Contractor dossier
208 projects on file, including joint ventures this contractor is part of.
Total projects
208
Total budget
₱9.7B
Average progress
97.3%
Completion rate
82.7%
Average risk score
44.4
Medium risk on average, out of 100
Flagged as unusual
13
6.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 208 | ₱9.7B | 44.4 | 13 | 97.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 79 | ₱5B | 51.5 | 3 | 96.9% |
| Buildings and Facilities | 64 | ₱301.5M | 21.9 | 0 | 100.0% |
| Flood Control and Drainage | 44 | ₱3B | 53.0 | 1 | 99.1% |
| OTHER | 12 | ₱662.2M | 66.5 | 4 | 95.6% |
| GAA 2025 OO-2 | 3 | ₱433.9M | 93.4 | 3 | 71.8% |
| GAA 2025 SSP | 2 | ₱194.1M | 95.3 | 2 | 37.2% |
| Bridges | 2 | ₱10.4M | 46.8 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱8.4M | 34.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LI0068CONSTRUCTION OF ROAD, PANANSALAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.7M | 9% | High risk96 | Flagged0.060 |
| 25LI0088CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, OSMEÑA TO POBLACION, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.4M | 66% | High risk95 | Flagged0.027 |
| 25LI0075CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 2, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 66% | High risk93 | Flagged0.017 |
| 25LI0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 67% | High risk93 | Flagged0.017 |
| 25LI0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANAT RIVER R/S, MANAT BRIDGE DOWNSTREAM, LEADING TO AGUSAN RIVER, PHASE 1, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 82% | High risk93 | Flagged0.008 |
| 23L00028CONSTRUCTION OF FLOOD CONTROL SYSTEM AT RIVER SIDE BARANGAY TAMIA, PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱95.5M | 47% | High risk80 | Flagged0.046 |
| 22L00037CONSTRUCTION OF CONCRETE ROAD - COGONON ROAD CONNECTING NEW BATAAN PUBLIC TRANSPORT TERMINAL AND BANANA PRODUCTION PACKING PLANT IN SUPPORT OF BANANA INDUSTRY, BRGY. COGONON, NEW BATAAN, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱97.6M | 100% | High risk80 | Flagged0.038 |
| 19LA0157CUT-OFF CHANNEL AND CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER, BRGY. NGAN TO BRGY. TAMIA SECTION, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱69.7M | 100% | High risk77 | —-0.012 |
| 20LC0133CONSTRUCTION OF ROAD, BRGY. CANOCOTAN, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱49.5M | 100% | High risk77 | —-0.021 |
| 25LI0002SAN JOSE LEADING TO AWAO FALLS, BRGY. SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱4.9M | 100% | High risk74 | Flagged0.002 |
| 25LI0008TUBO-TUBO-MAMUNGA ROAD IN SUPPORT OF RICE, BANANA, AND OIL PALM PRODUCTION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱9.8M | 100% | High risk73 | Flagged0.005 |
| 18LA0102CONCRETING OF BONGKILATON ROAD LEADING TO MANDAYA VILLAGE, PANSAN FALLS, BONGKILATON CAVE AND TAGBUBUNLAS FALLS, BRGY. NGAN, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱19.6M | 100% | High risk73 | —-0.017 |
| 18L00097NABUNTURAN-MARAGUSAN ROAD INCLUDING ROW-K1450+567-K1450+810;K1453+061-K1453+312;K1456+315-K1457+581, | Region XI | Region XI | Completed | ₱153.5M | 100% | High risk65 | —-0.037 |
| 24LI0042CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER PHASE 2, PUROK 8, POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.7M | 100% | High risk64 | —-0.012 |
| 24LI0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGUSAN RIVER, PRK. 6 SECTION, BARANGAY POBLACION, MONKAYO, DAVAO DE ORO PHASE I | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.046 |
| 24LI0043CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER PHASE 1, PUROK 8, POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.046 |
| 18L00031WIDENING (2 INTO 4 LANES) OF MONTEVISTA-COMPOSTELA-MATI BDRY. RD. INCL. ROW(BRGY. OSMEÑA-BRGY. BANTC | Region XI | Region XI | Completed | ₱156M | 100% | High risk64 | —-0.053 |
| 23L00191CONSTRUCTION OF SITIO QUARRY, BARANGAY NGAN, COMPOSTELA - UPPER ULIP, MONKAYO ROAD, PACKAGE D, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱192M | 96% | High risk64 | —-0.004 |
| 20L00001CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ON SPECIFIC LOCATION ALONG DAANG MAHARLIKA (MN)(S00126MN), K1381+950 - K1396+704, COMPOSTELA VALLEY | Region XI | Region XI | On-Going | ₱167.8M | 96% | High risk64 | Flagged0.010 |
| 23LI0080CONSTRUCTION OF SITIO QUARRY, BARANGAY NGAN, COMPOSTELA - UPPER ULIP ROAD, PAPCKAGE E, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LI0068CONSTRUCTION OF ROAD, PANANSALAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.7M | 9% | High risk96 | Flagged0.060 |
| 23L00028CONSTRUCTION OF FLOOD CONTROL SYSTEM AT RIVER SIDE BARANGAY TAMIA, PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱95.5M | 47% | High risk80 | Flagged0.046 |
| 22L00037CONSTRUCTION OF CONCRETE ROAD - COGONON ROAD CONNECTING NEW BATAAN PUBLIC TRANSPORT TERMINAL AND BANANA PRODUCTION PACKING PLANT IN SUPPORT OF BANANA INDUSTRY, BRGY. COGONON, NEW BATAAN, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱97.6M | 100% | High risk80 | Flagged0.038 |
| 25LI0088CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, OSMEÑA TO POBLACION, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.4M | 66% | High risk95 | Flagged0.027 |
| 24LG0114CONSTRUCTION OF RESILIENT FLOOD CONTROL STRUCTURE (BOLSTERING COMMUNITY RESILIENCE), BARANGAY DON ENRIQUE LOPEZ, CITY OF MATI, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱48.2M | 100% | Medium risk55 | Flagged0.026 |
| 25LI0048CONCRETING OF SITIO SUGOD, BRGY. UNION TO SITIO LOWER ULIP, BRGY. POBLACION FMR, BRGY. UNION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱29.8M | 72% | Medium risk47 | Flagged0.019 |
| 25LI0075CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 2, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 66% | High risk93 | Flagged0.017 |
| 25LI0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 67% | High risk93 | Flagged0.017 |
| 20L00001CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ON SPECIFIC LOCATION ALONG DAANG MAHARLIKA (MN)(S00126MN), K1381+950 - K1396+704, COMPOSTELA VALLEY | Region XI | Region XI | On-Going | ₱167.8M | 96% | High risk64 | Flagged0.010 |
| 25LI0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANAT RIVER R/S, MANAT BRIDGE DOWNSTREAM, LEADING TO AGUSAN RIVER, PHASE 1, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 82% | High risk93 | Flagged0.008 |
| 25LI0008TUBO-TUBO-MAMUNGA ROAD IN SUPPORT OF RICE, BANANA, AND OIL PALM PRODUCTION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱9.8M | 100% | High risk73 | Flagged0.005 |
| 17LA0144CONCRETING OF PUROK 2 TO PUROK 4, BRGY. OGAO FMR, NABUNTURANCOMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱11.9M | 100% | Medium risk38 | Flagged0.002 |
| 25LI0002SAN JOSE LEADING TO AWAO FALLS, BRGY. SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱4.9M | 100% | High risk74 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 21LA0103PASIAN ROAD LEADING TO AGROTOURISM COMPLEX, BRGY. PASIAN, MONKAYO, COMPOSTELA VALLEY | Region XI | Davao de Oro 1st DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.082 |
| 127 | 21LA0159REHABILITATION OF ROAD, SAN JOSE - MAHAYAHAY, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.082 |
| 128 | 24LI0012SAN JOSE LEADING TO AWAO FALLS, BRGY. SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱4.9M | 100% | Medium risk45 | —-0.083 |
| 129 | 23LI0005ROAD WIDENING - BENIGNO S. AQUINO, JR. NATIONAL HIGHWAY - K1427+389 - K1427+656 | Region XI | Davao de Oro 2nd DEO | Completed | ₱6.6M | 100% | Medium risk45 | —-0.080 |
| 130 | 23LI0002BONGKILATON ROAD LEADING TO MANDAYA VILLAGE, PANSAN FALLS, BONGKILATON CAVE AND TAGBUBUNLAS FALLS, BRGY. NGAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱12.2M | 100% | Medium risk45 | —-0.080 |
| 131 | 23LI0001TUBO-TUBO ROAD CONNECTING MONKAYO PUBLIC TRANSPORT TERMINAL AND SACARBEMCO RUBBER SHEET PROCESSING, SEMPCO ORGANIC FERTILIZER IN SUPPORT OF RUBBER, PALM OIL AND CARDAVA INDUSTRIES, BRGY. TUBO-TUBO, MONKAYO, COMPOSTELA VALLEY | Region XI | Davao de Oro 2nd DEO | Completed | ₱12.2M | 100% | Medium risk45 | —-0.081 |
| 132 | 23LI0012SAN JOSE ROAD LEADING TO AWAO FALLS, BRGY. SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱12.2M | 100% | Medium risk45 | —-0.083 |
| 133 | 20L00009CONSTRUCTION OF MARAGUSAN MUNICIPAL POLICE STATION, MARAGUSAN, COMPOSTELA VALLEY PROVINCE | Region XI | Region XI | Completed | ₱8.7M | 100% | Medium risk45 | —-0.075 |
| 134 | 25LI0019CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NEW MANAY, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱8.4M | 97% | Medium risk45 | —-0.051 |
| 135 | 25LI0003CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY NEW VISAYAS,MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱7.4M | 100% | Medium risk45 | —-0.057 |
| 136 | 24LI0058CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BANTACAN, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱6.9M | 100% | Medium risk45 | —-0.084 |
| 137 | 20L00010CONSTRUCTION OF NEW BATAAN MUNICIPAL POLICE STATION, NEW BATAAN, COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱8.7M | 100% | Medium risk45 | —-0.082 |
| 138 | 24LI0059CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NGAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱6.9M | 100% | Medium risk44 | —-0.083 |
| 139 | 24LI0017CONSTRUCTION OF UPPER NABOC CIS REVETMENT L/S AT DAM UPSTREAM, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱14.7M | 100% | Medium risk44 | —-0.027 |
| 140 | 19LA0166CONSTRUCTION OF REVETMENT ALONG NABOC RIVER LEADING TO AGUSAN RIVER, BRGY. NABOC, MONKAYO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱24.6M | 100% | Medium risk44 | —-0.067 |
| 141 | 22LA0129CONSTRUCTION OF CONCRETE REVETMENT ALONG BATUTU RIVER LEADING TO MANAT RIVER (JUNCTION) BARANGAY NEW VISAYAS, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱39.2M | 100% | Medium risk44 | —-0.069 |
| 142 | 22LC0194CONSTRUCTION OF DRAINAGE CANAL IN BRGY. TIBAL-OG, STO. TOMAS, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.075 |
| 143 | 19LF0047CONSTRUCTION OF FLOOD MITIGATION STRUCTURE BOSTON COASTAL PROTECTION, BOSTON, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱34.3M | 100% | Medium risk44 | —-0.064 |
| 144 | 21LA0133CONSTRUCTION OF BOX CULVERT FROM PUROK 6 BARANGAY HAGUIMITAN TO PUROK 13 BARANGAY PASIAN, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.067 |
| 145 | 18LA0103CONSTRUCTION OF REVETMENT ALONG PUROKS NATURAL CREEKS, LAAK POBLACION, LAAK, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱33.8M | 100% | Medium risk44 | —-0.071 |
| 146 | 18LF0035CONSTRUCTION OF REVETMENT ON SHEET PILE FOUNDATION, BOSTON RIVER, BOSTON, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱38.8M | 100% | Medium risk44 | —-0.064 |
| 147 | 21LC0142CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (MUNICIPAL CRISIS CENTER) IN NEW CORELLA, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.089 |
| 148 | 23LI0081CONSTRUCTION OF MULTI-PURPOSE BUILDING (COOPERATIVE BUILDING) AT BARANGAY BANTACAN, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.084 |
| 149 | 22LC0126CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TULALIAN, SANTO TOMAS, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.092 |
| 150 | 23LI0048CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) AT PUROK 4, ANDAP, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.084 |