Contractor dossier
187 projects on file, including joint ventures this contractor is part of.
Total projects
187
Total budget
₱8.2B
Average progress
95.7%
Completion rate
89.3%
Average risk score
48.1
Medium risk on average, out of 100
Flagged as unusual
8
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 164 | ₱7.7B | 48.7 | 7 | 95.5% |
| Cordillera Administrative Region | 16 | ₱338.2M | 41.6 | 0 | 96.0% |
| Region II | 7 | ₱176.6M | 48.4 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 72 | ₱3.6B | 46.8 | 0 | 95.9% |
| Flood Control and Drainage | 67 | ₱3B | 48.6 | 1 | 99.4% |
| Buildings and Facilities | 28 | ₱185.8M | 39.7 | 0 | 99.3% |
| Bridges | 10 | ₱888.6M | 59.0 | 4 | 65.3% |
| OTHER | 4 | ₱214.3M | 79.6 | 2 | 87.5% |
| Bridges, Roads | 3 | ₱300.4M | 60.1 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱6.3M | 34.4 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱4.9M | 96.1 | 1 | 49.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AB0148BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. BUNGRO, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 49% | High risk96 | Flagged0.033 |
| 24AC0105CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAGPAT, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.4M | 95% | High risk88 | Flagged0.061 |
| 24AB0106CONSTRUCTION OF 4- STOREY 12-CLASSROOM SCHOOL BUILDING IN SAN NICOLAS NATIONAL HIGH SCHOOL, BARANGAY 24, MUNICIPALITY OF SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱39.4M | 55% | High risk88 | Flagged0.067 |
| 24A00290CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, PAOAY, ILOCOS NORTE | Region I | Region I | Completed | ₱115.8M | 100% | High risk75 | —-0.021 |
| 17AI0030IMPVT/WIDENING OF NATL RD ALONG PNER, KO 180+417 - KO 181+745; KO 183+929-KO184+062 | Region I | Pangasinan 3rd DEO | Completed | ₱46.4M | 100% | High risk72 | —-0.031 |
| 18AD0012CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS , MANILA NORTH ROAD, K0386+000-K0389+000(R/S) | Region I | Ilocos Sur 2nd DEO | Completed | ₱32.1M | 100% | High risk70 | —-0.024 |
| 23AA0031CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER ALONG LAOAG (SARRAT) RIVER, BARANGAY 10, SAN MIGUEL, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱19.6M | 100% | High risk70 | —-0.068 |
| 24A00124WIDENING OF PERMANENT BRIDGES, BADOC PARALLEL BR. ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱39.6M | 1% | High risk69 | Flagged0.017 |
| 24A00360CONSTRUCTION OF MISSING LINKS/NEW ROADS, ROAD CONNECTING SANTA-RANCHO ROAD (S00089LZ) AND SANTA-CAOAYAN ROAD, ILOCOS SUR | Region I | Region I | Completed | ₱149.7M | 100% | High risk68 | —-0.002 |
| 23A00164CONSTRUCTION OF MISSING LINKS/ NEW ROADS - CABUGAO-NUEVA ERA-DANGLAS ROAD, CABUGAO SECTION, ILOCOS SUR | Region I | Region I | Completed | ₱60.7M | 100% | High risk66 | —-0.046 |
| 17AE0034REHABILITATION AND IMPROVEMENT OF AMBURAYAN RIVER AT BRGY. NAMALTUGAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.045 |
| 23A00050CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADUNGON RIVER, BOTH BANK, BARANGAY BAGBAGO, SOLSONA, ILOCOS NORTE | Region I | Region I | Completed | ₱96.5M | 100% | High risk64 | —-0.052 |
| 24A00012CONSTRUCTION OF MISSING LINKS/NEW ROADS, BANTAY (ILOCOS SUR) - SAN QUINTIN - LANGIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 5) | Region I | Region I | Completed | ₱154M | 100% | High risk63 | —-0.024 |
| 16AD0142CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES: CONSTRUCTION OF BREAKWATER/HEXAPODS OF SANTA SEAWALL,SANTA, ILOCOS SUR 2ND LD | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk63 | —-0.040 |
| 16AD0143CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES: CONSTRUCTION OF ABRA RIVER CONTROL,SANTA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.6M | 100% | High risk63 | —-0.042 |
| 23A00145WIDENING OF PERMANENT BRIDGES - BADOC PARALLEL BR. (B00564LZ) ALONG MANILA NORTH RD | Region I | Region I | Completed | ₱153.4M | 100% | High risk63 | —-0.023 |
| 25AB0024BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PANGIL, CURRIMAO, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.8M | 80% | High risk62 | —-0.037 |
| 22A00260CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN AT BARANGAYS BUCAO WEST, BUCAO EAST, LANTAG, BARITAO AND TARANGOTON | Region I | Region I | Completed | ₱241.2M | 100% | High risk62 | —-0.033 |
| 16BB0099CONSTRUCTION OF CASAMBALANGAN RIVER CONTROL PROJECT CASAMBALANGAN, STA. ANA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱20M | 100% | High risk62 | —-0.033 |
| 16BB0101CONSTRUCTION OF PALAWIG RIVER CONTROL PROJECT STA. ANA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱20.1M | 100% | High risk62 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AB0106CONSTRUCTION OF 4- STOREY 12-CLASSROOM SCHOOL BUILDING IN SAN NICOLAS NATIONAL HIGH SCHOOL, BARANGAY 24, MUNICIPALITY OF SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱39.4M | 55% | High risk88 | Flagged0.067 |
| 24AC0105CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAGPAT, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.4M | 95% | High risk88 | Flagged0.061 |
| 25AB0148BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. BUNGRO, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 49% | High risk96 | Flagged0.033 |
| 24A00124WIDENING OF PERMANENT BRIDGES, BADOC PARALLEL BR. ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱39.6M | 1% | High risk69 | Flagged0.017 |
| 25A00438SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF ROAD CONNECTING TO SANTA-RANCHO (S00089LZ) TO SANTA-CAOAYAN ROAD (PHASE 2), ILOCOS SUR | Region I | Region I | On-Going | ₱93.6M | 25% | High risk62 | Flagged0.011 |
| 17BI0126REHABILITATION/IMPROVEMENT OF BAKIR FLOOD CONTROL STRUCTURES (STA.0+000-STA. 0+507.10), BAGABAG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱18.6M | 100% | Medium risk57 | Flagged0.002 |
| 25A00106CONSTRUCTION OF MISSING LINKS/ NEW ROADS - BANTAY (ILOCOS SUR) - SAN QUINTIN-LANGIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 6) | Region I | Region I | On-Going | ₱94.5M | 50% | High risk62 | Flagged0.001 |
| 25A00424CONSTRUCTION OF MISSING LINKS/ NEW ROADS, ROAD CONNECTING SANTA-RANCHO ROAD (S00089LZ) AND SANTA-CAOAYAN ROAD, ILOCOS SUR (PACKAGE 3) | Region I | Region I | On-Going | ₱89.8M | 54% | Medium risk55 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22A00093CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, VIGAN-CABUGAO COASTAL/ DIVERSION ROAD, ILOCOS SUR, PACKAGE 2 | Region I | Region I | Completed | ₱52.9M | 100% | Medium risk48 | —-0.077 |
| 77 | 20PD0102LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF SCHOOL COVERED COURT MANUEL L. QUEZON ELEMENTARY SCHOOL, BRGY. UPPER SESSION ROAD, BAGUIO CITY, BENGUET | Cordillera Administrative Region | Baguio City DEO | Completed | ₱9.2M | 100% | Medium risk48 | —-0.079 |
| 78 | 24AC0039CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MESTIZO RIVER, VIGAN CITY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱48.5M | 100% | Medium risk48 | —-0.033 |
| 79 | 25A00225CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TAGUDIN BYPASS ROAD, ILOCOS SUR | Region I | Region I | On-Going | ₱50.9M | 89% | Medium risk47 | —-0.049 |
| 80 | 22A00116CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD CONNECTING THE HERITAGE CITY OF VIGAN AND SURFING DESTINATION, STA. CATALINA, ILOCOS SUR | Region I | Region I | Completed | ₱48.2M | 100% | Medium risk47 | —-0.078 |
| 81 | 19AC0071CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER, BANTAY SECTION (PHASE II), BANTAY, ILOCOS SUR | Region I | Region I | Completed | ₱51.4M | 100% | Medium risk47 | —-0.066 |
| 82 | 24AC0003CONSTRUCTION OF FLOOD CONTROL ALONG MESTIZO RIVER, FUERTE (SABANGAN), CAOAYAN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱48.9M | 79% | Medium risk47 | —-0.018 |
| 83 | 20AC0060CONSTRUCTION OF SEAWALL, PARATONG - SUBEC, STA. CATALINA, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.064 |
| 84 | 19BA0039CONSTRUCTION OF IVANA SEAWALL, IVANA, BATANES | Region II | Batanes DEO | Completed | ₱29.6M | 100% | Medium risk46 | —-0.055 |
| 85 | 18AC0077CONCRETING OF ROAD, BARANGAYS BACLIG - RIZAL - BONIFACIO, CABUGAO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱4.7M | 100% | Medium risk46 | —-0.080 |
| 86 | 21AC0158CONSTRUCTION OF CLASSROOM, THREE (3) STOREY, TWELVE (12) CLASSROOM (MODIFIED STANDARD) SCHOOL BUILDING, CABUGAO NATIONAL HIGH SCHOOL, CABUGAO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱32M | 100% | Medium risk46 | —-0.023 |
| 87 | 20AC0004CONSTRUCTION OF FLOOD CONTROL, BRGY. MARATUDO, MAGSINGAL, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.062 |
| 88 | 20AC0058CONSTRUCTION OF SEAWALL, PARATONG SITIO MINDANAO, STA. CATALINA, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.063 |
| 89 | 20A00178CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF SEAWALL AT CABITTAOGAN, STA. CATALINA, ILOCOS SUR | Region I | Region I | Completed | ₱49M | 100% | Medium risk46 | —-0.065 |
| 90 | 24A00047CONSTRUCTION OF MISSING LINK / NEW ROADS, CABUGAO-NUEVA ERA-DANGLAS ROAD ,CABUGAO SECTION, ILOCOS SUR | Region I | Region I | Completed | ₱43.4M | 100% | Medium risk46 | —-0.081 |
| 91 | 23AC0054CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANTAOAY RIVER, BRGY. BUSIING NORTE, SAN ILDEFONSO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱34.3M | 100% | Medium risk46 | —-0.063 |
| 92 | 18AC0117CONSTRUCTION OF FLOOD CONTROL ALONG BANAOANG RIVER, BARANGAY PAING, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱46.8M | 100% | Medium risk46 | —-0.066 |
| 93 | 20AC0009CONSTRUCTION OF STA. CATALINA SEAWALL, BRGY. TAMURONG, STA. CATALINA, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱32.9M | 100% | Medium risk46 | —-0.063 |
| 94 | 18AC0058CONST. OF FLOOD CONTROL ALONG ABRA RIVER, BANAOANG SECTION, KM. 000+959 - KM. 001+460, DOWNSTREAM | Region I | Ilocos Sur 1st DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.062 |
| 95 | 19AC0024CONSTRUCTION OF SEAWALL, SITIO MINDANAO, PARATONG, STA. CATALINA, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.063 |
| 96 | 24AC0045CONSTRUCTION OF SEAWALL, BARANGAY MINDORO, VIGAN CITY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.066 |
| 97 | 18AC0066SHOULDER PAVING / CONSTRUCTION OF MANILA NORTH ROAD, K0414+683-K0416+003, K0418+163-K0418+362, K0418 | Region I | Ilocos Sur 1st DEO | Completed | ₱26.6M | 100% | Medium risk45 | —-0.082 |
| 98 | 25A00224CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VIGAN-CABUGAO COASTAL/DIVERSION ROAD, PACKAGE 1, ILOCOS SUR | Region I | Region I | On-Going | ₱33.9M | 59% | Medium risk45 | —-0.034 |
| 99 | 20AC0061CONSTRUCTION OF SEAWALL, SITIO MINDANAO, BARANGAY PARATONG, STA. CATALINA, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱33.9M | 100% | Medium risk45 | —-0.066 |
| 100 | 18AC0050CONCRETING OF ACCESS ROAD AT SAN MARIANO ROAD LEADING TO SINANGBALDE FALLS AND APAR FALLS, BRGY. SAN | Region I | Ilocos Sur 1st DEO | Completed | ₱20.7M | 100% | Medium risk45 | —-0.082 |