Opening the dossier…
Opening the dossier…
Contractor dossier
208 projects on file, including joint ventures this contractor is part of.
Total projects
208
Total budget
₱9.7B
Average progress
97.3%
Completion rate
82.7%
Average risk score
44.4
Medium risk on average, out of 100
Flagged as unusual
13
6.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 208 | ₱9.7B | 44.4 | 13 | 97.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 79 | ₱5B | 51.5 | 3 | 96.9% |
| Buildings and Facilities | 64 | ₱301.5M | 21.9 | 0 | 100.0% |
| Flood Control and Drainage | 44 | ₱3B | 53.0 | 1 | 99.1% |
| OTHER | 12 | ₱662.2M | 66.5 | 4 | 95.6% |
| GAA 2025 OO-2 | 3 | ₱433.9M | 93.4 | 3 | 71.8% |
| GAA 2025 SSP | 2 | ₱194.1M | 95.3 | 2 | 37.2% |
| Bridges | 2 | ₱10.4M | 46.8 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱8.4M | 34.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LI0068CONSTRUCTION OF ROAD, PANANSALAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.7M | 9% | High risk96 | Flagged0.060 |
| 25LI0088CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, OSMEÑA TO POBLACION, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.4M | 66% | High risk95 | Flagged0.027 |
| 25LI0075CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 2, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 66% | High risk93 | Flagged0.017 |
| 25LI0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 67% | High risk93 | Flagged0.017 |
| 25LI0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANAT RIVER R/S, MANAT BRIDGE DOWNSTREAM, LEADING TO AGUSAN RIVER, PHASE 1, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 82% | High risk93 | Flagged0.008 |
| 23L00028CONSTRUCTION OF FLOOD CONTROL SYSTEM AT RIVER SIDE BARANGAY TAMIA, PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱95.5M | 47% | High risk80 | Flagged0.046 |
| 22L00037CONSTRUCTION OF CONCRETE ROAD - COGONON ROAD CONNECTING NEW BATAAN PUBLIC TRANSPORT TERMINAL AND BANANA PRODUCTION PACKING PLANT IN SUPPORT OF BANANA INDUSTRY, BRGY. COGONON, NEW BATAAN, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱97.6M | 100% | High risk80 | Flagged0.038 |
| 19LA0157CUT-OFF CHANNEL AND CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER, BRGY. NGAN TO BRGY. TAMIA SECTION, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱69.7M | 100% | High risk77 | —-0.012 |
| 20LC0133CONSTRUCTION OF ROAD, BRGY. CANOCOTAN, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱49.5M | 100% | High risk77 | —-0.021 |
| 25LI0002SAN JOSE LEADING TO AWAO FALLS, BRGY. SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱4.9M | 100% | High risk74 | Flagged0.002 |
| 25LI0008TUBO-TUBO-MAMUNGA ROAD IN SUPPORT OF RICE, BANANA, AND OIL PALM PRODUCTION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱9.8M | 100% | High risk73 | Flagged0.005 |
| 18LA0102CONCRETING OF BONGKILATON ROAD LEADING TO MANDAYA VILLAGE, PANSAN FALLS, BONGKILATON CAVE AND TAGBUBUNLAS FALLS, BRGY. NGAN, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱19.6M | 100% | High risk73 | —-0.017 |
| 18L00097NABUNTURAN-MARAGUSAN ROAD INCLUDING ROW-K1450+567-K1450+810;K1453+061-K1453+312;K1456+315-K1457+581, | Region XI | Region XI | Completed | ₱153.5M | 100% | High risk65 | —-0.037 |
| 24LI0042CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER PHASE 2, PUROK 8, POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.7M | 100% | High risk64 | —-0.012 |
| 24LI0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGUSAN RIVER, PRK. 6 SECTION, BARANGAY POBLACION, MONKAYO, DAVAO DE ORO PHASE I | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.046 |
| 24LI0043CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER PHASE 1, PUROK 8, POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.046 |
| 18L00031WIDENING (2 INTO 4 LANES) OF MONTEVISTA-COMPOSTELA-MATI BDRY. RD. INCL. ROW(BRGY. OSMEÑA-BRGY. BANTC | Region XI | Region XI | Completed | ₱156M | 100% | High risk64 | —-0.053 |
| 23L00191CONSTRUCTION OF SITIO QUARRY, BARANGAY NGAN, COMPOSTELA - UPPER ULIP, MONKAYO ROAD, PACKAGE D, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱192M | 96% | High risk64 | —-0.004 |
| 20L00001CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ON SPECIFIC LOCATION ALONG DAANG MAHARLIKA (MN)(S00126MN), K1381+950 - K1396+704, COMPOSTELA VALLEY | Region XI | Region XI | On-Going | ₱167.8M | 96% | High risk64 | Flagged0.010 |
| 23LI0080CONSTRUCTION OF SITIO QUARRY, BARANGAY NGAN, COMPOSTELA - UPPER ULIP ROAD, PAPCKAGE E, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LI0068CONSTRUCTION OF ROAD, PANANSALAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.7M | 9% | High risk96 | Flagged0.060 |
| 23L00028CONSTRUCTION OF FLOOD CONTROL SYSTEM AT RIVER SIDE BARANGAY TAMIA, PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱95.5M | 47% | High risk80 | Flagged0.046 |
| 22L00037CONSTRUCTION OF CONCRETE ROAD - COGONON ROAD CONNECTING NEW BATAAN PUBLIC TRANSPORT TERMINAL AND BANANA PRODUCTION PACKING PLANT IN SUPPORT OF BANANA INDUSTRY, BRGY. COGONON, NEW BATAAN, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱97.6M | 100% | High risk80 | Flagged0.038 |
| 25LI0088CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, OSMEÑA TO POBLACION, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.4M | 66% | High risk95 | Flagged0.027 |
| 24LG0114CONSTRUCTION OF RESILIENT FLOOD CONTROL STRUCTURE (BOLSTERING COMMUNITY RESILIENCE), BARANGAY DON ENRIQUE LOPEZ, CITY OF MATI, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱48.2M | 100% | Medium risk55 | Flagged0.026 |
| 25LI0048CONCRETING OF SITIO SUGOD, BRGY. UNION TO SITIO LOWER ULIP, BRGY. POBLACION FMR, BRGY. UNION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱29.8M | 72% | Medium risk47 | Flagged0.019 |
| 25LI0075CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 2, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 66% | High risk93 | Flagged0.017 |
| 25LI0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 67% | High risk93 | Flagged0.017 |
| 20L00001CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ON SPECIFIC LOCATION ALONG DAANG MAHARLIKA (MN)(S00126MN), K1381+950 - K1396+704, COMPOSTELA VALLEY | Region XI | Region XI | On-Going | ₱167.8M | 96% | High risk64 | Flagged0.010 |
| 25LI0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANAT RIVER R/S, MANAT BRIDGE DOWNSTREAM, LEADING TO AGUSAN RIVER, PHASE 1, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 82% | High risk93 | Flagged0.008 |
| 25LI0008TUBO-TUBO-MAMUNGA ROAD IN SUPPORT OF RICE, BANANA, AND OIL PALM PRODUCTION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱9.8M | 100% | High risk73 | Flagged0.005 |
| 17LA0144CONCRETING OF PUROK 2 TO PUROK 4, BRGY. OGAO FMR, NABUNTURANCOMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱11.9M | 100% | Medium risk38 | Flagged0.002 |
| 25LI0002SAN JOSE LEADING TO AWAO FALLS, BRGY. SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱4.9M | 100% | High risk74 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 19LA0008CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-ON SPECIFIC LOCATIONS ALONG MONTEVISTA-DNAS RD. (S00130MN), COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱55M | 100% | Medium risk51 | —-0.081 |
| 77 | 19LA0037ROAD WIDENING-ALONG MONTEVISTA-COMPOSTELA-MATI BDRY. ROD (S00133MN)COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱52.1M | 100% | Medium risk51 | —-0.077 |
| 78 | 24LI0099CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAOAO CREEK LEADING TO AGUSAN RIVER AT PUROK 4A TO PUROK 2, PHASE 1, POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱72.2M | 68% | Medium risk51 | —-0.008 |
| 79 | 17LA0024CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG AGUSAN RIVER, BRGY. PANAG, NEW BATAAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱45.9M | 100% | Medium risk51 | —-0.039 |
| 80 | 17L00111ROAD UPGRADING (GRAVEL TO CONCRETE) OF MONTEVISTA-DNAS RD (BRGY. CANIDKID-BRGY. CAMANSI SECT.),COMPO | Region XI | Region XI | Completed | ₱140.2M | 100% | Medium risk50 | —-0.022 |
| 81 | 17LA0193CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG HIJO RIVER, BRGY. BUCANA, MACO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱9.6M | 100% | Medium risk50 | —-0.046 |
| 82 | 17L00009WIDENING (2-4 INTO 6 LANES) OF DAANG MAHARLIKA (MN) INCL. RROW,(BRGY. SAN JOSE-BRGY. BANLAG SECT.),C | Region XI | Region XI | Completed | ₱176.7M | 100% | Medium risk50 | —-0.022 |
| 83 | 17L00112ROAD UPGRADING (GRAVEL TO CONCRETE) OF MONTEVISTA-DNAS RD (BRGY. CAMANSI-BRGY. PROSPERIDAD SECT.),CO | Region XI | Region XI | Completed | ₱151.9M | 100% | Medium risk50 | —-0.025 |
| 84 | 17LA0194CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG HIJO RIVER, BRGY. BUCANA, MACO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱17.4M | 100% | Medium risk50 | —-0.047 |
| 85 | 17L00010WIDENING (4-6 LANES) OF DAANG MAHARLIKA (MN) INCLUDING (RROW) (BRGY. BANLAG-BRGY. OLAYCON SECT.),COM | Region XI | Region XI | Completed | ₱119.1M | 100% | Medium risk50 | —-0.037 |
| 86 | 21LA0230CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AT SPECIIFIC LOCATIONS ALONG BENIGNO S. AQUINO JR. NATIONAL HIGHWAY (S01432MN) DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱51.1M | 100% | Medium risk50 | —-0.077 |
| 87 | 24LI0122CONSTRUCTION OF ROAD, BARANGAY POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱48.2M | 86% | Medium risk50 | —-0.041 |
| 88 | 22LC0090CONSTRUCTION OF ROAD, NRJ KAPALONG - TALAINGOD - VALENCIA, BUKIDNON ROAD TO SITIO MEGATONG, TALAINGOD, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.084 |
| 89 | 18LA0228CONSTRUCTION OF CONCRETE ROAD-MONTEVISTA-DNAS ROAD (DNAS-LAAK) PACKAGE 6 PROSPERIDAD SECTION, MONTEVISTACOMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.083 |
| 90 | 19LA0161CONSTRUCTION OF REVETMENT ALONG BATUTU RIVER LEADING TO AGUSAN RIVER, BRGY. PANAG, NEW BATAAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱64.7M | 100% | Medium risk50 | —-0.063 |
| 91 | 23LI0028CONSTRUCTION OF REVETMENT ALONG MANAT RIVER (UPSTREAM AND DOWNSTREAM) LEADING TO AGUSAN RIVER AT BANKERUHAN SUR TO BANKERUHAN NORTE, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱57.9M | 100% | Medium risk49 | —-0.067 |
| 92 | 25LI0048CONCRETING OF SITIO SUGOD, BRGY. UNION TO SITIO LOWER ULIP, BRGY. POBLACION FMR, BRGY. UNION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱29.8M | 72% | Medium risk47 | Flagged0.019 |
| 93 | 22LA0096CONSTRUCTION OF WATER SUPPLY SYSTEM-LEVEL II, BARANGAY SIOCON, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.047 |
| 94 | 22LC0027MANIKI BRIDGE (B00182MN) ALONG TAGUM-PANABO CIRCUM. ROAD | Region XI | Davao del Norte DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.058 |
| 95 | 18LA0045CONCRETING OF SAN ROQUE-SAN ISIDRO ROAD CONNECTING TO NABUNTURAN PUBLIC TRANSPORT TERMINAL AND PRK. 5, SAN ISIDRO FOOD TERMINAL, NABUNTURAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱41.7M | 100% | Medium risk47 | —-0.084 |
| 96 | 22LC0131CONSTRUCTION (COMPLETION) OF DPWH DAVAO DEL NORTE DEO BUILDING, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.085 |
| 97 | 20LA0354ROAD WIDENING - ALONG BENIGNO S. AQUINO JR. NATIONAL HIGHWAY, COMPOSTELA VALLEY | Region XI | Davao de Oro 1st DEO | Completed | ₱40.3M | 100% | Medium risk47 | —-0.081 |
| 98 | 24LI0030OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF TRAFFIC ISLAND - MONTEVISTA - COMPOSTELA - MATI BDRY ROAD - K 1486+(-307) K 1488+044 | Region XI | Davao de Oro 2nd DEO | Completed | ₱32.9M | 100% | Medium risk47 | —-0.081 |
| 99 | 24L00087ROAD WIDENING - DAANG MAHARLIKA (MN) - K1482+527-K1482+727, (S01364MN) K1481+246-K1481+446, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱31.4M | 94% | Medium risk47 | —-0.050 |
| 100 | 23LI0017ROAD WIDENING - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY - K1607+000 - K1607+660 | Region XI | Davao de Oro 2nd DEO | Completed | ₱46M | 100% | Medium risk47 | —-0.078 |