Contractor dossier
187 projects on file, including joint ventures this contractor is part of.
Total projects
187
Total budget
₱8.2B
Average progress
95.7%
Completion rate
89.3%
Average risk score
48.1
Medium risk on average, out of 100
Flagged as unusual
8
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 164 | ₱7.7B | 48.7 | 7 | 95.5% |
| Cordillera Administrative Region | 16 | ₱338.2M | 41.6 | 0 | 96.0% |
| Region II | 7 | ₱176.6M | 48.4 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 72 | ₱3.6B | 46.8 | 0 | 95.9% |
| Flood Control and Drainage | 67 | ₱3B | 48.6 | 1 | 99.4% |
| Buildings and Facilities | 28 | ₱185.8M | 39.7 | 0 | 99.3% |
| Bridges | 10 | ₱888.6M | 59.0 | 4 | 65.3% |
| OTHER | 4 | ₱214.3M | 79.6 | 2 | 87.5% |
| Bridges, Roads | 3 | ₱300.4M | 60.1 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱6.3M | 34.4 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱4.9M | 96.1 | 1 | 49.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AB0148BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. BUNGRO, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 49% | High risk96 | Flagged0.033 |
| 24AC0105CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAGPAT, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.4M | 95% | High risk88 | Flagged0.061 |
| 24AB0106CONSTRUCTION OF 4- STOREY 12-CLASSROOM SCHOOL BUILDING IN SAN NICOLAS NATIONAL HIGH SCHOOL, BARANGAY 24, MUNICIPALITY OF SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱39.4M | 55% | High risk88 | Flagged0.067 |
| 24A00290CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, PAOAY, ILOCOS NORTE | Region I | Region I | Completed | ₱115.8M | 100% | High risk75 | —-0.021 |
| 17AI0030IMPVT/WIDENING OF NATL RD ALONG PNER, KO 180+417 - KO 181+745; KO 183+929-KO184+062 | Region I | Pangasinan 3rd DEO | Completed | ₱46.4M | 100% | High risk72 | —-0.031 |
| 18AD0012CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS , MANILA NORTH ROAD, K0386+000-K0389+000(R/S) | Region I | Ilocos Sur 2nd DEO | Completed | ₱32.1M | 100% | High risk70 | —-0.024 |
| 23AA0031CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER ALONG LAOAG (SARRAT) RIVER, BARANGAY 10, SAN MIGUEL, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱19.6M | 100% | High risk70 | —-0.068 |
| 24A00124WIDENING OF PERMANENT BRIDGES, BADOC PARALLEL BR. ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱39.6M | 1% | High risk69 | Flagged0.017 |
| 24A00360CONSTRUCTION OF MISSING LINKS/NEW ROADS, ROAD CONNECTING SANTA-RANCHO ROAD (S00089LZ) AND SANTA-CAOAYAN ROAD, ILOCOS SUR | Region I | Region I | Completed | ₱149.7M | 100% | High risk68 | —-0.002 |
| 23A00164CONSTRUCTION OF MISSING LINKS/ NEW ROADS - CABUGAO-NUEVA ERA-DANGLAS ROAD, CABUGAO SECTION, ILOCOS SUR | Region I | Region I | Completed | ₱60.7M | 100% | High risk66 | —-0.046 |
| 17AE0034REHABILITATION AND IMPROVEMENT OF AMBURAYAN RIVER AT BRGY. NAMALTUGAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.045 |
| 23A00050CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADUNGON RIVER, BOTH BANK, BARANGAY BAGBAGO, SOLSONA, ILOCOS NORTE | Region I | Region I | Completed | ₱96.5M | 100% | High risk64 | —-0.052 |
| 24A00012CONSTRUCTION OF MISSING LINKS/NEW ROADS, BANTAY (ILOCOS SUR) - SAN QUINTIN - LANGIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 5) | Region I | Region I | Completed | ₱154M | 100% | High risk63 | —-0.024 |
| 16AD0142CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES: CONSTRUCTION OF BREAKWATER/HEXAPODS OF SANTA SEAWALL,SANTA, ILOCOS SUR 2ND LD | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk63 | —-0.040 |
| 16AD0143CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES: CONSTRUCTION OF ABRA RIVER CONTROL,SANTA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.6M | 100% | High risk63 | —-0.042 |
| 23A00145WIDENING OF PERMANENT BRIDGES - BADOC PARALLEL BR. (B00564LZ) ALONG MANILA NORTH RD | Region I | Region I | Completed | ₱153.4M | 100% | High risk63 | —-0.023 |
| 25AB0024BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PANGIL, CURRIMAO, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.8M | 80% | High risk62 | —-0.037 |
| 22A00260CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN AT BARANGAYS BUCAO WEST, BUCAO EAST, LANTAG, BARITAO AND TARANGOTON | Region I | Region I | Completed | ₱241.2M | 100% | High risk62 | —-0.033 |
| 16BB0099CONSTRUCTION OF CASAMBALANGAN RIVER CONTROL PROJECT CASAMBALANGAN, STA. ANA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱20M | 100% | High risk62 | —-0.033 |
| 16BB0101CONSTRUCTION OF PALAWIG RIVER CONTROL PROJECT STA. ANA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱20.1M | 100% | High risk62 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AB0106CONSTRUCTION OF 4- STOREY 12-CLASSROOM SCHOOL BUILDING IN SAN NICOLAS NATIONAL HIGH SCHOOL, BARANGAY 24, MUNICIPALITY OF SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱39.4M | 55% | High risk88 | Flagged0.067 |
| 24AC0105CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAGPAT, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.4M | 95% | High risk88 | Flagged0.061 |
| 25AB0148BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. BUNGRO, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 49% | High risk96 | Flagged0.033 |
| 24A00124WIDENING OF PERMANENT BRIDGES, BADOC PARALLEL BR. ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱39.6M | 1% | High risk69 | Flagged0.017 |
| 25A00438SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF ROAD CONNECTING TO SANTA-RANCHO (S00089LZ) TO SANTA-CAOAYAN ROAD (PHASE 2), ILOCOS SUR | Region I | Region I | On-Going | ₱93.6M | 25% | High risk62 | Flagged0.011 |
| 17BI0126REHABILITATION/IMPROVEMENT OF BAKIR FLOOD CONTROL STRUCTURES (STA.0+000-STA. 0+507.10), BAGABAG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱18.6M | 100% | Medium risk57 | Flagged0.002 |
| 25A00106CONSTRUCTION OF MISSING LINKS/ NEW ROADS - BANTAY (ILOCOS SUR) - SAN QUINTIN-LANGIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 6) | Region I | Region I | On-Going | ₱94.5M | 50% | High risk62 | Flagged0.001 |
| 25A00424CONSTRUCTION OF MISSING LINKS/ NEW ROADS, ROAD CONNECTING SANTA-RANCHO ROAD (S00089LZ) AND SANTA-CAOAYAN ROAD, ILOCOS SUR (PACKAGE 3) | Region I | Region I | On-Going | ₱89.8M | 54% | Medium risk55 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18PI0045IMPLEMENTATION AND MONITORING OF PAMANA PROJECTS: CONCRETING OF DACUDAC-TOKOD-PASNADAN FMR, TADIAN, | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱64.5M | 100% | Medium risk53 | —-0.012 |
| 52 | 21BA0059CONSTRUCTION OF MULTI-PURPOSE BUILDING (AMPHITHEATRE) BATANES STATE COLLEGE | Region II | Batanes DEO | Completed | ₱44.3M | 100% | Medium risk53 | —-0.061 |
| 53 | 21A00100CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TAGUDIN BYPASS ROAD, ILOCOS SUR | Region I | Region I | Completed | ₱91.3M | 100% | Medium risk53 | —-0.076 |
| 54 | 21A00050CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) - VIGAN BOARDWALK ROAD LEADING TO THE HERITAGE VILLAGE, VIGAN CITY, ILOCOS SUR, PACKAGE II | Region I | Region I | Completed | ₱101.2M | 100% | Medium risk53 | —-0.067 |
| 55 | 18AI0053IMPVT/WIDENING OF NATL ROAD PNVR (KO 182+148 - KO 183+735), (KO 188+557 - KO 190+390) | Region I | Pangasinan 3rd DEO | Completed | ₱66.3M | 100% | Medium risk53 | —-0.082 |
| 56 | 21A00210CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, VILLASIS BYPASS ROAD, PANGASINAN | Region I | Region I | Completed | ₱67.6M | 100% | Medium risk52 | —-0.086 |
| 57 | 25PD0022REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -PRIMARY ROADS; KENNON RD. K0245+884-K0246+358,K0246+537-K0246+733 | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱85.9M | 36% | Medium risk52 | —-0.033 |
| 58 | 22AC0015CONSTRUCTION OF FLOOD CONTROL ALONG BUNGRO RIVER, STO. DOMINGO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱91.7M | 100% | Medium risk52 | —-0.052 |
| 59 | 22AC0014CONSTRUCTION OF FLOOD CONTROL ALONG BANTAOAY RIVER, SAN VICENTE, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱91.7M | 100% | Medium risk51 | —-0.051 |
| 60 | 23AB0206CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CALI, MUNICIPALITY OF DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱4.8M | 100% | Medium risk51 | —-0.042 |
| 61 | 19A00091CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, POBLACION-PUGUIL-TUBADAY ROAD, CONNECTING BALAOAN-SANTOL ROAD IN SUPPORT TO SOFT BROOM INDUSTRY AND OTHER HIGH VALUE AGRICULTURAL PRODUCTS, PACKAGE 2, SANTOL, LA UN | Region I | Region I | Completed | ₱86.9M | 100% | Medium risk50 | —-0.076 |
| 62 | 23A00155CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO SANGBAY FALLS AND MINI TERRACES, BRGY. GUSING SUR, NAGUILIAN, LA UNION | Region I | Region I | Completed | ₱48.5M | 100% | Medium risk50 | —-0.046 |
| 63 | 24A00023CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TAGUDIN BYPASS ROAD, ILOCOS SUR | Region I | Region I | Completed | ₱81.5M | 100% | Medium risk50 | —-0.077 |
| 64 | 22A00058CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TAGUDIN BYPASS ROAD, ILOCOS SUR | Region I | Region I | Completed | ₱57.2M | 100% | Medium risk50 | —-0.084 |
| 65 | 24AC0005CONSTRUCTION OF PUG-OS - SALAPASAP - NAMRUANGAN - DACLAPAN ROAD LEADING TO PUBLIC BEACHES AND SURFING AREA, CABUGAO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱67.6M | 100% | Medium risk50 | —-0.074 |
| 66 | 19AC0080CONSTRUCTION OF PERIMETER FENCE, BUREAU OF JAIL MANAGEMENT AND PENOLOGY, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱5M | 100% | Medium risk49 | —-0.082 |
| 67 | 23A00134CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VIGAN-CABUGAO COASTAL/DIVERSION ROAD, PACKAGE 2, ILOCOS SUR | Region I | Region I | Completed | ₱76.7M | 100% | Medium risk49 | —-0.073 |
| 68 | 23A00133CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VIGAN-CABUGAO COASTAL/DIVERSION ROAD, PACKAGE 1, ILOCOS SUR | Region I | Region I | Completed | ₱76.7M | 100% | Medium risk49 | —-0.073 |
| 69 | 25A00140CONSTRUCTION OF MISSING LINKS/ NEW ROADS, ROAD CONNECTING SANTA-RANCHO ROAD (S00089LZ) AND SANTA-CAOAYAN ROAD, ILOCOS SUR (PACKAGE 2) | Region I | Region I | On-Going | ₱32.8M | 61% | Medium risk49 | —-0.008 |
| 70 | 25A00139CONSTRUCTION OF MISSING LINKS/ NEW ROADS, ROAD CONNECTING SANTA-RANCHO ROAD (S00089LZ) AND SANTA-CAOAYAN ROAD, ILOCOS SUR (PACKAGE 1) | Region I | Region I | On-Going | ₱32.8M | 61% | Medium risk49 | —-0.008 |
| 71 | 18PD0051NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS/DIVERSION ROADS, STO. TOMAS-MT. CABUYO ROAD TO WESTERNLINK CIRCUMFERENTIAL ROAD, BYPASS, INCL ROW AND SLOPE PROTECTION, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱52.2M | 100% | Medium risk49 | —-0.072 |
| 72 | 21AC0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (CAOAYAN TOURISM CENTER) BRGY. PANDAN, CAOAYAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱5M | 100% | Medium risk49 | —-0.082 |
| 73 | 24AC0072CONSTRUCTION OF SEAWALL, BARANGAY VILLAMAR, CAOAYAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱53.1M | 84% | Medium risk48 | —-0.024 |
| 74 | 23AB0188CONSTRUCTION OF 1STY 5CL, FORTUNA ES, MARCOS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱10.9M | 100% | Medium risk48 | —-0.038 |
| 75 | 23PD0028BASIC INFRASTRUCTURE PROGRAM-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT) QUIRINO ELEMENTARY SCHOOL, BARANGAY MIDDLE QUIRINO HILL, BAGUIO CITY, BENGUET | Cordillera Administrative Region | Baguio City DEO | Completed | ₱9.9M | 100% | Medium risk48 | —-0.079 |