Contractor dossier
187 projects on file, including joint ventures this contractor is part of.
Total projects
187
Total budget
₱8.2B
Average progress
95.7%
Completion rate
89.3%
Average risk score
48.1
Medium risk on average, out of 100
Flagged as unusual
8
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 164 | ₱7.7B | 48.7 | 7 | 95.5% |
| Cordillera Administrative Region | 16 | ₱338.2M | 41.6 | 0 | 96.0% |
| Region II | 7 | ₱176.6M | 48.4 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 72 | ₱3.6B | 46.8 | 0 | 95.9% |
| Flood Control and Drainage | 67 | ₱3B | 48.6 | 1 | 99.4% |
| Buildings and Facilities | 28 | ₱185.8M | 39.7 | 0 | 99.3% |
| Bridges | 10 | ₱888.6M | 59.0 | 4 | 65.3% |
| OTHER | 4 | ₱214.3M | 79.6 | 2 | 87.5% |
| Bridges, Roads | 3 | ₱300.4M | 60.1 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱6.3M | 34.4 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱4.9M | 96.1 | 1 | 49.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AB0148BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. BUNGRO, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 49% | High risk96 | Flagged0.033 |
| 24AC0105CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAGPAT, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.4M | 95% | High risk88 | Flagged0.061 |
| 24AB0106CONSTRUCTION OF 4- STOREY 12-CLASSROOM SCHOOL BUILDING IN SAN NICOLAS NATIONAL HIGH SCHOOL, BARANGAY 24, MUNICIPALITY OF SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱39.4M | 55% | High risk88 | Flagged0.067 |
| 24A00290CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, PAOAY, ILOCOS NORTE | Region I | Region I | Completed | ₱115.8M | 100% | High risk75 | —-0.021 |
| 17AI0030IMPVT/WIDENING OF NATL RD ALONG PNER, KO 180+417 - KO 181+745; KO 183+929-KO184+062 | Region I | Pangasinan 3rd DEO | Completed | ₱46.4M | 100% | High risk72 | —-0.031 |
| 18AD0012CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS , MANILA NORTH ROAD, K0386+000-K0389+000(R/S) | Region I | Ilocos Sur 2nd DEO | Completed | ₱32.1M | 100% | High risk70 | —-0.024 |
| 23AA0031CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER ALONG LAOAG (SARRAT) RIVER, BARANGAY 10, SAN MIGUEL, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱19.6M | 100% | High risk70 | —-0.068 |
| 24A00124WIDENING OF PERMANENT BRIDGES, BADOC PARALLEL BR. ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱39.6M | 1% | High risk69 | Flagged0.017 |
| 24A00360CONSTRUCTION OF MISSING LINKS/NEW ROADS, ROAD CONNECTING SANTA-RANCHO ROAD (S00089LZ) AND SANTA-CAOAYAN ROAD, ILOCOS SUR | Region I | Region I | Completed | ₱149.7M | 100% | High risk68 | —-0.002 |
| 23A00164CONSTRUCTION OF MISSING LINKS/ NEW ROADS - CABUGAO-NUEVA ERA-DANGLAS ROAD, CABUGAO SECTION, ILOCOS SUR | Region I | Region I | Completed | ₱60.7M | 100% | High risk66 | —-0.046 |
| 17AE0034REHABILITATION AND IMPROVEMENT OF AMBURAYAN RIVER AT BRGY. NAMALTUGAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.045 |
| 23A00050CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADUNGON RIVER, BOTH BANK, BARANGAY BAGBAGO, SOLSONA, ILOCOS NORTE | Region I | Region I | Completed | ₱96.5M | 100% | High risk64 | —-0.052 |
| 24A00012CONSTRUCTION OF MISSING LINKS/NEW ROADS, BANTAY (ILOCOS SUR) - SAN QUINTIN - LANGIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 5) | Region I | Region I | Completed | ₱154M | 100% | High risk63 | —-0.024 |
| 16AD0142CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES: CONSTRUCTION OF BREAKWATER/HEXAPODS OF SANTA SEAWALL,SANTA, ILOCOS SUR 2ND LD | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk63 | —-0.040 |
| 16AD0143CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES: CONSTRUCTION OF ABRA RIVER CONTROL,SANTA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.6M | 100% | High risk63 | —-0.042 |
| 23A00145WIDENING OF PERMANENT BRIDGES - BADOC PARALLEL BR. (B00564LZ) ALONG MANILA NORTH RD | Region I | Region I | Completed | ₱153.4M | 100% | High risk63 | —-0.023 |
| 25AB0024BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PANGIL, CURRIMAO, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.8M | 80% | High risk62 | —-0.037 |
| 22A00260CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN AT BARANGAYS BUCAO WEST, BUCAO EAST, LANTAG, BARITAO AND TARANGOTON | Region I | Region I | Completed | ₱241.2M | 100% | High risk62 | —-0.033 |
| 16BB0099CONSTRUCTION OF CASAMBALANGAN RIVER CONTROL PROJECT CASAMBALANGAN, STA. ANA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱20M | 100% | High risk62 | —-0.033 |
| 16BB0101CONSTRUCTION OF PALAWIG RIVER CONTROL PROJECT STA. ANA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱20.1M | 100% | High risk62 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AB0106CONSTRUCTION OF 4- STOREY 12-CLASSROOM SCHOOL BUILDING IN SAN NICOLAS NATIONAL HIGH SCHOOL, BARANGAY 24, MUNICIPALITY OF SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱39.4M | 55% | High risk88 | Flagged0.067 |
| 24AC0105CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAGPAT, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.4M | 95% | High risk88 | Flagged0.061 |
| 25AB0148BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. BUNGRO, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 49% | High risk96 | Flagged0.033 |
| 24A00124WIDENING OF PERMANENT BRIDGES, BADOC PARALLEL BR. ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱39.6M | 1% | High risk69 | Flagged0.017 |
| 25A00438SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF ROAD CONNECTING TO SANTA-RANCHO (S00089LZ) TO SANTA-CAOAYAN ROAD (PHASE 2), ILOCOS SUR | Region I | Region I | On-Going | ₱93.6M | 25% | High risk62 | Flagged0.011 |
| 17BI0126REHABILITATION/IMPROVEMENT OF BAKIR FLOOD CONTROL STRUCTURES (STA.0+000-STA. 0+507.10), BAGABAG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱18.6M | 100% | Medium risk57 | Flagged0.002 |
| 25A00106CONSTRUCTION OF MISSING LINKS/ NEW ROADS - BANTAY (ILOCOS SUR) - SAN QUINTIN-LANGIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 6) | Region I | Region I | On-Going | ₱94.5M | 50% | High risk62 | Flagged0.001 |
| 25A00424CONSTRUCTION OF MISSING LINKS/ NEW ROADS, ROAD CONNECTING SANTA-RANCHO ROAD (S00089LZ) AND SANTA-CAOAYAN ROAD, ILOCOS SUR (PACKAGE 3) | Region I | Region I | On-Going | ₱89.8M | 54% | Medium risk55 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 19AF0002CONST. OF FLOOD MIT STRUC. FACI. ALONG ARINGAY RIVER BASIN, STA. CECILIA, ARINGAY, LU | Region I | La Union 2nd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.071 |
| 102 | 18AF0049CONST OF FLOOD CONTROL STRUCTURES ALONG NAG-BAG RIVER, NAGUILIAN, LU | Region I | La Union 2nd DEO | Completed | ₱45.8M | 100% | Medium risk45 | —-0.068 |
| 103 | 19AF0049CONST OF FLOOD CONTROL STRUC ALONG NAG-BAGULIN RIVER, BARAOAS SUR-ORTIZ, NAG, LU | Region I | La Union 2nd DEO | Completed | ₱37.7M | 100% | Medium risk45 | —-0.070 |
| 104 | 19AF0050CONST OF FLOOD CONTROL STRUC ALONG NAG-BAGULIN RIVER, MAMAT-ING SUR-MAMAT-ING NORTE, NAG, LU | Region I | La Union 2nd DEO | Completed | ₱30.7M | 100% | Medium risk45 | —-0.071 |
| 105 | 23A00176CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), VIGAN BOARDWALK ROAD LEADING TO THE HERITAGE VILLAGE, VIGAN CITY, ILOCOS SUR | Region I | Region I | Completed | ₱28.9M | 100% | Medium risk45 | —-0.081 |
| 106 | 18AC0064REHABILITATION / RECOSTRUCTION OF PARAS BARANGAY ROAD, BRGY. PARAS, STO. DOMINGO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱18.8M | 100% | Medium risk45 | —-0.081 |
| 107 | 24A00049CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VIGAN-CABUGAO COASTAL/DIVERSION ROAD,ILOCOS SUR, PACKAGE 1 | Region I | Region I | Completed | ₱38.2M | 100% | Medium risk45 | —-0.081 |
| 108 | 19AF0016CONST OF FLOOD CONT. MIT FAC ALONG ARINGAY RIVER BASIN, POB WEST - TAVORA EAST, PUGO, LU | Region I | La Union 2nd DEO | Completed | ₱39M | 100% | Medium risk45 | —-0.072 |
| 109 | 18AF0066CONST OF FLOOD CONTROL STRUC ALONG ARINGAY RIVER, STO ROSARIO EAST, STA RITA WEST, POB, & STA LUCIA, | Region I | La Union 2nd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.068 |
| 110 | 19AF0009CONST. OF DLOOD MIT STRUC FAC ALONG BAUANG RIVER BASIN, PUDOC, BAUANG, LU | Region I | La Union 2nd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.069 |
| 111 | 19AF0006CONST. OF FLOOD MIT STRUC. FAC. ALONG ARINGAY RIVER BASIN, STO. ROSARIO, ARINGAY, LU | Region I | La Union 2nd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.070 |
| 112 | 20A00197LOCAL INFRASTRUCTURE PROGRAM (LIP) - CONSTRUCTION OF FLOOD CONTROL/ MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. PACAC - BARITAO - LANTAG - PUDOC EAST, TAGUDIN, ILOCOS SUR | Region I | Region I | Completed | ₱29.7M | 100% | Medium risk45 | —-0.070 |
| 113 | 22AC0006CONSTRUCTION OF FLOOD CONTROL ALONG PARSUA RIVER, STA. 0+000 - STA. 0+358, BRGY. BUNGRO, MAGSINGAL, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱45.1M | 100% | Medium risk45 | —-0.063 |
| 114 | 18AC0017CONSTRUCTION OF SEAWALL, PARATONG - TAMURONG, STA. CATALINA, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.066 |
| 115 | 20AC0057CONSTRUCTION OF SEAWALL, PARATONG, STA. CATALINA, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱23.5M | 100% | Medium risk45 | —-0.067 |
| 116 | 18PI0051NDRRMF-MP-ILOCOS SUR VIA TUE K0395+650 - K0395+675, K0402+790 - K0402+805, K0404+980 -K0405+500, K0416+580 -K0416+600, K0418+480 -K0418+510 TADIAN BAUKO & SABANGAN | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱6M | 100% | Medium risk45 | —-0.082 |
| 117 | 20AC0031CONSTRUCTION OF FLOOD CONTROL, BRGY. MAAS-ASIN-BRGY. MARATUDO, MAGSINGAL, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱39.2M | 100% | Medium risk45 | —-0.063 |
| 118 | 19AC0052CONST. OF CONCRETE ROAD - SAN MARIANO ROAD LEADING TO SINANGBALDE FALLS & APAR FALLS, SAN MARIANO | Region I | Ilocos Sur 1st DEO | Completed | ₱14.7M | 100% | Medium risk45 | —-0.085 |
| 119 | 19AC0023CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER (UPSTREAM), BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱29.4M | 100% | Medium risk45 | —-0.067 |
| 120 | 19AC0070CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱37.2M | 100% | Medium risk45 | —-0.067 |
| 121 | 22AC0007CONSTRUCTION OF FLOOD CONTROL ALONG SINAIT RIVER, STA. 0+000 - STA. 0+353, BRGY. PUG-OS, SINAIT, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱45.2M | 100% | Medium risk45 | —-0.062 |
| 122 | 24AC0002CONSTRUCTION OF FLOOD CONTROL ALONG SINAIT RIVER, BARANGAY PUG-OS, SINAIT, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱37M | 100% | Medium risk45 | —-0.064 |
| 123 | 18AD0033CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF ABRA RIVER CONTROL, SANTA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱27.9M | 100% | Medium risk44 | —-0.068 |
| 124 | 18AC0033CONSTRUCTION OF SLOPE PROTECTION AND OTHER FLOOD MITIGATION PROJECTS, ABRA RIVER BASIN, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱24.5M | 100% | Medium risk44 | —-0.068 |
| 125 | 18AC0021CONSTRUCTION OF FLOOD CONTROL ALONG CABUGAO RIVER, TUROD - PATAC, CABUGAO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱22.5M | 100% | Medium risk44 | —-0.066 |