Contractor dossier
370 projects on file, including joint ventures this contractor is part of.
Total projects
370
Total budget
₱10.8B
Average progress
93.3%
Completion rate
85.4%
Average risk score
46.7
Medium risk on average, out of 100
Flagged as unusual
2
0.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 277 | ₱6B | 44.5 | 1 | 92.7% |
| Region IV-A | 78 | ₱4.1B | 53.6 | 1 | 95.0% |
| Region III | 6 | ₱110.6M | 43.2 | 0 | 91.7% |
| Region V | 4 | ₱168.8M | 54.3 | 0 | 100.0% |
| Central Office | 3 | ₱352.1M | 74.9 | 0 | 100.0% |
| Region IV-B | 2 | ₱88.2M | 41.1 | 0 | 95.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 252 | ₱5.4B | 44.1 | 0 | 92.7% |
| Flood Control and Drainage | 92 | ₱4.7B | 50.8 | 1 | 97.1% |
| Buildings and Facilities | 17 | ₱298M | 47.1 | 0 | 84.8% |
| GAA 2025 OO-1 | 6 | ₱138.4M | 82.7 | 1 | 81.2% |
| OTHER | 2 | ₱94.2M | 70.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱95.3M | 71.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DO0016ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MANILA EAST RD - K0044 + 910 - K0045 + 000, K0054 + 132 - K0054 + 619, K0054 + 859 - K0056 + 000 | Region IV-A | Rizal 2nd DEO | On-Going | ₱48.2M | 97% | High risk91 | —-0.016 |
| 25OC0058ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS-NINOY AQUINO AVE - K0011 + 938 - K0010 + 526PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱40.8M | 95% | High risk86 | —-0.018 |
| 25OC0040ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -PRIMARY ROADS - PARAÑAQUE-SUCAT RD - K0017 + 663 -K0016 + 000PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱21.6M | 95% | High risk86 | —-0.017 |
| 25OC0039ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS-PARAÑAQUE-SUCAT RD - K0016 + 234- K0016 + 349PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱6.6M | 0% | High risk85 | Flagged0.009 |
| 25OC0038ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS-PARANAQUE-SUCAT RD - K0015 + 372 - K0015 + 728PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱20.2M | 100% | High risk78 | —-0.043 |
| 18C00052DREDGING OF GUAGUA-PASAC RIVER, SASMUAN, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱187.5M | 100% | High risk77 | —-0.034 |
| 21O00095CONSTRUCTION OF RIVERWALLS (INTERMITTENT SECTIONS) ALONG MALABON-TULLAHAN RIVER (UPSTREAM SIDE), BRGY. POTRERO, MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱92.4M | 100% | High risk75 | —-0.069 |
| 20C00050REHABILITATION OF PAMPANGA RIVER (INLCUDING PULO) AT ARAYAT AND MACABEBE, PAMPANGA, PROVINCE OF PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱72.1M | 100% | High risk73 | —-0.022 |
| 24DF0154ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSREHABILITATION OF ROAD ALONG KAWIT-NOVELETA DIVERSION RD K0022+151-K0022 + 528, K0023+000-K0023+750 | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 0% | High risk73 | —-0.001 |
| 25DF0036ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADSKAWIT-NOVELETA DIV RD. - K0024 + 495 - K0025 + 438 | Region IV-A | Cavite 1st DEO | On-Going | ₱103.9M | 100% | High risk72 | —-0.044 |
| 25OH0025ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE/BANK IMPV'T. OF MARICABAN CREEK, STA. 0+936 TO STA.1+170 | National Capital Region | South Manila DEO | Completed | ₱95.3M | 100% | High risk72 | —-0.043 |
| 24DO0069ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES | Region IV-A | Rizal 2nd DEO | Completed | ₱49M | 100% | High risk71 | —-0.041 |
| 24DJ0185OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, QUEZON-BATANGAS RD - K0106 + 284 - K0107 + 489 | Region IV-A | Quezon 2nd DEO | On-Going | ₱96.5M | 92% | High risk71 | —-0.034 |
| 24DO0053ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MARIKINA-INFANTA RD - K0040+205 - K0041+744 | Region IV-A | Rizal 2nd DEO | Completed | ₱45.2M | 100% | High risk70 | —-0.040 |
| 25OC0008ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EDSA/GUADALUPE CLOVERLEAF RD-(S04000LZ) CHAINAGE 000-CHAINAGE 028, CHAINAGE 196-CHAINAGE 203,MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱1.1M | 100% | High risk70 | —-0.021 |
| 25CP0027FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVERBANK PROTECTION ALONG MAASIM RIVER, BARANGAY SAPANG PUTIK, PHASE II, SAPANG PUTIK, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱28.5M | 50% | High risk69 | —-0.018 |
| 17CH0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/IMPROVEMEN | Region III | Pampanga 2nd DEO | Completed | ₱40.1M | 100% | High risk68 | —-0.061 |
| 25OC0123CONSTRUCTION OF REVETMENT ALONG PARAÑAQUE RIVER, DISTRICT 1,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱94.6M | 18% | High risk67 | —-0.025 |
| 17DQ0041MFO 2 - FOOD MANAGEMENT SERVICES, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATON STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG METIZO RIVER, BARANGAY HABAY 2, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱9.3M | 100% | High risk67 | —-0.059 |
| 24DF0272ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE & RELIABLE NATIONAL RD SYSTEMASSET PRESERVATION PROGREHAB/ RECONST/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADSKAWIT-NOVELETA-DIVERSION RD - K0022 + (-224) - K0022 + 143, K0022 + 151-K0022+450 | Region IV-A | Cavite 1st DEO | On-Going | ₱14.2M | 0% | High risk67 | —-0.009 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23DF0201CONSTRUCTION OF REVETMENT ALONG TAGUILID RIVER, BRGY. KAINGEN, KAWIT, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱28.7M | 100% | Medium risk52 | Flagged0.014 |
| 25OC0039ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS-PARAÑAQUE-SUCAT RD - K0016 + 234- K0016 + 349PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱6.6M | 0% | High risk85 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 301 | 23OC0030ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE SECONDARY ROADS-NINOY AQUINO AVE.-K0012+077-K0012+240,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱6.9M | 100% | Medium risk46 | —-0.093 |
| 302 | 23OC0029ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE SECONDARY ROADS-NINOY AQUINO AVE.-K0011+517-K0011+793, PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱6.9M | 100% | Medium risk46 | —-0.094 |
| 303 | 24OC0031ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-PARAÑAQUE-SUCAT RD K0015+041-K0015+372PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.094 |
| 304 | 20OI0086PREVENTIVE MAINTENANCE TERTIARY ROAD: SOUTH SUPER H-WAY WEST SERVICE ROAD, K0021+000-K0021+465 , MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱10.6M | 100% | Medium risk46 | —-0.095 |
| 305 | 23OC0025ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE PRIMARY ROADS-PARAÑAQUE SUCAT RD.-K0015+023-K0016+000,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱11.4M | 100% | Medium risk46 | —-0.096 |
| 306 | 24OB0156ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCESECONDARY ROADS-GENERAL SANTOS AVE. - K0025+480 - K0025+670 (WESTBOUND), K0025+632 - K0025+668 (EASTBOUND) | National Capital Region | Metro Manila 1st DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.096 |
| 307 | 23OC0028ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS-NINOY AQUINO AVE.- K0011+375-K0011+649PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱6.9M | 100% | Medium risk46 | —-0.096 |
| 308 | 18OH0073PROPOSED PREVENTIVE MAINTENANCE ALONG SOUTH SUPER HIGHWAY WEST SERVICE ROAD (K0031+227-K0012+280),PA | National Capital Region | South Manila DEO | Completed | ₱12.3M | 100% | Medium risk46 | —-0.097 |
| 309 | 23OC0027ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE SECONDARY ROADS-NINOY AQUINO AVE.-K0010+(-650)-K0010+020,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱8.7M | 100% | Medium risk46 | —-0.097 |
| 310 | 21OH0049ORGANIZATIONAL OUTCOME 1 :ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS-NAIA ROAD (MIA ROAD)-K0008+661 TO K0008+701,K0009+216 TO K0009+463, PASAY CITY | National Capital Region | South Manila DEO | Completed | ₱10.9M | 100% | Medium risk46 | —-0.097 |
| 311 | 19OC0002ASSET PRESERVATION, PREVENTIVE MAINTENANCE OF SECONDARY ROADS ASPHALT OVERLAY OF NAIA (MIA ROAD) - CHAINAGE 000 - CHAINAGE 541PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱8.9M | 100% | Medium risk46 | —-0.098 |
| 312 | 24OC0005ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS-NAIA ROAD (MIA ROAD)-(S03317LZ) CHAINAGE 0+217-CHAINAGE 0+541PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱6.4M | 100% | Medium risk46 | —-0.099 |
| 313 | 20OH0018OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE- | National Capital Region | South Manila DEO | Completed | ₱8.9M | 100% | Medium risk46 | —-0.095 |
| 314 | 21OE0038PREVENTIVE MAINTENANCE - TERTIARY ROADS - DAGUPAN ST - K0004 + (-223) - K0004 + 108 | National Capital Region | North Manila DEO | Completed | ₱8.9M | 100% | Medium risk46 | —-0.100 |
| 315 | 19OE0117ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM:ASSET PRESERVATION - PREVENTIVE MAINTENANCE TERTIARY ROAD - JUAN LUNA ST. K0004 + 090.00TO K0004 + 800.00 | National Capital Region | North Manila DEO | Completed | ₱11.2M | 100% | Medium risk46 | —-0.100 |
| 316 | 21OE0034PREVENTIVE MAINTENANCE - TERTIARY ROADS - VITAS ST - CHAINAGE 0 - CHAINAGE 289.40 | National Capital Region | North Manila DEO | Completed | ₱5M | 100% | Medium risk45 | —-0.098 |
| 317 | 22OE0039PREVENTIVE MAINTENANCE - TERTIARY ROADS - DEL PAN EXT. RD - (S02380LZ) CHAINAGE 0 - CHAINAGE 323.1, (S02381LZ) CHAINAGE 0 - CHAINAGE 309 | National Capital Region | North Manila DEO | Completed | ₱10.8M | 100% | Medium risk45 | —-0.099 |
| 318 | 24OE0101PREVENTIVE MAINTENANCE - TERTIARY ROADS - DEL PAN ST - (S02327LZ) CHAINAGE 249.2 - CHAINAGE 516.8 | National Capital Region | North Manila DEO | Completed | ₱8.1M | 100% | Medium risk45 | —-0.100 |
| 319 | 18OA0064CONST./SEALING/IMPVT OF RIVERWALL ALONG PINAGKABALIAN RIVER (STA.2+340 TO STA.2+226)(PHASE 1) BRGY. | National Capital Region | Malabon-Navotas DEO | Completed | ₱46.3M | 100% | Medium risk45 | —-0.079 |
| 320 | 23OC0120CONSTRUCTION OF 4 STY 4CL WITH ANCILLARY ROOM, STO. NIÑO ELEMENTARY SCHOOL PHASE 1 (3 STY 3CL WITH ANCILLARY ROOM),PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱20M | 100% | Medium risk45 | —-0.049 |
| 321 | 24OC0142CONSTRUCTION OF 4-STOREY SCHOOL BUILDING WITH ANCILLARY ROOM AT STO. NIÑO ELEMENTARY SCHOOL (PHASE 2), BRGY. STO. NIÑO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱9.8M | 64% | Medium risk45 | —-0.005 |
| 322 | 22OE0044PREVENTIVE MAINTENANCE - TERTIARY ROADS - UGBO ST. (S02385LZ) CHAINAGE 0 - CHAINAGE 128 | National Capital Region | North Manila DEO | Completed | ₱4.7M | 100% | Medium risk43 | —-0.098 |
| 323 | 24OH0032ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-M. ADRIATICO -K0002 + 809 - K0002 + 854 | National Capital Region | South Manila DEO | Completed | ₱4.7M | 100% | Medium risk43 | —-0.095 |
| 324 | 24EB0067CONSTRUCTION OF BUSUANGA FLOOD CONTROL STRUCTURE, SAN JOSE, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱49M | 90% | Medium risk43 | —-0.028 |
| 325 | 19DQ0141CONSTRUCTION OF ROAD AT GREENVALLEY, SAN NICOLAS 3, BACOOR, CAVITE AND CONCRETING OF ROAD AT GREENVALLEY IN BRGY. SAN NICOLAS 3, BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱10.6M | 100% | Medium risk43 | —-0.057 |