Contractor dossier
132 projects on file, including joint ventures this contractor is part of.
Total projects
132
Total budget
₱8.8B
Average progress
96.8%
Completion rate
86.4%
Average risk score
53.2
Medium risk on average, out of 100
Flagged as unusual
4
3.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 73 | ₱4.1B | 52.0 | 3 | 95.2% |
| Cordillera Administrative Region | 57 | ₱4.5B | 54.7 | 1 | 98.6% |
| Region II | 1 | ₱95.6M | 55.8 | 0 | 100.0% |
| Region III | 1 | ₱148.5M | 53.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 87 | ₱5.8B | 50.5 | 1 | 97.4% |
| Bridges | 16 | ₱1B | 53.4 | 0 | 100.0% |
| Flood Control and Drainage | 14 | ₱1B | 54.0 | 0 | 96.6% |
| OTHER | 8 | ₱403.3M | 74.7 | 1 | 96.3% |
| Buildings and Facilities | 3 | ₱155.4M | 42.2 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱299.6M | 94.0 | 2 | 65.2% |
| Bridges, Roads | 1 | ₱93.7M | 62.2 | 0 | 45.2% |
| Water Provision and Storage | 1 | ₱7.4M | 46.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00445PREVENTIVE MAINTENANCE - PRIMARY ROADS, RABON-DAMORTIS RD - K0404 + (-920) - K0404 + (-841), K0404+ (778) - K0404 + 332, K0404 + 332-K0404 + 734, K0404 + 755 - K0404 + 809, K0404 +809 - K0405 +353, K0405+384 - K0407 + 056 | Region I | Region I | On-Going | ₱149.8M | 80% | High risk94 | Flagged0.018 |
| 25A00448PREVENTIVE MAINTENANCE- TERTIARY ROADS, SN FERNANDO-BAGULIN RD-CHAINAGE 0 TO CHAINAGE 2680 AND CHAINAGE 3632 TO CHAINAGE 4885 | Region I | Region I | On-Going | ₱149.8M | 50% | High risk94 | Flagged0.029 |
| 23PM0039CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF PARACELIS-TABUK-MALIG ROAD, P | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱96.5M | 100% | High risk82 | —-0.012 |
| 24A00301CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD - K0501 + 715 | Region I | Region I | On-Going | ₱4.8M | 0% | High risk79 | Flagged0.013 |
| 24PM0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MULIANG BRIDGE A | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱72.4M | 74% | High risk78 | Flagged0.013 |
| 24A00491CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD - K0518 + 032 | Region I | Region I | On-Going | ₱9.4M | 54% | High risk76 | —-0.004 |
| 20PI0078CHICO KARAYAN BRIDGE-LANAO-TIKITIK BYPASS ROAD, PACKAGE B, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱57.3M | 100% | High risk74 | —-0.022 |
| 21PI0083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CHICO KARAYAN BRIDGE - LANAO - TIKITIK BYPASS ROAD, PACKAGE C, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱55.8M | 100% | High risk74 | —-0.023 |
| 25PI0025CSSP-TRIP, BONTOC-MAINIT-SAGADA ROAD LEADING TO GUINA-ANG RICE TERRACES, MAINIT HOTSPRINGS, BOMOD-OK FALLS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | On-Going | ₱12.5M | 96% | High risk73 | —-0.000 |
| 20PI0077CHICO KARAYAN BRIDGE-LANAO-TIKITIK BYPASS ROAD, PACKAGE A, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱49M | 100% | High risk73 | —-0.023 |
| 24PI0012CSSP-TRIP, BONTOC-MAINIT-SAGADA ROAD LEADING TO GUINA-ANG RICE TERRACES, MAINIT HOTSPRINGS, BOMOD-OK FALLS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱19.6M | 100% | High risk73 | —-0.025 |
| 21PI0036BONTOC - MAINIT - SAGADA ROAD LEADING TO GUINA-ANG RICE TERRACES, MAINIT HOTSPRINGS, BOMOD-OK FALLS, MOUNTAIN PROVINCE, PACKAGE II | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱40.3M | 100% | High risk72 | —-0.021 |
| 17A00023REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, CERVANTES-MANKAYAN-ABATAN RD, K0 384+301 - K0 384+526; K0 384+850 - K0 384+1080; K0 385+300 - K0 385+360; K0 385+900 - K0 386+260;K0 390+000 - 390+200;K0 390+320 - | Region I | Region I | Completed | ₱90.2M | 100% | High risk67 | —-0.041 |
| 16AD0177CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF GROUNDSILL OF KATKATENG BRIDGE ALONG CERVANTES-QUIRINO ROAD,CERVANTES, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱27.9M | 100% | High risk66 | —-0.042 |
| 20AD0034JCT SANTIAGO-BANAYOYO-LIDLIDDA-SN EMILIO-QUIRINO RD - K0386 + 700 - K0386 + 800 | Region I | Ilocos Sur 2nd DEO | Completed | ₱24.4M | 100% | High risk65 | —-0.052 |
| 16AD0162ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS), CERVANTES-BONTOC ROAD, K0387+503-K0388+140 | Region I | Ilocos Sur 2nd DEO | Completed | ₱18.8M | 100% | High risk65 | —-0.054 |
| 16AD0145REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, CERVANTES-QUIRINO ROAD, K0395+200-K0395+350 | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.7M | 100% | High risk65 | —-0.052 |
| 16AD0176REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4) CERVANTES-BUNTOC ROAD, K0384+(-853)-K0384+(-453) | Region I | Ilocos Sur 2nd DEO | Completed | ₱11.1M | 100% | High risk64 | —-0.055 |
| 25A00022CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | Region I | On-Going | ₱145.1M | 91% | High risk64 | —-0.013 |
| 25A00021CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | Region I | On-Going | ₱145.1M | 89% | High risk64 | —-0.013 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00448PREVENTIVE MAINTENANCE- TERTIARY ROADS, SN FERNANDO-BAGULIN RD-CHAINAGE 0 TO CHAINAGE 2680 AND CHAINAGE 3632 TO CHAINAGE 4885 | Region I | Region I | On-Going | ₱149.8M | 50% | High risk94 | Flagged0.029 |
| 25A00445PREVENTIVE MAINTENANCE - PRIMARY ROADS, RABON-DAMORTIS RD - K0404 + (-920) - K0404 + (-841), K0404+ (778) - K0404 + 332, K0404 + 332-K0404 + 734, K0404 + 755 - K0404 + 809, K0404 +809 - K0405 +353, K0405+384 - K0407 + 056 | Region I | Region I | On-Going | ₱149.8M | 80% | High risk94 | Flagged0.018 |
| 24PM0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MULIANG BRIDGE A | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱72.4M | 74% | High risk78 | Flagged0.013 |
| 24A00301CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA NORTH ROAD - K0501 + 715 | Region I | Region I | On-Going | ₱4.8M | 0% | High risk79 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 20A00131CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-TAGONGTUNGAW-BAB-ASIG-POBLACION ROAD CONNECTING CERVANTES-TUBO, ABRA NATIONAL ROAD IN SUPPORT TO THE FRUIT AND VEGETABLE PROCESSING AND QUIRINO COFFEE PROCESSING IND | Region I | Region I | Completed | ₱55.2M | 100% | Medium risk51 | —-0.081 |
| 77 | 19AD0025REHABI/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS ALONG JCT. SANTIAGO- BANAYOYO-LIDLIDDA-SAN EMILIO-QUIRINO ROAD, K0372+000-K0372+470, K0373+332-K0374+514, K0375+193-K0375+479, K0375+574-K0375+695, BRGY.TIAGAN, SAN EMILIO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱51.5M | 100% | Medium risk50 | —-0.083 |
| 78 | 23PI0048BIP: CONSTRUCTION OF MULTI-PURPOSE BUILDING, GUINA-ANG, BONTOC, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱5M | 100% | Medium risk49 | —-0.078 |
| 79 | 23A00023CONSTRUCTION OF MISSING LINKS/NEW ROADS, CERVANTES - QUIRINO (ILOCOS SUR) - ABRA ROAD, ILOCOS SUR | Region I | Region I | Completed | ₱38.6M | 100% | Medium risk48 | —-0.049 |
| 80 | 22A00060CONSTRUCTION OF MISSING LINKS/NEW ROADS, CERVANTES - ABRA ROAD, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱28.4M | 100% | Medium risk48 | —-0.050 |
| 81 | 24AF0017CONST./REHAB OF FLOOD MIT. FAC. W/IN MAJOR RIVER BASINS & PRIN. RIVERS - CONST OF FLOOD MIT STRUC. - CONST OF FLOOD CONTROL STRUCTURES ALONG ARINGAY RIVER BASIN, BRGY. CARES, PUGO, LU | Region I | La Union 2nd DEO | Completed | ₱48.7M | 100% | Medium risk48 | —-0.066 |
| 82 | 23AF0001CONST/REHAB OF FLOOD MIT FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST OF FLOOF CNTRL STRUCTURES ALONG ARINGAY RIVER BASIN, BRGYS. AMBALITE, DUPLAS, TAVORA EAST & TAVORA PROPER, PUGO, LU | Region I | La Union 2nd DEO | Completed | ₱48.6M | 100% | Medium risk48 | —-0.067 |
| 83 | 21A00081WIDENING OF PERMANENT BRIDGES, BESSANG BR. (B00636LZ) ALONG TAGUDIN-CERVANTES RD | Region I | Region I | Completed | ₱17.4M | 100% | Medium risk48 | —-0.050 |
| 84 | 23AF0043CONST./MAINTENANCE OF FLOOD MIT. STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF SHORE PROTECTION WORKS, BRGY. CABARUAN, STO. TOMAS, LU | Region I | La Union 2nd DEO | Completed | ₱48.8M | 100% | Medium risk47 | —-0.066 |
| 85 | 23AF0054WIDENING OF PERMANENT BRIDGES, BANI NORTH BR. (B02748LZ), ALONG RABON-DAMORTIS ROAD, ROSARIO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱29.9M | 100% | Medium risk47 | —-0.043 |
| 86 | 20PI0076CONSTN OF WATERWORKS PHASE I, MAINIT AND GUINA-ANG, BONTOC, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱7.4M | 100% | Medium risk46 | —-0.045 |
| 87 | 23PI0065CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CHICO KARAYAN BRIDGE-LANAO-TIKITIK BYPASS ROAD, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱34.3M | 100% | Medium risk46 | —-0.083 |
| 88 | 25PM0005ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD - K0388 + (-160) - K0388+ (040) | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱31.7M | 77% | Medium risk46 | —-0.046 |
| 89 | 23AF0053WIDENING OF PERMANENT BRIDGES, ALIPANG BR. 1 (B00828LZ), ALONG ROSARIO-PUGO ROAD, ROSARIO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱20.5M | 100% | Medium risk46 | —-0.044 |
| 90 | 23AF0057WIDENING OF PERMANENT BRIDGES, AMBANGONAN BR. 2 (B00834LZ), ALONG ROSARIO-PUGO ROAD, PUGO, LAUNION | Region I | La Union 2nd DEO | Completed | ₱20.5M | 100% | Medium risk46 | —-0.045 |
| 91 | 23AD0032FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BESSANG, BURGOS, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.064 |
| 92 | 23AF0049WIDENING OF PERMNANENT BRIDGES, AMBANGONAN BR. 1 (B00833LZ), ALONG ROSARIO-PUGO ROAD, LA UNION | Region I | La Union 2nd DEO | Completed | ₱15.2M | 100% | Medium risk46 | —-0.045 |
| 93 | 22A00075CONSTRUCTION OF MISSING LINKS/ NEW ROADS, CERVANTES (ILOCOS SUR) - BESAO-SAGADA VIA LAYLAYA ROAD, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱29M | 100% | Medium risk46 | —-0.087 |
| 94 | 20PI0097BONTOC - MAINIT - SAGADA ROAD LEADING TO GUINA-ANG RICE TERRACES, MAINIT HOTSPRINGS, BOMOD-OK FALLS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱29M | 100% | Medium risk46 | —-0.084 |
| 95 | 20PI0090CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BONTOC - MAINIT - SAGADA ROAD | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱29M | 100% | Medium risk46 | —-0.084 |
| 96 | 18AD0082CONSTRUCTION OF BARANGAY ROAD POBLACION SPILLWAY, QUIRINO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱36.7M | 100% | Medium risk46 | —-0.083 |
| 97 | 22A00074CONSTRUCTION OF MISSING LINKS/ NEW ROADS - ALILEM-SUGPON (ILOCOS SUR) - BAKUN (BENGUET) ROAD, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱28.9M | 100% | Medium risk46 | —-0.088 |
| 98 | 20AD0022TAGUDIN-CERVANTES RD - K0339 + 200 - K0339 + 300 | Region I | Ilocos Sur 2nd DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.077 |
| 99 | 21AD0025REHABILITATION/RECONSTRUCTION OF ROADS SLIPS, COLLAPSE AND LANDSLIDE- TERTIARY ROAD-JCT. SANTIAGO-BANAYOYO-LIDLIDDA-SAN EMILIO-QUIRINO ROAD,K0386+045-K0386+114, QUIRINO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱24.5M | 100% | Medium risk45 | —-0.085 |
| 100 | 21A00107CONSTRUCTION OF MISSING LINKS/NEW ROADS-CERVANTES (ILOCOS SUR) - BESAO-SAGADA VIA LAYLAYA ROAD, ILOCOS SUR | Region I | Region I | Completed | ₱19.3M | 100% | Medium risk45 | —-0.087 |