |
| 25GH0078REHABILITATION/ MAJOR REPAIR OF BRIDGE - BALOGO BR. (B00211PN) ALONG ILOILO EAST COAST-CAPIZ RD | Region VI | Iloilo 3rd DEO | On-Going | ₱11.4M | 49% | High risk93 | Flagged0.010 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00141LGU HOSPITALS- SAN JOAQUIN MOTHER AND CHILD GENERAL HOSPITAL, ILOILO | Region VI | Region VI | On-Going | ₱39.7M | 28% | High risk89 | Flagged0.070 |
| 24GF0124CONCRETING OF BRGY. SAN MATEO SUR - BRGY. TALAGUTAC FMR, BRGY. SAN MATEO SUR AND BRGY. TALAGUTAC, SAN JOAQUIN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱14.9M | 0% | High risk68 | Flagged0.061 |
| 24G00130EXPANSION AND OPERATIONALIZATION OF UP EXTENSION CAMPUS IN PANDAN, ANTIQUE - UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VI | Region VI | On-Going | ₱29.8M | 71% | High risk87 | Flagged0.058 |
| 24G00134LGU HOSPITALS- IBAJAY DISTRICT HOSPITAL, AKLAN | Region VI | Region VI | On-Going | ₱59.6M | 0% | High risk62 | Flagged0.053 |
| 24G00107OTHER FACILITIES- TIGBAUAN DIALYSIS CENTER, ILOILO | Region VI | Region VI | On-Going | ₱14.9M | 88% | High risk89 | Flagged0.051 |
| 25G00008CONSTRUCTION OF MAGUGBA BRIDGE, BARANGAY POBLACION, LIBACAO, AKLAN | Region VI | Region VI | On-Going | ₱192.6M | 38% | High risk96 | Flagged0.050 |
| 25GH0145CONSTRUCTION OF ROAD - JUNCTION BAROTAC VIEJO - LEMERY ROAD SITIO - BANGON - BANGON - RIZAL ROAD CONNECTING NRJ ILOILO BAROTAC VIEJO - SAN RAFAEL ROAD, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱79M | 23% | High risk95 | Flagged0.042 |
| 25GF0087CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MIAGAO, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱139.8M | 58% | High risk96 | Flagged0.042 |
| 22G00032MAAYON-SARA BYPASS ROAD, ILOILO | Region VI | Region VI | On-Going | ₱125.5M | 86% | High risk82 | Flagged0.037 |
| 25GJ0023CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG CALAJUNAN CREEK, BARANGAY CALAJUNAN, ILOILO CITY | Region VI | Iloilo City DEO | On-Going | ₱125.9M | 86% | High risk96 | Flagged0.032 |
| 24GH0085CONSTRUCTION OF CONCRETE BRIDGE -POBLACION BAROTAC VIEJO -VISTA ALEGRE-NUEVA INVENCION-DEL PILAR -GEN. LUNA-SAN JOSE- ANABO CONNECTING NUEVA SWINE VALLEY, NRJ ILOILO EAST COAST CAPIZ ROAD, AND NRJ PASSI-SAN RAFAEL -LEMERY-SARA-ROAD, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱94M | 29% | High risk81 | Flagged0.032 |
| 24G00074CONSTRUCTION OF TEACHER EDUCATION NETWORK TRAINING DEVELOPMENT CENTER (PHASE I), MAIN CAMPUS - UNIVERSITY OF ANTIQUE | Region VI | Region VI | On-Going | ₱14.9M | 15% | Medium risk45 | Flagged0.031 |
| 25GH0110REHABILITATION OF ROAD, BARANGAY BAY- ANG CONNECTING CEMPHIL CEMENT PRODUCTION PLANT, AJUY, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱57.7M | 42% | High risk95 | Flagged0.031 |
| 24GP0055WIDENING OF BRIDGE - SIGMA BR. (B00233PN) ALONG ILOILO-CAPIZ RD (NEW ROUTE) | Region VI | Capiz 2nd DEO | On-Going | ₱39M | 0% | High risk78 | Flagged0.031 |
| 24GP0079CONCRETING OF BRGY. ROXAS FMR, BRGY. ROXAS, TAPAZ, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱14.8M | 99% | High risk69 | Flagged0.028 |
| 24G00050CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BRGY. STO. NIÑO, DUMALAG, CAPIZ PHASE 2 | Region VI | Region VI | On-Going | ₱178.5M | 83% | High risk85 | Flagged0.026 |
| 25GF0096CONSTRUCTION OF CORDOVA - BAROSONG BRIDGE, TIGBAUAN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱48.1M | 0% | High risk64 | Flagged0.025 |
| 24GP0029WIDENING OF BRIDGE - IBIAN BR. (B00235PN) ALONG ILOILO-CAPIZ RD (NEW ROUTE) | Region VI | Capiz 2nd DEO | On-Going | ₱32.2M | 35% | High risk78 | Flagged0.023 |
| 25G00081PASSI BYPASS ROAD, ILOILO | Region VI | Region VI | On-Going | ₱86.4M | 24% | High risk95 | Flagged0.022 |
| 25GF0047PREVENTIVE MAINTENANCE - MIAGAO CADRE RD - K0039+456 - K0040+000 | Region VI | Iloilo 1st DEO | On-Going | ₱13.3M | 8% | High risk92 | Flagged0.022 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 18GH0037ROAD WIDENING - BALASAN-CARLES RD - K0177+317 - K0179+874, CARLES, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱89M | 100% | Medium risk53 | —-0.074 |
| 127 | 23GB0068CONSTRUCTION OF BRIDGE INCLUDING ROAD APPROACHES ALONG NASULI-VILVAR ROAD | Region VI | Antique DEO | Completed | ₱69.1M | 100% | Medium risk53 | —-0.066 |
| 128 | 17GH0052WIDENING OF BRIDGE - PANI-AN BR. (B00220PN) ALONG ILOILO EAST COAST-ESTANCIA WHARF RD, ESTANCIA, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱20.3M | 100% | Medium risk53 | —-0.027 |
| 129 | 22GG0168CONSTRUCTION OF ALIMONO BRIDGE AT BARANGAY ALIMONO, PASSI CITY | Region VI | Iloilo 2nd DEO | Completed | ₱57.9M | 100% | Medium risk53 | —-0.041 |
| 130 | 18GB0036ROAD OPENING: ACCESS ROAD LEADING TO LIPATA PORT, INCLUDING ROW, ANTIQUE | Region VI | Antique DEO | Completed | ₱64M | 100% | Medium risk53 | —-0.078 |
| 131 | 18GH0117CONSTRUCTION OF CONCRETE ROAD - NRJ BATAD-LUMBIA-TANZA-ESTANCIA ROAD LEADING TO GIGANTES ISLANDS, CARLES, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱66.5M | 100% | Medium risk53 | —-0.079 |
| 132 | 23GB0133RECONSTRUCTION/IMPROVEMENT OF PALIWAN BRIDGE (B00333PN) ALONG ILOILO-ANTIQUE RD. BUGASONG, ANTIQUE | Region VI | Antique DEO | Completed | ₱66.4M | 100% | Medium risk53 | —-0.044 |
| 133 | 18GB0169WIDENING OF BRIDGE: MALANDOG BRIDGE (B00312PN) ALONG ILOILO - ANTIQUE ROAD, INCLUDING ROW, SAN JOSE, ANTIQUE, | Region VI | Antique DEO | Completed | ₱73.7M | 100% | Medium risk53 | —-0.035 |
| 134 | 22GD0048CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITY ALONG PANAY/MAMBUSAO RIVER BASIN, JEBACCA RIVER CONTROL, MAAYON, CAPIZ | Region VI | Capiz 1st DEO | Completed | ₱57.9M | 100% | Medium risk53 | —-0.061 |
| 135 | 20GD0059CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - RECONSTRUCTION OF TICO RIVER CONTROL (DOWNSTREAM), PANAY, CAPIZ | Region VI | Capiz 1st DEO | Completed | ₱63.6M | 100% | Medium risk53 | —-0.062 |
| 136 | 20GH0057ROAD WIDENING - ALONG SARA-CONCEPCION RD (S00238PN) - K0210+776 - K0212+085, K0216+836 - K0218+128, SARA AND CONCEPCION, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱68.4M | 100% | Medium risk53 | —-0.077 |
| 137 | 24GH0042REHABILITATION/MAJOR REPAIR OF FLOOD CONTROL STRUCTURE- REHABILITATION OF SEAWALL, BARANGAY POBLACION, CARLES ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱59.3M | 100% | Medium risk53 | —-0.032 |
| 138 | 24G00105COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS - SAN JOAQUIN SUPER HEALTH CENTER, ILOILO | Region VI | Region VI | On-Going | ₱5.9M | 98% | Medium risk53 | Flagged0.013 |
| 139 | 19GF0013CONSTRUCTION OF NEW PERMANENT BRIDGES - BACAUAN BR.2 (B00134PN) ALONG ILOILO - ANTIQUE ROAD, MIAG-AO, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱58.2M | 100% | Medium risk53 | —-0.044 |
| 140 | 22GD0033CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, BALATUCAN RIVER CONTROL, PANITAN, CAPIZ | Region VI | Capiz 1st DEO | Completed | ₱62.7M | 100% | Medium risk53 | —-0.068 |
| 141 | 19GJ0111RETROFITTING/STRENGTHENING OF BRIDGE - DUNGON BR. 1 (B00537PN) ALONG SEN. BENIGNO S. AQUINO, JR. AVE. | Region VI | Iloilo City DEO | Completed | ₱61M | 100% | Medium risk53 | —-0.048 |
| 142 | 24GP0039CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY POBLACION ILAYA, DAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱78.6M | 98% | Medium risk53 | —-0.028 |
| 143 | 22GP0050CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, POBLACION SUR-DAYHAGON, SIGMA, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱63M | 100% | Medium risk53 | —-0.053 |
| 144 | 23GP0017CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BRGY. POBLACION ILAYA TO BRGY. POBLACION ILAWOD, DAO, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱71.4M | 100% | Medium risk53 | —-0.061 |
| 145 | 23GJ0023CONSTRUCTION OF OTHER BUILDING - CONSTRUCTION OF DPWH ILOILO CITY DEO BUILDING, BRGY. SOOC, AREVALO, ILOILO CITY | Region VI | Iloilo City DEO | On-Going | ₱48.9M | 65% | Medium risk53 | —-0.018 |
| 146 | 18GG0046ROAD CONCRETING OF BRGY. IMBANG GRANDE TO PUNONG ROAD NRJ, INCL. BRIDGE, CONNECTING TO PHILIPPINE RURAL DEVELOPMENT PROJECTS ROAD IN SUPPORT OF SUGAR INDUSTRY, STA. 0 + 000 - STA. 1 + 636.34; STA. 2 + 171.5 - STA. 3 + 105; STA. 3 + 340 - STA. 3 + 547.9; | Region VI | Iloilo 2nd DEO | Completed | ₱63.5M | 100% | Medium risk53 | —-0.069 |
| 147 | 20GJ0019CONSTRUCTION OF OTHER BUILDING - CONSTRUCTION OF COAST GUARD HEADQUARTERS DISTRICT OFFICE BUILDING, WESTERN VISAYAS | Region VI | Iloilo City DEO | Completed | ₱49M | 100% | Medium risk53 | —-0.074 |
| 148 | 23GG0113CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ILOILO - CAPIZ RD. (OLD ROUTE) ( S00216PN) - K0059 + 578 - K0059 + 679, K0059 + 890 - K0060 + 065, K0063 + 090 - K0063 + 142, K0065 + 400 - K0065 + 460, K0065 + 545 - K0065 + 614, K0065 + 710 - K0065 + 769 | Region VI | Iloilo 2nd DEO | Completed | ₱73.7M | 100% | Medium risk53 | —-0.079 |
| 149 | 22GG0170REPAIR/REHABILITATION OF DINGLE BRIDGE ALONG POB. DINGLE-CAMABUGAN ROAD, DINGLE, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱57M | 100% | Medium risk53 | —-0.039 |
| 150 | 22GH0077CONSTRUCTION OF MULTI-PURPOSE BUILDING (HALL OF JUSTICE BUILDING), POBLACION, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱49M | 100% | Medium risk53 | —-0.066 |