Contractor dossier
187 projects on file, including joint ventures this contractor is part of.
Total projects
187
Total budget
₱8.2B
Average progress
95.7%
Completion rate
89.3%
Average risk score
48.1
Medium risk on average, out of 100
Flagged as unusual
8
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 164 | ₱7.7B | 48.7 | 7 | 95.5% |
| Cordillera Administrative Region | 16 | ₱338.2M | 41.6 | 0 | 96.0% |
| Region II | 7 | ₱176.6M | 48.4 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 72 | ₱3.6B | 46.8 | 0 | 95.9% |
| Flood Control and Drainage | 67 | ₱3B | 48.6 | 1 | 99.4% |
| Buildings and Facilities | 28 | ₱185.8M | 39.7 | 0 | 99.3% |
| Bridges | 10 | ₱888.6M | 59.0 | 4 | 65.3% |
| OTHER | 4 | ₱214.3M | 79.6 | 2 | 87.5% |
| Bridges, Roads | 3 | ₱300.4M | 60.1 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱6.3M | 34.4 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱4.9M | 96.1 | 1 | 49.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AB0148BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. BUNGRO, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 49% | High risk96 | Flagged0.033 |
| 24AC0105CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAGPAT, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.4M | 95% | High risk88 | Flagged0.061 |
| 24AB0106CONSTRUCTION OF 4- STOREY 12-CLASSROOM SCHOOL BUILDING IN SAN NICOLAS NATIONAL HIGH SCHOOL, BARANGAY 24, MUNICIPALITY OF SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱39.4M | 55% | High risk88 | Flagged0.067 |
| 24A00290CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, PAOAY, ILOCOS NORTE | Region I | Region I | Completed | ₱115.8M | 100% | High risk75 | —-0.021 |
| 17AI0030IMPVT/WIDENING OF NATL RD ALONG PNER, KO 180+417 - KO 181+745; KO 183+929-KO184+062 | Region I | Pangasinan 3rd DEO | Completed | ₱46.4M | 100% | High risk72 | —-0.031 |
| 18AD0012CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS , MANILA NORTH ROAD, K0386+000-K0389+000(R/S) | Region I | Ilocos Sur 2nd DEO | Completed | ₱32.1M | 100% | High risk70 | —-0.024 |
| 23AA0031CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER ALONG LAOAG (SARRAT) RIVER, BARANGAY 10, SAN MIGUEL, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱19.6M | 100% | High risk70 | —-0.068 |
| 24A00124WIDENING OF PERMANENT BRIDGES, BADOC PARALLEL BR. ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱39.6M | 1% | High risk69 | Flagged0.017 |
| 24A00360CONSTRUCTION OF MISSING LINKS/NEW ROADS, ROAD CONNECTING SANTA-RANCHO ROAD (S00089LZ) AND SANTA-CAOAYAN ROAD, ILOCOS SUR | Region I | Region I | Completed | ₱149.7M | 100% | High risk68 | —-0.002 |
| 23A00164CONSTRUCTION OF MISSING LINKS/ NEW ROADS - CABUGAO-NUEVA ERA-DANGLAS ROAD, CABUGAO SECTION, ILOCOS SUR | Region I | Region I | Completed | ₱60.7M | 100% | High risk66 | —-0.046 |
| 17AE0034REHABILITATION AND IMPROVEMENT OF AMBURAYAN RIVER AT BRGY. NAMALTUGAN, SUDIPEN, LA UNION | Region I | La Union 1st DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.045 |
| 23A00050CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADUNGON RIVER, BOTH BANK, BARANGAY BAGBAGO, SOLSONA, ILOCOS NORTE | Region I | Region I | Completed | ₱96.5M | 100% | High risk64 | —-0.052 |
| 24A00012CONSTRUCTION OF MISSING LINKS/NEW ROADS, BANTAY (ILOCOS SUR) - SAN QUINTIN - LANGIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 5) | Region I | Region I | Completed | ₱154M | 100% | High risk63 | —-0.024 |
| 16AD0142CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES: CONSTRUCTION OF BREAKWATER/HEXAPODS OF SANTA SEAWALL,SANTA, ILOCOS SUR 2ND LD | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk63 | —-0.040 |
| 16AD0143CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES: CONSTRUCTION OF ABRA RIVER CONTROL,SANTA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.6M | 100% | High risk63 | —-0.042 |
| 23A00145WIDENING OF PERMANENT BRIDGES - BADOC PARALLEL BR. (B00564LZ) ALONG MANILA NORTH RD | Region I | Region I | Completed | ₱153.4M | 100% | High risk63 | —-0.023 |
| 25AB0024BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PANGIL, CURRIMAO, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.8M | 80% | High risk62 | —-0.037 |
| 22A00260CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN AT BARANGAYS BUCAO WEST, BUCAO EAST, LANTAG, BARITAO AND TARANGOTON | Region I | Region I | Completed | ₱241.2M | 100% | High risk62 | —-0.033 |
| 16BB0099CONSTRUCTION OF CASAMBALANGAN RIVER CONTROL PROJECT CASAMBALANGAN, STA. ANA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱20M | 100% | High risk62 | —-0.033 |
| 16BB0101CONSTRUCTION OF PALAWIG RIVER CONTROL PROJECT STA. ANA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱20.1M | 100% | High risk62 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AB0106CONSTRUCTION OF 4- STOREY 12-CLASSROOM SCHOOL BUILDING IN SAN NICOLAS NATIONAL HIGH SCHOOL, BARANGAY 24, MUNICIPALITY OF SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱39.4M | 55% | High risk88 | Flagged0.067 |
| 24AC0105CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAGPAT, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱96.4M | 95% | High risk88 | Flagged0.061 |
| 25AB0148BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. BUNGRO, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 49% | High risk96 | Flagged0.033 |
| 24A00124WIDENING OF PERMANENT BRIDGES, BADOC PARALLEL BR. ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱39.6M | 1% | High risk69 | Flagged0.017 |
| 25A00438SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF ROAD CONNECTING TO SANTA-RANCHO (S00089LZ) TO SANTA-CAOAYAN ROAD (PHASE 2), ILOCOS SUR | Region I | Region I | On-Going | ₱93.6M | 25% | High risk62 | Flagged0.011 |
| 17BI0126REHABILITATION/IMPROVEMENT OF BAKIR FLOOD CONTROL STRUCTURES (STA.0+000-STA. 0+507.10), BAGABAG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱18.6M | 100% | Medium risk57 | Flagged0.002 |
| 25A00106CONSTRUCTION OF MISSING LINKS/ NEW ROADS - BANTAY (ILOCOS SUR) - SAN QUINTIN-LANGIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 6) | Region I | Region I | On-Going | ₱94.5M | 50% | High risk62 | Flagged0.001 |
| 25A00424CONSTRUCTION OF MISSING LINKS/ NEW ROADS, ROAD CONNECTING SANTA-RANCHO ROAD (S00089LZ) AND SANTA-CAOAYAN ROAD, ILOCOS SUR (PACKAGE 3) | Region I | Region I | On-Going | ₱89.8M | 54% | Medium risk55 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 18AF0029CONST/REHAB OF BAUANG RIVER FLOOD CONTROL, PUGO, BAUANG, LU | Region I | La Union 2nd DEO | Completed | ₱24.7M | 100% | Medium risk44 | —-0.070 |
| 127 | 20A00196LOCAL INFRASTRUCTURE PROGRAM - REPAIR/ REHABILITATION OF FLOOD CONTROL ALONG LIBTONG CREEK, BRGY. LIBTONG, TAGUDIN, ILOCOS SUR | Region I | Region I | Completed | ₱9.9M | 100% | Medium risk44 | —-0.071 |
| 128 | 20A00177CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BIMMANGA FAROLA RIVER, STA. 0+000-STA. 0+190, BRGYS. BIMMANGA FAROLA, TAGUDIN, ILOCOS SUR | Region I | Region I | Completed | ₱20M | 100% | Medium risk44 | —-0.071 |
| 129 | 18AC0041CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER, PAING SECTION, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱19.9M | 100% | Medium risk44 | —-0.069 |
| 130 | 19PD0020OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF LAYBYS- ON SPECIFIC LOCATION ALONG KENNON ROAD (S00407LZ) KO241+551 TO KO245+828 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱22.1M | 100% | Medium risk44 | —-0.078 |
| 131 | 23PD0023NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS: KENNON RD. K0247+285 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱19.6M | 100% | Medium risk44 | —-0.082 |
| 132 | 22PD0010ROAD WIDENING-SECONDARY ROADS-MAJOR MANE RD. K0247+510-K0248+000 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱18.8M | 100% | Medium risk44 | —-0.083 |
| 133 | 18PD0035CONTRACT PACKAGE 11: NETWORK DEVELOPMENT-NETWORK DEVELOPMENT-OFF CARRIAGEWAY IMPROVEMENT: A) KENNON ROAD (KO248+147) B) KENNON ROAD (KO244+845) | Cordillera Administrative Region | Baguio City DEO | Completed | ₱23.5M | 100% | Medium risk44 | —-0.084 |
| 134 | 23A00028CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TAGUDIN BYPASS ROAD, ILOCOS SUR | Region I | Region I | Completed | ₱28.6M | 100% | Medium risk44 | —-0.087 |
| 135 | 18AF0018NETWORK DEV, RD WIDENING OF PRIMARY RDS ALONG RABON-DAMORTIS RD, K0404+332-K0404+734, K0405+384-K040 | Region I | La Union 2nd DEO | Completed | ₱36M | 100% | Medium risk44 | —-0.086 |
| 136 | 22A00120CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT), POBLACION-PUGUIL-TUBADAY ROAD CONNECTING BALAOAN-SANTOL ROAD IN SUPPORT TO SOFT BR | Region I | Region I | Completed | ₱35.2M | 100% | Medium risk44 | —-0.084 |
| 137 | 18AF0061REHAB/RECONS OF RDS W/ SLIPS, SLOPE COLLAPSE & LANDSLIDE, 2ND RDS ALONG ROSARIO-PUGO RD, PUGO, LU | Region I | La Union 2nd DEO | Completed | ₱42.3M | 100% | Medium risk44 | —-0.085 |
| 138 | 21A00128CONSTRUCTION OF MISSING LINKS/NEW ROADS-SANTOL (LA UNION) - KIBUNGAN (BENGUET) ROAD, LA UNION | Region I | Region I | Completed | ₱29M | 100% | Medium risk44 | —-0.087 |
| 139 | 18AC0023CONSTRUCTION OF FLOOD CONTROL ALONG CABUGAO - TUROD - ARNAP - PATAC RIVER, CABUGAO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱17.8M | 100% | Medium risk44 | —-0.067 |
| 140 | 18AC0011CONSTRUCTION OF REVETMENT WALL ALONG BANTAY RIVER, BRGY. TALEB, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱12.1M | 100% | Medium risk44 | —-0.070 |
| 141 | 19AC0046CONSTRUCTION OF FLOOD CONTROL ALONG BANTAY RIVER, BRGY. TALEB, BANTAY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.067 |
| 142 | 24A00189CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), VIGAN BOARDWALK ROAD LEADING TO THE HERITAGE VILLAGE, VIGAN CITY, ILOCOS SUR | Region I | Region I | Completed | ₱9.6M | 100% | Medium risk44 | —-0.084 |
| 143 | 18AC0006CONSTRUCTION OF SEAWALL, CABITTAOGAN, STA. CATALINA, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱7.8M | 100% | Medium risk44 | —-0.067 |
| 144 | 18AF0050CONST/IMPROVEMENT OF ACCESS RD LEADING TO ARNGAY-TUBAO ALT RD LEADING TO ASIN HOT SPRING & BAG CITY | Region I | La Union 2nd DEO | Completed | ₱27.5M | 100% | Medium risk44 | —-0.086 |
| 145 | 25A00214CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), PUNTA-SUBEC-MINDANAO-PARATONG-TAMORONG ROADS CONNECTING FISHPONDS AND AGRICULTUR | Region I | Region I | On-Going | ₱9.4M | 10% | Medium risk44 | —-0.017 |
| 146 | 18AC0005CONSTRUCTION OF SEAWALL, PARATONG - SUBEC, STA. CATALINA, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱17.6M | 100% | Medium risk43 | —-0.068 |
| 147 | 18AC0045CONSTRUCTION OF RIVER FLOOD CONTROL, ARNAP, CABUGAO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱7.5M | 100% | Medium risk43 | —-0.069 |
| 148 | 21PD0026OFF-CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS-SOUTH DRIVE-K0251+(-295)-K0251+755 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱9.4M | 100% | Medium risk43 | —-0.082 |
| 149 | 21AB0112REHABILITATION/IMPROVEMENT OF PAOAY-CABALINGASAN ROAD (KM468.483 - 469.883), PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱5M | 100% | Medium risk43 | —-0.083 |
| 150 | 25AC0009CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) PUG-OS - SALAPASAP - NAMRUANGAN - DACLAPAN ROAD LEADING TO PUBLIC BEACHES AND SURFING AREA, CABUGAO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | On-Going | ₱4.9M | 96% | Medium risk43 | —-0.048 |