132 projects on file, including joint ventures this contractor is part of.
Total projects
132
Total budget
₱8.8B
Average progress
96.8%
Completion rate
86.4%
Average risk score
53.2
Medium risk on average, out of 100
Flagged as unusual
4
3.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 73 | ₱4.1B | 52.0 | 3 | 95.2% |
| Cordillera Administrative Region | 57 | ₱4.5B | 54.7 | 1 | 98.6% |
| Region II | 1 | ₱95.6M | 55.8 | 0 | 100.0% |
| Region III | 1 | ₱148.5M | 53.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 87 | ₱5.8B | 50.5 | 1 | 97.4% |
| Bridges | 16 | ₱1B | 53.4 | 0 | 100.0% |
| Flood Control and Drainage | 14 | ₱1B | 54.0 | 0 | 96.6% |
| OTHER | 8 | ₱403.3M | 74.7 | 1 | 96.3% |
| Buildings and Facilities | 3 | ₱155.4M | 42.2 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱299.6M | 94.0 | 2 | 65.2% |
| Bridges, Roads | 1 | ₱93.7M | 62.2 | 0 | 45.2% |
| Water Provision and Storage | 1 | ₱7.4M | 46.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00445PREVENTIVE MAINTENANCE - PRIMARY ROADS, RABON-DAMORTIS RD - K0404 + (-920) - K0404 + (-841), K0404+ (778) - K0404 + 332, K0404 + 332-K0404 + 734, K0404 + 755 - K0404 + 809, K0404 +809 - K0405 +353, K0405+384 - K0407 + 056 | Region I | Region I | On-Going | ₱149.8M | 80% | High risk94 | Flagged0.018 |
| 25A00448PREVENTIVE MAINTENANCE- TERTIARY ROADS, SN FERNANDO-BAGULIN RD-CHAINAGE 0 TO CHAINAGE 2680 AND CHAINAGE 3632 TO CHAINAGE 4885 | Region I | Region I | On-Going | ₱149.8M | 50% | High risk94 | Flagged0.029 |
| 23PM0039CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF PARACELIS-TABUK-MALIG ROAD, P | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱96.5M | 100% | High risk82 | —-0.012 |
| 24A00301CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD - K0501 + 715 | Region I | Region I | On-Going | ₱4.8M | 0% | High risk79 | Flagged0.013 |
| 24PM0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MULIANG BRIDGE A | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱72.4M | 74% | High risk78 | Flagged0.013 |
| 24A00491CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD - K0518 + 032 | Region I | Region I | On-Going | ₱9.4M | 54% | High risk76 | —-0.004 |
| 20PI0078CHICO KARAYAN BRIDGE-LANAO-TIKITIK BYPASS ROAD, PACKAGE B, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱57.3M | 100% | High risk74 | —-0.022 |
| 21PI0083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CHICO KARAYAN BRIDGE - LANAO - TIKITIK BYPASS ROAD, PACKAGE C, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱55.8M | 100% | High risk74 | —-0.023 |
| 25PI0025CSSP-TRIP, BONTOC-MAINIT-SAGADA ROAD LEADING TO GUINA-ANG RICE TERRACES, MAINIT HOTSPRINGS, BOMOD-OK FALLS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | On-Going | ₱12.5M | 96% | High risk73 | —-0.000 |
| 20PI0077CHICO KARAYAN BRIDGE-LANAO-TIKITIK BYPASS ROAD, PACKAGE A, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱49M | 100% | High risk73 | —-0.023 |
| 24PI0012CSSP-TRIP, BONTOC-MAINIT-SAGADA ROAD LEADING TO GUINA-ANG RICE TERRACES, MAINIT HOTSPRINGS, BOMOD-OK FALLS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱19.6M | 100% | High risk73 | —-0.025 |
| 21PI0036BONTOC - MAINIT - SAGADA ROAD LEADING TO GUINA-ANG RICE TERRACES, MAINIT HOTSPRINGS, BOMOD-OK FALLS, MOUNTAIN PROVINCE, PACKAGE II | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱40.3M | 100% | High risk72 | —-0.021 |
| 17A00023REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, CERVANTES-MANKAYAN-ABATAN RD, K0 384+301 - K0 384+526; K0 384+850 - K0 384+1080; K0 385+300 - K0 385+360; K0 385+900 - K0 386+260;K0 390+000 - 390+200;K0 390+320 - | Region I | Region I | Completed | ₱90.2M | 100% | High risk67 | —-0.041 |
| 16AD0177CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF GROUNDSILL OF KATKATENG BRIDGE ALONG CERVANTES-QUIRINO ROAD,CERVANTES, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱27.9M | 100% | High risk66 | —-0.042 |
| 20AD0034JCT SANTIAGO-BANAYOYO-LIDLIDDA-SN EMILIO-QUIRINO RD - K0386 + 700 - K0386 + 800 | Region I | Ilocos Sur 2nd DEO | Completed | ₱24.4M | 100% | High risk65 | —-0.052 |
| 16AD0162ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS), CERVANTES-BONTOC ROAD, K0387+503-K0388+140 | Region I | Ilocos Sur 2nd DEO | Completed | ₱18.8M | 100% | High risk65 | —-0.054 |
| 16AD0145REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, CERVANTES-QUIRINO ROAD, K0395+200-K0395+350 | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.7M | 100% | High risk65 | —-0.052 |
| 16AD0176REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4) CERVANTES-BUNTOC ROAD, K0384+(-853)-K0384+(-453) | Region I | Ilocos Sur 2nd DEO | Completed | ₱11.1M | 100% | High risk64 | —-0.055 |
| 25A00022CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | Region I | On-Going | ₱145.1M | 91% | High risk64 | —-0.013 |
| 25A00021CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | Region I | On-Going | ₱145.1M | 89% | High risk64 | —-0.013 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00448PREVENTIVE MAINTENANCE- TERTIARY ROADS, SN FERNANDO-BAGULIN RD-CHAINAGE 0 TO CHAINAGE 2680 AND CHAINAGE 3632 TO CHAINAGE 4885 | Region I | Region I | On-Going | ₱149.8M | 50% | High risk94 | Flagged0.029 |
| 25A00445PREVENTIVE MAINTENANCE - PRIMARY ROADS, RABON-DAMORTIS RD - K0404 + (-920) - K0404 + (-841), K0404+ (778) - K0404 + 332, K0404 + 332-K0404 + 734, K0404 + 755 - K0404 + 809, K0404 +809 - K0405 +353, K0405+384 - K0407 + 056 | Region I | Region I | On-Going | ₱149.8M | 80% | High risk94 | Flagged0.018 |
| 24PM0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MULIANG BRIDGE A | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱72.4M | 74% | High risk78 | Flagged0.013 |
| 24A00301CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD - K0501 + 715 | Region I | Region I | On-Going | ₱4.8M | 0% | High risk79 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25A00169CONSTRUCTION OF MISSING LINKS/ NEW ROADS - ALILEM-SUGPON (ILOCOS SUR) - BAKUN (BENGUET) ROAD, ILOCOS SUR (PACKAGE 6) | Region I | Region I | On-Going | ₱93.7M | 45% | High risk62 | —-0.017 |
| 27 | 19P00010ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES, LUNAS BRIDGE (B04258LZ) ALONG JCT. TALUBIN - BARLIG - NATONIN - PARACELIS - CALACCAD ROAD | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱128M | 100% | High risk62 | —-0.029 |
| 28 | 21P00088LOCAL PROGRAM: CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES CONSTRUCTION OF CARUMSING BRIDGE, CARUMSING, DANGTALAN, PASIL, KALINGA | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱98.4M | 100% | High risk62 | —-0.028 |
| 29 | 21A00115CONSTRUCTION OF MISSING LINKS/ NEW ROADS - CERVANTES- QUIRINO (ILOCOS SUR)-ABRA ROAD, ILOCOS SUR | Region I | Region I | Completed | ₱101.3M | 100% | High risk61 | —-0.033 |
| 30 | 20P00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES MARAT BRIDGE (B00989LZ) ALONG JCT. TALUBIN - BARLIG - NATONIN - PARACELIS - CALACCAD ROAD (S005594LZ) | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱111.3M | 100% | High risk61 | —-0.027 |
| 31 | 17PK0003ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM4 PROJECT ANALYSIS | Cordillera Administrative Region | Upper Kalinga DEO | Terminated | ₱18.5M | 100% | High risk61 | —-0.009 |
| 32 | 17PI0043DISASTER RELATED AND EMERGENCY REHABILITATION FUND - REPAIR/REHABILITATION/RESTORATION OF ROAD CUT ALONG JUNCT. TALUBIN-BARLIG-NAT.-PAR.-CALACCAD ROAD, LUBO.TALUBIN K0378+500-K0378+550 DAMAGED BY TYPHOON LANDO | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱7.5M | 100% | High risk60 | —-0.048 |
| 33 | 24P00005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MT. PROVINCE - N VIZCAYA RD - K0363+(-785) - K0372+1019, K0372+1041 - K0375+000BONTOC, MT. PROVINCE | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱193M | 97% | Medium risk60 | —-0.019 |
| 34 | 17PI0038ASSET PRESERV OF NATL RDS-REHAB/RECONST OF NATL RDS, SLOPE COLLAPSE & LANDLSIDE-JCT TAL-BAR-PAR-CAL RD | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱33.6M | 100% | Medium risk60 | —-0.048 |
| 35 | 24P00004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MT. PROVINCE - N VIZCAYA RD - K0375+000 - K0375+806, K0375+829 - K0379+300, K0380+060 - K0383+087, K0383+581 | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱144.8M | 98% | Medium risk60 | —-0.027 |
| 36 | 21P00078CLUSTER: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS MT. PROVINCE - CAGAYAN VIA TABUK - ENRILE R | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱289.5M | 100% | Medium risk59 | —-0.042 |
| 37 | 24P00002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MT. PROVINCE - ILOCOS SUR VIA TUE RD, K0387+(-081) - K0388+189, K0388+227 - K0388+867, K0388+939 - K0388+1069 | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱193M | 100% | Medium risk59 | —-0.022 |
| 38 | 18P00033CONVERGENCE AND SPECIAL SUPPORT PROGRAM : CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - GUISSET-BINGA-BALOY-TINONGDAN ROAD LEADING TO BINGA DAM AND MT. UGO, SITE FOR THE INTERNATIONAL SKY RUNNING EVENT | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱140.3M | 100% | Medium risk59 | —-0.061 |
| 39 | 24P00001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MT. PROV - ILOCOS SUR VIA KAYAN RD - K0386+(-034) - K0394+349KAYAN, TADIAN, MT. PROVINCE | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | Medium risk59 | —-0.061 |
| 40 | 20P00028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS KENNON ROADKO235+410 - KO235+480KO235+834 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱163.3M | 100% | Medium risk58 | —-0.059 |
| 41 | 22P00009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLISTT O | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.048 |
| 42 | 22P00008ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A OF BLISTT O | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.049 |
| 43 | 22P00006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A OF BLISTT O | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱164.1M | 100% | Medium risk58 | —-0.057 |
| 44 | 21P00025ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS, KENNON ROAD - K0222 + 112 - K0222 + 260TUBA, BEN | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.050 |
| 45 | 25A00113CONSTRUCTION OF MISSING LINKS/ NEW ROADS - CERVANTES - QUIRINO (ILOCOS SUR) - ABRA ROAD, ILOCOS SUR (PACKAGE 5) | Region I | Region I | On-Going | ₱93.6M | 80% | Medium risk58 | —-0.036 |
| 46 | 21P00077ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLIS | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱284.7M | 100% | Medium risk58 | —-0.046 |
| 47 | 20P00017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A) | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱235.1M | 100% | Medium risk58 | —-0.048 |
| 48 | 25A00170CONSTRUCTION OF MISSING LINKS/ NEW ROADS, CERVANTES (ILOCOS SUR) - BESAO-SAGADA VIA LAYLAYA ROAD, ILOCOS SUR (PACKAGE 5) | Region I | Region I | On-Going | ₱93.6M | 88% | Medium risk58 | —-0.038 |
| 49 | 24A00061CONSTRUCTION OF MISSING LINKS/ NEW ROADS, CERVANTES (ILOCOS SUR) - BESAO-SAGADA VIA LAYLAYA ROAD, ILOCOS SUR (PACKAGE 4) | Region I | Region I | Completed | ₱154.4M | 100% | Medium risk57 | —-0.059 |
| 50 | 24A00051CONSTRUCTION OF MISSING LINKS / NEW ROADS, ALILEM - SUGPON (ILOCOS SUR) - BAKUN (BENGUET) ROAD, PACKAGE 5, ILOCOS SUR | Region I | Region I | Completed | ₱154.4M | 100% | Medium risk57 | —-0.063 |