Contractor dossier
84 projects on file, including joint ventures this contractor is part of.
Total projects
84
Total budget
₱6.1B
Average progress
82.1%
Completion rate
71.4%
Average risk score
54.7
Medium risk on average, out of 100
Flagged as unusual
8
9.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 52 | ₱3.5B | 54.1 | 1 | 93.8% |
| Region III | 25 | ₱1.9B | 49.9 | 3 | 59.5% |
| Region I | 3 | ₱284.9M | 89.7 | 3 | 53.3% |
| Region IV-B | 2 | ₱159.9M | 53.2 | 0 | 100.0% |
| Central Office | 1 | ₱192.8M | 76.6 | 0 | 100.0% |
| Region IV-A | 1 | ₱94.1M | 75.5 | 1 | 74.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 41 | ₱3.1B | 55.4 | 1 | 95.8% |
| Roads | 23 | ₱1.7B | 46.8 | 0 | 65.2% |
| Buildings and Facilities | 13 | ₱736.6M | 53.4 | 1 | 84.4% |
| OTHER | 3 | ₱254.4M | 75.9 | 3 | 67.2% |
| GAA 2025 SSP | 2 | ₱143.1M | 95.1 | 2 | 0.9% |
| GAA 2025 OO-2 | 1 | ₱140.4M | 92.4 | 1 | 69.7% |
| Bridges, Roads | 1 | ₱76.1M | 37.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CC0406REHABILITATION OF UGONG CREEK (LEFT SIDE) BALAGTAS, BULACAN (PACKAGE G) | Region III | Bulacan 1st DEO | On-Going | ₱95M | 0% | High risk96 | Flagged0.032 |
| 25AA0574CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (DPWH BUILDING), LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱48M | 2% | High risk95 | Flagged0.050 |
| 25AA0034FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASUQUIN RIVER, BARANGAY SULBEC, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱140.4M | 70% | High risk92 | Flagged0.022 |
| 23A00293CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF DAMAGED CONCRETE BANK REVETMENT WITH GABION FOOTING PROTECTION ALONG PASUQUIN RIVER REVETMENT, BARANGAY SULVEC, PASUQUIN, ILOCOS | Region I | Region I | On-Going | ₱96.5M | 88% | High risk82 | Flagged0.031 |
| 24C00005NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROADS, BIGAA-PLARIDEL VIA BULACAN AND MALOLOS ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱155.2M | 61% | High risk77 | —-0.002 |
| 23Z00010CONSTRUCTION OF RIVERWALL ALONG DAMPALIT RIVER, BRGY. HULONG DUHAT AND BRGY. DAMPALIT, MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱192.8M | 100% | High risk77 | —-0.046 |
| 23D00062CONSTRUCTION OF TAYTAY SPORTS COMPLEX, TAYTAY, RIZAL (PHASE 4) | Region IV-A | Region IV-A | On-Going | ₱94.1M | 75% | High risk76 | Flagged0.012 |
| 24CC0636CONSTRUCTION OF DRAINAGE STRUCTURE AT TIAONG ROAD, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱55.6M | 29% | High risk75 | Flagged0.040 |
| 24CC0159REHABILITATION OF UGONG CREEK, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49.5M | 100% | High risk74 | —-0.063 |
| 20CC0208CONSTRUCTION OF BOCAUE-BALAGTAS DIVERSION ROAD BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱63.8M | 38% | High risk70 | Flagged0.031 |
| 25OF0131CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA RIVER, BARANGAY BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱189.1M | 40% | High risk67 | —-0.015 |
| 24OF0178CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA RIVER, BARANGAY BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱190.4M | 97% | High risk67 | —-0.025 |
| 19OF0152CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MARIKINA RIVER (STA. 19+700 TO 19+850), BRGY. BATASAN HILLS, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱95.1M | 100% | High risk65 | —-0.068 |
| 25CD0172CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND ITS TRIBUTARIES,STA. 08+700 - STA. 08+875, BARANGAY CAINGIN, MEYCAUYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 62% | High risk65 | —-0.037 |
| 19OF0067CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MARIKINA RIVER, VISTA REAL (PHASE III , VISTA REAL TO CAPITOL) , BRGY. BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.1M | 100% | High risk65 | —-0.075 |
| 20O00017CONSTRUCTION OF MULTIPURPOSE BUILODING, NCRPO HEADQUARTERS CAMP BAGONG DIWA, TAGUIG CITY | National Capital Region | National Capital Region | Completed | ₱221.9M | 100% | High risk65 | —-0.054 |
| 24OA0050CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. TAÑONG TO BRGY. DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱93.6M | 100% | High risk64 | —-0.077 |
| 23OF0025CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA RIVER, BARANGAY BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 23OA0073CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MUZON RIVERWALL (PHASE 12), BRGY. MUZON MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱96.5M | 100% | High risk64 | —-0.033 |
| 24OA0064CONSTRUCTION OF PUMPING STATION, BATASAN RIVER, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AA0574CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (DPWH BUILDING), LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱48M | 2% | High risk95 | Flagged0.050 |
| 24CC0636CONSTRUCTION OF DRAINAGE STRUCTURE AT TIAONG ROAD, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱55.6M | 29% | High risk75 | Flagged0.040 |
| 25CC0406REHABILITATION OF UGONG CREEK (LEFT SIDE) BALAGTAS, BULACAN (PACKAGE G) | Region III | Bulacan 1st DEO | On-Going | ₱95M | 0% | High risk96 | Flagged0.032 |
| 20CC0208CONSTRUCTION OF BOCAUE-BALAGTAS DIVERSION ROAD BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱63.8M | 38% | High risk70 | Flagged0.031 |
| 23A00293CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF DAMAGED CONCRETE BANK REVETMENT WITH GABION FOOTING PROTECTION ALONG PASUQUIN RIVER REVETMENT, BARANGAY SULVEC, PASUQUIN, ILOCOS | Region I | Region I | On-Going | ₱96.5M | 88% | High risk82 | Flagged0.031 |
| 19O00062REPAIR AND RENOVATION OF ONE (1) FIVE (5) STOREY BUILDING WITH MEZZANINE, DICT COMPOUND, A. ROCES AVENUE, QUEZON CITY, | National Capital Region | National Capital Region | On-Going | ₱111.4M | 98% | High risk63 | Flagged0.029 |
| 25AA0034FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASUQUIN RIVER, BARANGAY SULBEC, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱140.4M | 70% | High risk92 | Flagged0.022 |
| 23D00062CONSTRUCTION OF TAYTAY SPORTS COMPLEX, TAYTAY, RIZAL (PHASE 4) | Region IV-A | Region IV-A | On-Going | ₱94.1M | 75% | High risk76 | Flagged0.012 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CC0406REHABILITATION OF UGONG CREEK (LEFT SIDE) BALAGTAS, BULACAN (PACKAGE G) | Region III | Bulacan 1st DEO | On-Going | ₱95M | 0% | High risk96 | Flagged0.032 |
| 2 | 25AA0574CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (DPWH BUILDING), LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱48M | 2% | High risk95 | Flagged0.050 |
| 3 | 25AA0034FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASUQUIN RIVER, BARANGAY SULBEC, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱140.4M | 70% | High risk92 | Flagged0.022 |
| 4 | 23A00293CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF DAMAGED CONCRETE BANK REVETMENT WITH GABION FOOTING PROTECTION ALONG PASUQUIN RIVER REVETMENT, BARANGAY SULVEC, PASUQUIN, ILOCOS | Region I | Region I | On-Going | ₱96.5M | 88% | High risk82 | Flagged0.031 |
| 5 | 24C00005NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROADS, BIGAA-PLARIDEL VIA BULACAN AND MALOLOS ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱155.2M | 61% | High risk77 | —-0.002 |
| 6 | 23Z00010CONSTRUCTION OF RIVERWALL ALONG DAMPALIT RIVER, BRGY. HULONG DUHAT AND BRGY. DAMPALIT, MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱192.8M | 100% | High risk77 | —-0.046 |
| 7 | 23D00062CONSTRUCTION OF TAYTAY SPORTS COMPLEX, TAYTAY, RIZAL (PHASE 4) | Region IV-A | Region IV-A | On-Going | ₱94.1M | 75% | High risk76 | Flagged0.012 |
| 8 | 24CC0636CONSTRUCTION OF DRAINAGE STRUCTURE AT TIAONG ROAD, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱55.6M | 29% | High risk75 | Flagged0.040 |
| 9 | 24CC0159REHABILITATION OF UGONG CREEK, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49.5M | 100% | High risk74 | —-0.063 |
| 10 | 20CC0208CONSTRUCTION OF BOCAUE-BALAGTAS DIVERSION ROAD BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱63.8M | 38% | High risk70 | Flagged0.031 |
| 11 | 25OF0131CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA RIVER, BARANGAY BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱189.1M | 40% | High risk67 | —-0.015 |
| 12 | 24OF0178CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA RIVER, BARANGAY BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱190.4M | 97% | High risk67 | —-0.025 |
| 13 | 19OF0152CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MARIKINA RIVER (STA. 19+700 TO 19+850), BRGY. BATASAN HILLS, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱95.1M | 100% | High risk65 | —-0.068 |
| 14 | 25CD0172CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND ITS TRIBUTARIES,STA. 08+700 - STA. 08+875, BARANGAY CAINGIN, MEYCAUYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 62% | High risk65 | —-0.037 |
| 15 | 19OF0067CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MARIKINA RIVER, VISTA REAL (PHASE III , VISTA REAL TO CAPITOL) , BRGY. BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.1M | 100% | High risk65 | —-0.075 |
| 16 | 20O00017CONSTRUCTION OF MULTIPURPOSE BUILODING, NCRPO HEADQUARTERS CAMP BAGONG DIWA, TAGUIG CITY | National Capital Region | National Capital Region | Completed | ₱221.9M | 100% | High risk65 | —-0.054 |
| 17 | 24OA0050CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. TAÑONG TO BRGY. DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱93.6M | 100% | High risk64 | —-0.077 |
| 18 | 23OF0025CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA RIVER, BARANGAY BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 19 | 23OA0073CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MUZON RIVERWALL (PHASE 12), BRGY. MUZON MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱96.5M | 100% | High risk64 | —-0.033 |
| 20 | 24OA0064CONSTRUCTION OF PUMPING STATION, BATASAN RIVER, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 21 | 23OA0083RIVER IMPROVEMENT WORKS ALONG DAMPALIT RIVER, BRGY. DAMPALIT, MALABON | National Capital Region | Malabon-Navotas DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.066 |
| 22 | 19O00062REPAIR AND RENOVATION OF ONE (1) FIVE (5) STOREY BUILDING WITH MEZZANINE, DICT COMPOUND, A. ROCES AVENUE, QUEZON CITY, | National Capital Region | National Capital Region | On-Going | ₱111.4M | 98% | High risk63 | Flagged0.029 |
| 23 | 18OF0049CONSTRUCTION OF SLOPE PROTECTION MARIKINA RIVER AT VISTA REAL SUBD. (PHASE 11), Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱93.1M | 100% | High risk62 | —-0.074 |
| 24 | 25OF0146REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS- SECONDARY ROADS - COMMONWEALTH AVENUE (S05646LZ) - K0020+043 - K00020+543, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96M | 42% | High risk61 | —-0.045 |
| 25 | 23OB0436IMPROVEMENT OF LAWTON AVENUE, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.1M | 100% | High risk61 | —-0.086 |