Contractor dossier
132 projects on file, including joint ventures this contractor is part of.
Total projects
132
Total budget
₱8.8B
Average progress
96.8%
Completion rate
86.4%
Average risk score
53.2
Medium risk on average, out of 100
Flagged as unusual
4
3.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 73 | ₱4.1B | 52.0 | 3 | 95.2% |
| Cordillera Administrative Region | 57 | ₱4.5B | 54.7 | 1 | 98.6% |
| Region II | 1 | ₱95.6M | 55.8 | 0 | 100.0% |
| Region III | 1 | ₱148.5M | 53.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 87 | ₱5.8B | 50.5 | 1 | 97.4% |
| Bridges | 16 | ₱1B | 53.4 | 0 | 100.0% |
| Flood Control and Drainage | 14 | ₱1B | 54.0 | 0 | 96.6% |
| OTHER | 8 | ₱403.3M | 74.7 | 1 | 96.3% |
| Buildings and Facilities | 3 | ₱155.4M | 42.2 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱299.6M | 94.0 | 2 | 65.2% |
| Bridges, Roads | 1 | ₱93.7M | 62.2 | 0 | 45.2% |
| Water Provision and Storage | 1 | ₱7.4M | 46.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00445PREVENTIVE MAINTENANCE - PRIMARY ROADS, RABON-DAMORTIS RD - K0404 + (-920) - K0404 + (-841), K0404+ (778) - K0404 + 332, K0404 + 332-K0404 + 734, K0404 + 755 - K0404 + 809, K0404 +809 - K0405 +353, K0405+384 - K0407 + 056 | Region I | Region I | On-Going | ₱149.8M | 80% | High risk94 | Flagged0.018 |
| 25A00448PREVENTIVE MAINTENANCE- TERTIARY ROADS, SN FERNANDO-BAGULIN RD-CHAINAGE 0 TO CHAINAGE 2680 AND CHAINAGE 3632 TO CHAINAGE 4885 | Region I | Region I | On-Going | ₱149.8M | 50% | High risk94 | Flagged0.029 |
| 23PM0039CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF PARACELIS-TABUK-MALIG ROAD, P | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱96.5M | 100% | High risk82 | —-0.012 |
| 24A00301CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD - K0501 + 715 | Region I | Region I | On-Going | ₱4.8M | 0% | High risk79 | Flagged0.013 |
| 24PM0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MULIANG BRIDGE A | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱72.4M | 74% | High risk78 | Flagged0.013 |
| 24A00491CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD - K0518 + 032 | Region I | Region I | On-Going | ₱9.4M | 54% | High risk76 | —-0.004 |
| 20PI0078CHICO KARAYAN BRIDGE-LANAO-TIKITIK BYPASS ROAD, PACKAGE B, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱57.3M | 100% | High risk74 | —-0.022 |
| 21PI0083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CHICO KARAYAN BRIDGE - LANAO - TIKITIK BYPASS ROAD, PACKAGE C, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱55.8M | 100% | High risk74 | —-0.023 |
| 25PI0025CSSP-TRIP, BONTOC-MAINIT-SAGADA ROAD LEADING TO GUINA-ANG RICE TERRACES, MAINIT HOTSPRINGS, BOMOD-OK FALLS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | On-Going | ₱12.5M | 96% | High risk73 | —-0.000 |
| 20PI0077CHICO KARAYAN BRIDGE-LANAO-TIKITIK BYPASS ROAD, PACKAGE A, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱49M | 100% | High risk73 | —-0.023 |
| 24PI0012CSSP-TRIP, BONTOC-MAINIT-SAGADA ROAD LEADING TO GUINA-ANG RICE TERRACES, MAINIT HOTSPRINGS, BOMOD-OK FALLS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱19.6M | 100% | High risk73 | —-0.025 |
| 21PI0036BONTOC - MAINIT - SAGADA ROAD LEADING TO GUINA-ANG RICE TERRACES, MAINIT HOTSPRINGS, BOMOD-OK FALLS, MOUNTAIN PROVINCE, PACKAGE II | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱40.3M | 100% | High risk72 | —-0.021 |
| 17A00023REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, CERVANTES-MANKAYAN-ABATAN RD, K0 384+301 - K0 384+526; K0 384+850 - K0 384+1080; K0 385+300 - K0 385+360; K0 385+900 - K0 386+260;K0 390+000 - 390+200;K0 390+320 - | Region I | Region I | Completed | ₱90.2M | 100% | High risk67 | —-0.041 |
| 16AD0177CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF GROUNDSILL OF KATKATENG BRIDGE ALONG CERVANTES-QUIRINO ROAD,CERVANTES, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱27.9M | 100% | High risk66 | —-0.042 |
| 20AD0034JCT SANTIAGO-BANAYOYO-LIDLIDDA-SN EMILIO-QUIRINO RD - K0386 + 700 - K0386 + 800 | Region I | Ilocos Sur 2nd DEO | Completed | ₱24.4M | 100% | High risk65 | —-0.052 |
| 16AD0162ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS), CERVANTES-BONTOC ROAD, K0387+503-K0388+140 | Region I | Ilocos Sur 2nd DEO | Completed | ₱18.8M | 100% | High risk65 | —-0.054 |
| 16AD0145REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, CERVANTES-QUIRINO ROAD, K0395+200-K0395+350 | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.7M | 100% | High risk65 | —-0.052 |
| 16AD0176REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4) CERVANTES-BUNTOC ROAD, K0384+(-853)-K0384+(-453) | Region I | Ilocos Sur 2nd DEO | Completed | ₱11.1M | 100% | High risk64 | —-0.055 |
| 25A00022CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | Region I | On-Going | ₱145.1M | 91% | High risk64 | —-0.013 |
| 25A00021CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | Region I | On-Going | ₱145.1M | 89% | High risk64 | —-0.013 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00448PREVENTIVE MAINTENANCE- TERTIARY ROADS, SN FERNANDO-BAGULIN RD-CHAINAGE 0 TO CHAINAGE 2680 AND CHAINAGE 3632 TO CHAINAGE 4885 | Region I | Region I | On-Going | ₱149.8M | 50% | High risk94 | Flagged0.029 |
| 25A00445PREVENTIVE MAINTENANCE - PRIMARY ROADS, RABON-DAMORTIS RD - K0404 + (-920) - K0404 + (-841), K0404+ (778) - K0404 + 332, K0404 + 332-K0404 + 734, K0404 + 755 - K0404 + 809, K0404 +809 - K0405 +353, K0405+384 - K0407 + 056 | Region I | Region I | On-Going | ₱149.8M | 80% | High risk94 | Flagged0.018 |
| 24PM0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MULIANG BRIDGE A | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱72.4M | 74% | High risk78 | Flagged0.013 |
| 24A00301CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD - K0501 + 715 | Region I | Region I | On-Going | ₱4.8M | 0% | High risk79 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23PM0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF AGUINALDO-NATONIN ROAD, NATON | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.072 |
| 52 | 24A00282REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, REHABILITATION OF TAGUDIN-CERVANTES RD. K0357+200 - K0357+230, K0358+550 - K0358+590, K0361+(-30) - K0361+070, K0363+120 - K0363+190 | Region I | Region I | Completed | ₱120.6M | 100% | Medium risk56 | —-0.071 |
| 53 | 23A00277BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD, CERVANTES - QUIRINO (ILOCOS SUR) - ABRA ROAD, ILOCOS SUR (PACKAGE 3) | Region I | Region I | Completed | ₱99M | 100% | Medium risk56 | —-0.070 |
| 54 | 20A00169LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS - CERVANTES(ILOCOS SUR)-BESAO-SAGADA VIA LAYLAYA ROAD | Region I | Region I | Completed | ₱99M | 100% | Medium risk56 | —-0.070 |
| 55 | 23A00262BASIC INFRASTRUCTURE PROGRAM, CONSTRUCTION OF ROAD, CERVANTES (ILOCOS SUR) - BESAO-SAGADA VIA LAYLAYA ROAD, ILOCOS SUR (PACKAGE 3) | Region I | Region I | Completed | ₱99M | 100% | Medium risk56 | —-0.070 |
| 56 | 18B00041CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONST'N/IMPV'T OF ACCESS ROADS LEADING DECLARED TOURISM DESTINATIONS-JCT. DAANG MAHARLIKA-MASOC-AMBAGUIO ROAD LEADING TO MT. PULAG NATIONAL PARK, AMBAGUIO, NUEVA VIZCAYA | Region II | Region II | Completed | ₱95.6M | 100% | Medium risk56 | —-0.065 |
| 57 | 24A00281REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, REHABILITATION OF TAGUDIN-CERVANTES ROAD K0355+000 - K0355+120 | Region I | Region I | Completed | ₱96.5M | 100% | Medium risk56 | —-0.076 |
| 58 | 22A00301CONSTRUCTION OF MISSING LINKS/ NEW ROADS - ALILEM-SUGPON (ILOCOS SUR) - BAKUN (BENGUET) ROAD, ILOCOS SUR (PACKAGE 3) | Region I | Region I | Completed | ₱96.4M | 100% | Medium risk56 | —-0.074 |
| 59 | 20A00167LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, ALILEM-SUGPON (ILOCOS SUR) - BAKUN (BENGUET) ROAD | Region I | Region I | Completed | ₱99M | 100% | Medium risk56 | —-0.072 |
| 60 | 23A00278BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD - ALILEM-SUGPON (ILOCOS SUR) - BAKUN (BENGUET) ROAD, ILOCOS SUR (PACKAGE 4) | Region I | Region I | Completed | ₱99M | 100% | Medium risk56 | —-0.074 |
| 61 | 23PK0058ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS: KALINGA - ABRA RD - K0500+656 - 500+683, BALBALAN, KALI | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱57.8M | 100% | Medium risk55 | —-0.076 |
| 62 | 23A00264PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO - BAGUIO CITY RD - K0237+(-885) - K0237+(-810), K0237 + 000 - K0237 + 885, K0238 + 000 - K0238 + 159, K0240 + 937 - K0241 + 000, K0241 + 234 - K0242 + 610, K0242 + 960 - K0243 + 226, K0243 + 596 - K0244 + 11 | Region I | Region I | Completed | ₱156.3M | 100% | Medium risk55 | —-0.064 |
| 63 | 21P00009ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIP, SLOPE COLLAPSE AND LANDSLIDES - PRIMARY ROADS, KENNON ROADKO239+297 - KO239+380 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱91.1M | 100% | Medium risk54 | —-0.076 |
| 64 | 23CH0102CONSTRUCTION OF MULTI-PURPOSE BUILDING (NEW MUNICIPAL BUILDING) INCLUDING SITE DEVELOPMENT, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱148.5M | 100% | Medium risk53 | —-0.069 |
| 65 | 22PI0048CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CHICO KARAYAN BRIDGE - LANAO - TIKITIK BYPASS ROAD, PACKAGE D, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱71.8M | 100% | Medium risk53 | —-0.078 |
| 66 | 24PI0058OO1-COSNTRUCTION OF BY-PASS AND DIVERSION ROADS, CHICO KARAYAN BRIDGE-LANAO-TIKITIK BYPASS ROAD | Cordillera Administrative Region | Mountain Province 1st DEO | On-Going | ₱66.9M | 80% | Medium risk53 | —-0.038 |
| 67 | 18PI0021CSSP-CONSTN/IMPVT OF ACCESS RDS TO TOURISM, BONTOC-MAINIT-SAGADA RD | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱60.8M | 100% | Medium risk53 | —-0.079 |
| 68 | 23PM0018CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DULI FLOOD CONTROL, STA. 123 + 580 - STA. 123 + 680 (R.S.), STA. 123 + 800 - STA. 124 + 350 (R.S.), BUNOT, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱62.7M | 100% | Medium risk52 | —-0.063 |
| 69 | 17PK0036REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BONOG BR(B00954LZ) ALONG MT. PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱14.5M | 100% | Medium risk52 | —-0.006 |
| 70 | 23PI0080CONSTRUCTION OF CALUTTIT-PAKKIL FLOOD CONTROL; STA. 28+242-STA. 28+440 (L.S.) ALONG CHICO RIVER, BONTOC, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱77.2M | 100% | Medium risk52 | —-0.063 |
| 71 | 24A00054CONSTRUCTION OF MISSING LINKS/ NEW ROADS, CERVANTES (ILOCOS SUR) - BESAO-SAGADA VIA LAYLAYA ROAD, ILOCOS SUR | Region I | Region I | Completed | ₱86.8M | 100% | Medium risk52 | —-0.073 |
| 72 | 20PC0024CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF MARAG FLOOD CONTROL MARAG, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.061 |
| 73 | 22PC0032CONV. AND SPECIAL SUPPORT PROG.-CONS./IMPR. OF ACCESS RDS LEADING TO DECLARED TOURISM DEST.(TRIP) SAN ISIDRO SUR-POBLACION-LAPPA-MARAG-CADACLAN-SALAGUNTING TOURISM RD LEADING TO MANACOTA UNDERGROUND RIVER AND OTHER TOURISM AREAS, BRGY. CADACLAN, CALANASAN | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱81.1M | 100% | Medium risk51 | —-0.031 |
| 74 | 18PE0036CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ITOGON - DALUPIRIP - SN. MANUEL BDRY ROAD, K0275+504 - K0275+852, ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱70.5M | 100% | Medium risk51 | —-0.080 |
| 75 | 22PC0045NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS NEW ROADS ADAMS (ILOCOS NORTE) - CALANASAN (APAYAO) ROAD, PAGGA BRIDGE, APAYAO - CONSTRUCTION OF CONCRETE BRIDGE | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱19M | 100% | Medium risk51 | —-0.033 |