Contractor dossier
370 projects on file, including joint ventures this contractor is part of.
Total projects
370
Total budget
₱10.8B
Average progress
93.3%
Completion rate
85.4%
Average risk score
46.7
Medium risk on average, out of 100
Flagged as unusual
2
0.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 277 | ₱6B | 44.5 | 1 | 92.7% |
| Region IV-A | 78 | ₱4.1B | 53.6 | 1 | 95.0% |
| Region III | 6 | ₱110.6M | 43.2 | 0 | 91.7% |
| Region V | 4 | ₱168.8M | 54.3 | 0 | 100.0% |
| Central Office | 3 | ₱352.1M | 74.9 | 0 | 100.0% |
| Region IV-B | 2 | ₱88.2M | 41.1 | 0 | 95.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 252 | ₱5.4B | 44.1 | 0 | 92.7% |
| Flood Control and Drainage | 92 | ₱4.7B | 50.8 | 1 | 97.1% |
| Buildings and Facilities | 17 | ₱298M | 47.1 | 0 | 84.8% |
| GAA 2025 OO-1 | 6 | ₱138.4M | 82.7 | 1 | 81.2% |
| OTHER | 2 | ₱94.2M | 70.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱95.3M | 71.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DO0016ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MANILA EAST RD - K0044 + 910 - K0045 + 000, K0054 + 132 - K0054 + 619, K0054 + 859 - K0056 + 000 | Region IV-A | Rizal 2nd DEO | On-Going | ₱48.2M | 97% | High risk91 | —-0.016 |
| 25OC0058ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS-NINOY AQUINO AVE - K0011 + 938 - K0010 + 526PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱40.8M | 95% | High risk86 | —-0.018 |
| 25OC0040ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -PRIMARY ROADS - PARAÑAQUE-SUCAT RD - K0017 + 663 -K0016 + 000PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱21.6M | 95% | High risk86 | —-0.017 |
| 25OC0039ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS-PARAÑAQUE-SUCAT RD - K0016 + 234- K0016 + 349PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱6.6M | 0% | High risk85 | Flagged0.009 |
| 25OC0038ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS-PARANAQUE-SUCAT RD - K0015 + 372 - K0015 + 728PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱20.2M | 100% | High risk78 | —-0.043 |
| 18C00052DREDGING OF GUAGUA-PASAC RIVER, SASMUAN, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱187.5M | 100% | High risk77 | —-0.034 |
| 21O00095CONSTRUCTION OF RIVERWALLS (INTERMITTENT SECTIONS) ALONG MALABON-TULLAHAN RIVER (UPSTREAM SIDE), BRGY. POTRERO, MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱92.4M | 100% | High risk75 | —-0.069 |
| 20C00050REHABILITATION OF PAMPANGA RIVER (INLCUDING PULO) AT ARAYAT AND MACABEBE, PAMPANGA, PROVINCE OF PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱72.1M | 100% | High risk73 | —-0.022 |
| 24DF0154ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSREHABILITATION OF ROAD ALONG KAWIT-NOVELETA DIVERSION RD K0022+151-K0022 + 528, K0023+000-K0023+750 | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 0% | High risk73 | —-0.001 |
| 25DF0036ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADSKAWIT-NOVELETA DIV RD. - K0024 + 495 - K0025 + 438 | Region IV-A | Cavite 1st DEO | On-Going | ₱103.9M | 100% | High risk72 | —-0.044 |
| 25OH0025ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE/BANK IMPV'T. OF MARICABAN CREEK, STA. 0+936 TO STA.1+170 | National Capital Region | South Manila DEO | Completed | ₱95.3M | 100% | High risk72 | —-0.043 |
| 24DO0069ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES | Region IV-A | Rizal 2nd DEO | Completed | ₱49M | 100% | High risk71 | —-0.041 |
| 24DJ0185OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, QUEZON-BATANGAS RD - K0106 + 284 - K0107 + 489 | Region IV-A | Quezon 2nd DEO | On-Going | ₱96.5M | 92% | High risk71 | —-0.034 |
| 24DO0053ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MARIKINA-INFANTA RD - K0040+205 - K0041+744 | Region IV-A | Rizal 2nd DEO | Completed | ₱45.2M | 100% | High risk70 | —-0.040 |
| 25OC0008ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EDSA/GUADALUPE CLOVERLEAF RD-(S04000LZ) CHAINAGE 000-CHAINAGE 028, CHAINAGE 196-CHAINAGE 203,MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱1.1M | 100% | High risk70 | —-0.021 |
| 25CP0027FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVERBANK PROTECTION ALONG MAASIM RIVER, BARANGAY SAPANG PUTIK, PHASE II, SAPANG PUTIK, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱28.5M | 50% | High risk69 | —-0.018 |
| 17CH0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/IMPROVEMEN | Region III | Pampanga 2nd DEO | Completed | ₱40.1M | 100% | High risk68 | —-0.061 |
| 25OC0123CONSTRUCTION OF REVETMENT ALONG PARAÑAQUE RIVER, DISTRICT 1,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱94.6M | 18% | High risk67 | —-0.025 |
| 17DQ0041MFO 2 - FOOD MANAGEMENT SERVICES, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATON STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG METIZO RIVER, BARANGAY HABAY 2, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱9.3M | 100% | High risk67 | —-0.059 |
| 24DF0272ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE & RELIABLE NATIONAL RD SYSTEMASSET PRESERVATION PROGREHAB/ RECONST/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADSKAWIT-NOVELETA-DIVERSION RD - K0022 + (-224) - K0022 + 143, K0022 + 151-K0022+450 | Region IV-A | Cavite 1st DEO | On-Going | ₱14.2M | 0% | High risk67 | —-0.009 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23DF0201CONSTRUCTION OF REVETMENT ALONG TAGUILID RIVER, BRGY. KAINGEN, KAWIT, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱28.7M | 100% | Medium risk52 | Flagged0.014 |
| 25OC0039ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS-PARAÑAQUE-SUCAT RD - K0016 + 234- K0016 + 349PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱6.6M | 0% | High risk85 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 20OC0094ASPHALT OVERLAY ALONG NINOY AQUINO AVENUEPARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.096 |
| 77 | 22OC0017ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-KALAYAAN AVE. EXT.-K0027+000-K0027+953, K0027+968-K0028+228,MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.096 |
| 78 | 24OC0127CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), PCC, BRGY. SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱24M | 0% | Medium risk51 | —-0.024 |
| 79 | 25DI0003CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG TIWAY-TIWAY RIVER, PHASE 1, CABUYAO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱47.8M | 96% | Medium risk50 | —-0.052 |
| 80 | 22DI0021CONSTRUCTION/ IMPROVEMENT OF REVETMENT ALONG TIWAY-TIWAY RIVER, CABUYAO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱47.2M | 100% | Medium risk50 | —-0.087 |
| 81 | 24OC0126CONSTRUCTION OF MULTI-PURPOSE BUILDING (PCC VOCATIONAL SCHOOL), PHASE 2, BARANGAY SAN DIONISIO, PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱17.3M | 0% | Medium risk50 | —-0.025 |
| 82 | 17OC0017ASSET PRESERVATION OF NATIONAL ROADS, PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), QUIRINO AVENUE,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱17.9M | 100% | Medium risk50 | —-0.068 |
| 83 | 17OI0140CONST. OF FLOOD CONTROL STRUCTURES ALONG LAGUNA DE BAY, BRGY. TUNASAN, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱36.5M | 100% | Medium risk50 | —-0.057 |
| 84 | 20OE0091CONSTRUCTION OF RETENTION BASIN AT ESTERO DE SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱48M | 100% | Medium risk49 | —-0.085 |
| 85 | 17OC0096REPAIR/REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) OF (C-5) SAMPAGUITA WEST SERVICE ROAD (ON RAMP & OFF RAMP), MAKATI CITY, METRO MANILA (KM. 18+097-KM. 18+835) | National Capital Region | Metro Manila 2nd DEO | Completed | ₱8.7M | 100% | Medium risk49 | —-0.013 |
| 86 | 24OC0061CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), GREENHEIGHTS VILLAGE, BARANGAY SAN ISIDRO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱19.2M | 77% | Medium risk49 | —-0.049 |
| 87 | 22DN0134IMPROVEMENT OF WATERWAY ALONG BALANTI CREEK CAINTA, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 88 | 22OG0151CONSTRUCTION OF A 4-STOREY MULTIPURPOSE BUILDING, TEACHERS VILLAGE EAST, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱23.7M | 100% | Medium risk49 | —-0.100 |
| 89 | 24OC0053CONSTRUCTION OF REVETMENT ALONG STO. NIÑO CREEK, BARANGAY STO. NIÑO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱48.9M | 95% | Medium risk49 | —-0.044 |
| 90 | 23DQ0013CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT (REINFORCED CONCRETE) ALONG IMUS RIVER, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱47.5M | 100% | Medium risk49 | —-0.086 |
| 91 | 22DN0135IMPROVEMENT OF WATERWAY ALONG DOLORES CREEK TO MAPANDAN RIVER TAYTAY AND CAINTA, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 92 | 22OI0071CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MAGDAONG RIVER, BARANGAY POBLACION, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.078 |
| 93 | 22OI0075CONSTRUCTION (COMPLETION) OF FLOOD MITIGATION STRUCTURE,BAYANAN RIVER, BARANGAY PUTATAN, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.085 |
| 94 | 19OA0003CONSTRUCTION OF RIVERWALLALONG MALABON-TULLAHAN RIVER, BRGY. MAYSILO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱48.6M | 100% | Medium risk49 | —-0.083 |
| 95 | 21OG0112CONSTRUCTION OF MULTI-PURPOSE BUILDING WITH SITE DEVELOPMENT, PURA V. KALAW ELEMENTARY SCHOOL, BARANGAY MILAGROSA, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱23.6M | 100% | Medium risk49 | —-0.101 |
| 96 | 23OC0128ASPHALT OVERLAY ALONG J.P. RIZAL STREET, BARANGAY CEMBO, DISTRICT II,MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱25.7M | 100% | Medium risk49 | —-0.041 |
| 97 | 22OG0048CONSTRUCTION OF MULTI-PURPOSE BUILDING WITH SITE DEVELOPMENT (PHASE I) AT BARANGAY LOYOLA HEIGHTS, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱18.2M | 100% | Medium risk48 | —-0.102 |
| 98 | 18OI0085CONSTRUCTION OF MUNTINLUPA NATIONAL HIGH SCHOOL ANNEX, NHA COMPOUND, POBLACION, MUTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱9.3M | 100% | Medium risk48 | —-0.100 |
| 99 | 21OG0094CONSTRUCTION OF MULTI-PURPOSE BUILDING WITH SITE DEVELOPMENT, J. P. LAUREL HIGH SCHOOL, BARANGAY MILAGROSA, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱19M | 100% | Medium risk48 | —-0.096 |
| 100 | 20OG0109CONSTRUCTION OF MULTI-PURPOSE BUILDING AT KALANTIAW ELEMENTARY SCHOOL, BRGY. BAGUMBAYAN, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱19.2M | 100% | Medium risk48 | —-0.102 |