Contractor dossier
370 projects on file, including joint ventures this contractor is part of.
Total projects
370
Total budget
₱10.8B
Average progress
93.3%
Completion rate
85.4%
Average risk score
46.7
Medium risk on average, out of 100
Flagged as unusual
2
0.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 277 | ₱6B | 44.5 | 1 | 92.7% |
| Region IV-A | 78 | ₱4.1B | 53.6 | 1 | 95.0% |
| Region III | 6 | ₱110.6M | 43.2 | 0 | 91.7% |
| Region V | 4 | ₱168.8M | 54.3 | 0 | 100.0% |
| Central Office | 3 | ₱352.1M | 74.9 | 0 | 100.0% |
| Region IV-B | 2 | ₱88.2M | 41.1 | 0 | 95.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 252 | ₱5.4B | 44.1 | 0 | 92.7% |
| Flood Control and Drainage | 92 | ₱4.7B | 50.8 | 1 | 97.1% |
| Buildings and Facilities | 17 | ₱298M | 47.1 | 0 | 84.8% |
| GAA 2025 OO-1 | 6 | ₱138.4M | 82.7 | 1 | 81.2% |
| OTHER | 2 | ₱94.2M | 70.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱95.3M | 71.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DO0016ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MANILA EAST RD - K0044 + 910 - K0045 + 000, K0054 + 132 - K0054 + 619, K0054 + 859 - K0056 + 000 | Region IV-A | Rizal 2nd DEO | On-Going | ₱48.2M | 97% | High risk91 | —-0.016 |
| 25OC0058ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS-NINOY AQUINO AVE - K0011 + 938 - K0010 + 526PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱40.8M | 95% | High risk86 | —-0.018 |
| 25OC0040ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -PRIMARY ROADS - PARAÑAQUE-SUCAT RD - K0017 + 663 -K0016 + 000PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱21.6M | 95% | High risk86 | —-0.017 |
| 25OC0039ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS-PARAÑAQUE-SUCAT RD - K0016 + 234- K0016 + 349PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱6.6M | 0% | High risk85 | Flagged0.009 |
| 25OC0038ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS-PARANAQUE-SUCAT RD - K0015 + 372 - K0015 + 728PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱20.2M | 100% | High risk78 | —-0.043 |
| 18C00052DREDGING OF GUAGUA-PASAC RIVER, SASMUAN, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱187.5M | 100% | High risk77 | —-0.034 |
| 21O00095CONSTRUCTION OF RIVERWALLS (INTERMITTENT SECTIONS) ALONG MALABON-TULLAHAN RIVER (UPSTREAM SIDE), BRGY. POTRERO, MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱92.4M | 100% | High risk75 | —-0.069 |
| 20C00050REHABILITATION OF PAMPANGA RIVER (INLCUDING PULO) AT ARAYAT AND MACABEBE, PAMPANGA, PROVINCE OF PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱72.1M | 100% | High risk73 | —-0.022 |
| 24DF0154ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSREHABILITATION OF ROAD ALONG KAWIT-NOVELETA DIVERSION RD K0022+151-K0022 + 528, K0023+000-K0023+750 | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 0% | High risk73 | —-0.001 |
| 25DF0036ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADSKAWIT-NOVELETA DIV RD. - K0024 + 495 - K0025 + 438 | Region IV-A | Cavite 1st DEO | On-Going | ₱103.9M | 100% | High risk72 | —-0.044 |
| 25OH0025ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE/BANK IMPV'T. OF MARICABAN CREEK, STA. 0+936 TO STA.1+170 | National Capital Region | South Manila DEO | Completed | ₱95.3M | 100% | High risk72 | —-0.043 |
| 24DO0069ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES | Region IV-A | Rizal 2nd DEO | Completed | ₱49M | 100% | High risk71 | —-0.041 |
| 24DJ0185OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, QUEZON-BATANGAS RD - K0106 + 284 - K0107 + 489 | Region IV-A | Quezon 2nd DEO | On-Going | ₱96.5M | 92% | High risk71 | —-0.034 |
| 24DO0053ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MARIKINA-INFANTA RD - K0040+205 - K0041+744 | Region IV-A | Rizal 2nd DEO | Completed | ₱45.2M | 100% | High risk70 | —-0.040 |
| 25OC0008ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EDSA/GUADALUPE CLOVERLEAF RD-(S04000LZ) CHAINAGE 000-CHAINAGE 028, CHAINAGE 196-CHAINAGE 203,MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱1.1M | 100% | High risk70 | —-0.021 |
| 25CP0027FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVERBANK PROTECTION ALONG MAASIM RIVER, BARANGAY SAPANG PUTIK, PHASE II, SAPANG PUTIK, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱28.5M | 50% | High risk69 | —-0.018 |
| 17CH0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/IMPROVEMEN | Region III | Pampanga 2nd DEO | Completed | ₱40.1M | 100% | High risk68 | —-0.061 |
| 25OC0123CONSTRUCTION OF REVETMENT ALONG PARAÑAQUE RIVER, DISTRICT 1,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱94.6M | 18% | High risk67 | —-0.025 |
| 17DQ0041MFO 2 - FOOD MANAGEMENT SERVICES, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATON STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG METIZO RIVER, BARANGAY HABAY 2, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱9.3M | 100% | High risk67 | —-0.059 |
| 24DF0272ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE & RELIABLE NATIONAL RD SYSTEMASSET PRESERVATION PROGREHAB/ RECONST/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADSKAWIT-NOVELETA-DIVERSION RD - K0022 + (-224) - K0022 + 143, K0022 + 151-K0022+450 | Region IV-A | Cavite 1st DEO | On-Going | ₱14.2M | 0% | High risk67 | —-0.009 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23DF0201CONSTRUCTION OF REVETMENT ALONG TAGUILID RIVER, BRGY. KAINGEN, KAWIT, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱28.7M | 100% | Medium risk52 | Flagged0.014 |
| 25OC0039ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS-PARAÑAQUE-SUCAT RD - K0016 + 234- K0016 + 349PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱6.6M | 0% | High risk85 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23DF0033ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONSTRUCTION OF REVETMENT ALONG MANILA BAY, BARANGAY WAWA 2, PHASE II, ROS | Region IV-A | Cavite 1st DEO | On-Going | ₱96.5M | 90% | High risk64 | —-0.022 |
| 27 | 23DF0032ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONSTRUCTION OF REVETMENT ALONG MANILA BAY, BARANGAY WAWA 1, PHASE II, ROS | Region IV-A | Cavite 1st DEO | On-Going | ₱96.5M | 91% | High risk64 | —-0.022 |
| 28 | 23DB0091ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST/ MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LEMERY-TAAL DIVERSION ROAD,LEMERY,BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.072 |
| 29 | 20DQ0128LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF REVETMENT ALONG CARMONA RIVER, PHASE II, BRGY. LAN | Region IV-A | Cavite 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 30 | 20DQ0073LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT ALONG BACOOR RIVER, PHASE IV, BACOOR | Region IV-A | Cavite 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 31 | 24OC0098ASPHALT OVERLAY ALONG C5 EXTENSION EB, DISTRICT 1PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱92.6M | 100% | High risk62 | —-0.025 |
| 32 | 23DB0089ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - TAGAYTAY-NASUGBU RD - K0072 + 240 - K0073 + 400 | Region IV-A | Batangas 1st DEO | Completed | ₱95M | 100% | High risk61 | —-0.096 |
| 33 | 23O00078REHABILITATION OF MAJOR ROADS LEADING TO INTERNATIONAL BASKETBALL FEDERATION (FIBA) SITES, (1. PHILIPPINE ARENA, 2. SMART ARANETA COLISEUM, 3. RIZAL MEMORIAL SPORTS COMPLEX, 4. NINOY AQUINO STADIUM & 5. PHILSPORT COMPLEX) | National Capital Region | National Capital Region | Completed | ₱96.5M | 100% | High risk61 | —-0.084 |
| 34 | 24DO0096ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - ASPHALT OVERLAY OF TANAY-SAMPALOC RD - K0066+100 - K0068+000, K0069+000 - K0070+443, TANAY, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱98M | 100% | High risk60 | —-0.094 |
| 35 | 24DO0013ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-TANAY SAMPALOC RD K0057+(-685) - K0060+000 | Region IV-A | Rizal 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.096 |
| 36 | 23DB0086ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - PALICO-BALAYAN-BATANGAS RD - K0111 + 628 - K0113 + 180 | Region IV-A | Batangas 1st DEO | Completed | ₱89.6M | 100% | Medium risk56 | —-0.098 |
| 37 | 22FK0018CONSTRUCTION_MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF GIMALOTO RIVER CONTROL, SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱77.2M | 100% | Medium risk55 | —-0.077 |
| 38 | 20FL0005ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - IROSIN - SAN ROQUE - BULUSAN LAKE ROA | Region V | Sorsogon 2nd DEO | Completed | ₱30.3M | 100% | Medium risk55 | —-0.097 |
| 39 | 22OC0003ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-SOUTH SUPER H-WAY-K0005+(-108)-K0005+519, K0007+766-K0007+1014,MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱66.9M | 100% | Medium risk55 | —-0.093 |
| 40 | 22OB0101CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER, FACING DOWNSTREAM (EAST BANK), PACKAGE 3, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱91.6M | 100% | Medium risk54 | —-0.078 |
| 41 | 21DQ0037LOCAL PROGRAM-CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - NATIONAL ROADS AND BRIDGES-NATIONAL ROADS- ASPHALT OVERLAY ALONG BACOOR BOULEVARD (S04271LZ), PHASE II, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱82M | 100% | Medium risk54 | —-0.100 |
| 42 | 23DO0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - CORAZON C. AQUINO AVE. K0037+875 - K040+102 | Region IV-A | Rizal 2nd DEO | Completed | ₱67.6M | 100% | Medium risk54 | —-0.101 |
| 43 | 17OC0097REPAIR/REHAB./IMPROVEMENT (ASPHALT OVERLAY) OF PASONG TAMO FROM GIL PUYAT AVENUE TO A. ARNAIZ AVENUE, MAKATI CITY, METRO MANILA (KM. 6+831-KM. 7+772) | National Capital Region | Metro Manila 2nd DEO | Completed | ₱16.5M | 100% | Medium risk54 | —-0.011 |
| 44 | 23DB0085ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - PALICO-BALAYAN-BATANGAS RD - K0108 + 566 - K0110 + 000 | Region IV-A | Batangas 1st DEO | Completed | ₱81.6M | 100% | Medium risk54 | —-0.099 |
| 45 | 18FL0024CONSTRUCTION OF RIVER CONTROL FROM BRGY. FABRICA TO BRGY. SAN RAFAEL, BULAN, SORSOGON | Region V | Sorsogon 2nd DEO | Completed | ₱37.6M | 100% | Medium risk54 | —-0.086 |
| 46 | 23DB0088ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL RD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINT-SECONDARY RDS-PALICO-BALAYAN-BATANGAS RD-K0119+160-K0119+460,K0119+504-K0120+ 120,K0121+234-K0121+479,K0121+566-K0121+686,K0121+782-K0122+000 | Region IV-A | Batangas 1st DEO | Completed | ₱79.6M | 100% | Medium risk54 | —-0.100 |
| 47 | 23DB0084ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - PALICO-BALAYAN-BATANGAS RD - K0101 + 000 - K0102 + 000, K0103 + 000 - K0103 + 226 | Region IV-A | Batangas 1st DEO | Completed | ₱71.9M | 100% | Medium risk53 | —-0.096 |
| 48 | 20FL0003ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - ARIMAN - JCT. BULUSAN LAKE RD - K0604 | Region V | Sorsogon 2nd DEO | Completed | ₱23.8M | 100% | Medium risk53 | —-0.098 |
| 49 | 23DB0087ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - PALICO-BALAYAN-BATANGAS RD - K0114 + 085 - K0114 + 468, K0114 + 820 - K0114 + 886, K0115 + 000 - K0115 + 645 | Region IV-A | Batangas 1st DEO | Completed | ₱63.4M | 100% | Medium risk53 | —-0.102 |
| 50 | 23DQ0106CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF SLOPE AND FLOOD PROTECTION STRUCTURE ALONG CARMONA RIVER, PHASE 2, CARMONA, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱89.1M | 100% | Medium risk53 | —-0.077 |