Contractor dossier
63 projects on file, including joint ventures this contractor is part of.
Total projects
63
Total budget
₱4.3B
Average progress
86.4%
Completion rate
69.8%
Below 70%
Average risk score
56.3
Medium risk on average, out of 100
Flagged as unusual
8
12.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 58 | ₱4.1B | 57.0 | 8 | 85.2% |
| National Capital Region | 4 | ₱86.4M | 49.0 | 0 | 100.0% |
| Region IV-B | 1 | ₱44.1M | 42.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 46 | ₱3.5B | 58.6 | 5 | 87.0% |
| Roads | 14 | ₱543.9M | 46.7 | 2 | 88.6% |
| GAA 2025 SSP | 1 | ₱74.1M | 94.8 | 1 | 0.0% |
| OTHER | 1 | ₱96.5M | 72.0 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱25.7M | 28.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CC0062CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PAGALA (PUROK 1), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 0% | High risk95 | Flagged0.028 |
| 24CC0624CONSTRUCTION OF FLOOD CONTROL STRUCTURE (WATER INTERCEPTOR) ALONG MANILA NORTH ROAD, PHASE 1, BULIHAN LONGOS SECTION, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱139M | 57% | High risk83 | Flagged0.053 |
| 24CC0579CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE G, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0578CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE F, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0625CONSTRUCTION OF FLOOD CONTROL STRUCTURE (WATER INTERCEPTOR) ALONG MANILA NORTH ROAD, PHASE 1, MALOLOS SECTION, BARANGAY DAKILA, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱139M | 59% | High risk83 | Flagged0.052 |
| 25CC0490CONSTRUCTION OF REINFORCED CONCRETE RIVER PROTECTION ALONG BALAGTAS RIVER, BARANGAY SAN JUAN, PUROK 1, BALAGTAS, BULACAN (PACKAGE D) | Region III | Bulacan 1st DEO | On-Going | ₱95M | 62% | High risk81 | —-0.010 |
| 24CC0038CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT MALIS (PAHSE II) GUIGUINTO, BUALACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 100% | High risk81 | —-0.019 |
| 24CC0039CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY MALIS, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 23CC0551CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WAR=TERWAYS ALONG GUIGUINTO RIVER BRGY, DAUNGAN GUIGUINTO, BULACAN STA. 004+690 TO STA. 004+890 | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.005 |
| 23CC0552CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY. STA. CRUZ GUIGUINTO, BULACAN STA. 005+430 TO STA. 005+630 | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.005 |
| 24CC0616ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MANILA NORTH RD - K0043+000-K0045+809, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 96% | High risk76 | Flagged0.025 |
| 24CC0626PREVENTIVE MAINTENANCE - TERTIARY ROADS - BIGAA-PLARIDEL VIA BULACAN AND MALOLOS RD - K0033+026-K0034+000, K0034+106-K0035+200, K0036+107-K0037+736.7, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 45% | High risk76 | Flagged0.033 |
| 25CC0198CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY LOLOMBOY, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱78.7M | 78% | High risk76 | —-0.022 |
| 24CC0160CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG BOCAUE RIVER (PHASE I), BARANGAY BAMBANG (PUROK 6), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱78.2M | 100% | High risk76 | —-0.026 |
| 25CC0324CONSTRUCTION OF FLOOD MITIGATION FACILITY AT BUNLO-LOLOMBOY TRIBUTARIES, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 0% | High risk76 | —-0.001 |
| 24CC0397CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY SIPAT, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 24CC0382CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY PARULAN (PUROK 2), PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 100% | High risk76 | —-0.029 |
| 25CC0108CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY SAN PEDRO (PUROK 2), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 89% | High risk76 | —-0.030 |
| 25CC0130CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY SAN PEDRO (PUROK 2), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 96% | High risk76 | —-0.033 |
| 24CC0369CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY SAN PEDRO (PUROK 2), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.061 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CC0579CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE G, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0578CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE F, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0624CONSTRUCTION OF FLOOD CONTROL STRUCTURE (WATER INTERCEPTOR) ALONG MANILA NORTH ROAD, PHASE 1, BULIHAN LONGOS SECTION, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱139M | 57% | High risk83 | Flagged0.053 |
| 24CC0625CONSTRUCTION OF FLOOD CONTROL STRUCTURE (WATER INTERCEPTOR) ALONG MANILA NORTH ROAD, PHASE 1, MALOLOS SECTION, BARANGAY DAKILA, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱139M | 59% | High risk83 | Flagged0.052 |
| 24CC0626PREVENTIVE MAINTENANCE - TERTIARY ROADS - BIGAA-PLARIDEL VIA BULACAN AND MALOLOS RD - K0033+026-K0034+000, K0034+106-K0035+200, K0036+107-K0037+736.7, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 45% | High risk76 | Flagged0.033 |
| 25CC0062CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PAGALA (PUROK 1), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 0% | High risk95 | Flagged0.028 |
| 24CC0616ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MANILA NORTH RD - K0043+000-K0045+809, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 96% | High risk76 | Flagged0.025 |
| 23CC0490CONSTRUCTION OF BALAGTAS RIVER FLOOD MITIGATION STRUCTURE (STA. 14+124 TO STA. 14+274) AT BRGY. SAN JUAN, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 69% | Medium risk48 | Flagged0.021 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CC0062CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PAGALA (PUROK 1), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 0% | High risk95 | Flagged0.028 |
| 2 | 24CC0624CONSTRUCTION OF FLOOD CONTROL STRUCTURE (WATER INTERCEPTOR) ALONG MANILA NORTH ROAD, PHASE 1, BULIHAN LONGOS SECTION, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱139M | 57% | High risk83 | Flagged0.053 |
| 3 | 24CC0579CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE G, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 4 | 24CC0578CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE F, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 5 | 24CC0625CONSTRUCTION OF FLOOD CONTROL STRUCTURE (WATER INTERCEPTOR) ALONG MANILA NORTH ROAD, PHASE 1, MALOLOS SECTION, BARANGAY DAKILA, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱139M | 59% | High risk83 | Flagged0.052 |
| 6 | 25CC0490CONSTRUCTION OF REINFORCED CONCRETE RIVER PROTECTION ALONG BALAGTAS RIVER, BARANGAY SAN JUAN, PUROK 1, BALAGTAS, BULACAN (PACKAGE D) | Region III | Bulacan 1st DEO | On-Going | ₱95M | 62% | High risk81 | —-0.010 |
| 7 | 24CC0038CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT MALIS (PAHSE II) GUIGUINTO, BUALACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 100% | High risk81 | —-0.019 |
| 8 | 24CC0039CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY MALIS, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 9 | 23CC0551CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WAR=TERWAYS ALONG GUIGUINTO RIVER BRGY, DAUNGAN GUIGUINTO, BULACAN STA. 004+690 TO STA. 004+890 | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.005 |
| 10 | 23CC0552CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY. STA. CRUZ GUIGUINTO, BULACAN STA. 005+430 TO STA. 005+630 | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.005 |
| 11 | 24CC0616ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MANILA NORTH RD - K0043+000-K0045+809, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 96% | High risk76 | Flagged0.025 |
| 12 | 24CC0626PREVENTIVE MAINTENANCE - TERTIARY ROADS - BIGAA-PLARIDEL VIA BULACAN AND MALOLOS RD - K0033+026-K0034+000, K0034+106-K0035+200, K0036+107-K0037+736.7, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 45% | High risk76 | Flagged0.033 |
| 13 | 25CC0198CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY LOLOMBOY, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱78.7M | 78% | High risk76 | —-0.022 |
| 14 | 24CC0160CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG BOCAUE RIVER (PHASE I), BARANGAY BAMBANG (PUROK 6), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱78.2M | 100% | High risk76 | —-0.026 |
| 15 | 25CC0324CONSTRUCTION OF FLOOD MITIGATION FACILITY AT BUNLO-LOLOMBOY TRIBUTARIES, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 0% | High risk76 | —-0.001 |
| 16 | 24CC0397CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY SIPAT, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 17 | 24CC0382CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY PARULAN (PUROK 2), PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 100% | High risk76 | —-0.029 |
| 18 | 25CC0108CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY SAN PEDRO (PUROK 2), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 89% | High risk76 | —-0.030 |
| 19 | 25CC0130CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY SAN PEDRO (PUROK 2), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 96% | High risk76 | —-0.033 |
| 20 | 24CC0369CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY SAN PEDRO (PUROK 2), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.061 |
| 21 | 25CC0066CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY TANGOS (PUROK 3), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 0% | High risk76 | —-0.001 |
| 22 | 24CC0368CONSTRUCTION OF REINFORCED CONCRETE FL;OOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY POBLACION (PUROK 1), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.061 |
| 23 | 22CC0274REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS- DAANG MAHARLIKA ROAD (LZ) - PULILAN SECTION, PULILAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.030 |
| 24 | 20CC0199CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BOCAUE RIVER AND ITS TRIBUTARIES, BUNLO-LOLOMBOY SECTION, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | Medium risk57 | —-0.076 |
| 25 | 22CC0236CONSTRUCTION OF MAJOR RIVER SYSTEM, ANGAT RIVER, CULIANIN AND MAKINABANG SECTION, STA. 00+632 TO STA. 01+007, PLARIDEL/BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱95.5M | 100% | Medium risk57 | —-0.080 |