Contractor dossier
208 projects on file, including joint ventures this contractor is part of.
Total projects
208
Total budget
₱9.7B
Average progress
97.3%
Completion rate
82.7%
Average risk score
44.4
Medium risk on average, out of 100
Flagged as unusual
13
6.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 208 | ₱9.7B | 44.4 | 13 | 97.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 79 | ₱5B | 51.5 | 3 | 96.9% |
| Buildings and Facilities | 64 | ₱301.5M | 21.9 | 0 | 100.0% |
| Flood Control and Drainage | 44 | ₱3B | 53.0 | 1 | 99.1% |
| OTHER | 12 | ₱662.2M | 66.5 | 4 | 95.6% |
| GAA 2025 OO-2 | 3 | ₱433.9M | 93.4 | 3 | 71.8% |
| GAA 2025 SSP | 2 | ₱194.1M | 95.3 | 2 | 37.2% |
| Bridges | 2 | ₱10.4M | 46.8 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱8.4M | 34.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LI0068CONSTRUCTION OF ROAD, PANANSALAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.7M | 9% | High risk96 | Flagged0.060 |
| 25LI0088CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, OSMEÑA TO POBLACION, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.4M | 66% | High risk95 | Flagged0.027 |
| 25LI0075CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 2, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 66% | High risk93 | Flagged0.017 |
| 25LI0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 67% | High risk93 | Flagged0.017 |
| 25LI0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANAT RIVER R/S, MANAT BRIDGE DOWNSTREAM, LEADING TO AGUSAN RIVER, PHASE 1, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 82% | High risk93 | Flagged0.008 |
| 23L00028CONSTRUCTION OF FLOOD CONTROL SYSTEM AT RIVER SIDE BARANGAY TAMIA, PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱95.5M | 47% | High risk80 | Flagged0.046 |
| 22L00037CONSTRUCTION OF CONCRETE ROAD - COGONON ROAD CONNECTING NEW BATAAN PUBLIC TRANSPORT TERMINAL AND BANANA PRODUCTION PACKING PLANT IN SUPPORT OF BANANA INDUSTRY, BRGY. COGONON, NEW BATAAN, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱97.6M | 100% | High risk80 | Flagged0.038 |
| 19LA0157CUT-OFF CHANNEL AND CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER, BRGY. NGAN TO BRGY. TAMIA SECTION, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱69.7M | 100% | High risk77 | —-0.012 |
| 20LC0133CONSTRUCTION OF ROAD, BRGY. CANOCOTAN, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱49.5M | 100% | High risk77 | —-0.021 |
| 25LI0002SAN JOSE LEADING TO AWAO FALLS, BRGY. SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱4.9M | 100% | High risk74 | Flagged0.002 |
| 25LI0008TUBO-TUBO-MAMUNGA ROAD IN SUPPORT OF RICE, BANANA, AND OIL PALM PRODUCTION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱9.8M | 100% | High risk73 | Flagged0.005 |
| 18LA0102CONCRETING OF BONGKILATON ROAD LEADING TO MANDAYA VILLAGE, PANSAN FALLS, BONGKILATON CAVE AND TAGBUBUNLAS FALLS, BRGY. NGAN, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱19.6M | 100% | High risk73 | —-0.017 |
| 18L00097NABUNTURAN-MARAGUSAN ROAD INCLUDING ROW-K1450+567-K1450+810;K1453+061-K1453+312;K1456+315-K1457+581, | Region XI | Region XI | Completed | ₱153.5M | 100% | High risk65 | —-0.037 |
| 24LI0042CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER PHASE 2, PUROK 8, POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.7M | 100% | High risk64 | —-0.012 |
| 24LI0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGUSAN RIVER, PRK. 6 SECTION, BARANGAY POBLACION, MONKAYO, DAVAO DE ORO PHASE I | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.046 |
| 24LI0043CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER PHASE 1, PUROK 8, POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.046 |
| 18L00031WIDENING (2 INTO 4 LANES) OF MONTEVISTA-COMPOSTELA-MATI BDRY. RD. INCL. ROW(BRGY. OSMEÑA-BRGY. BANTC | Region XI | Region XI | Completed | ₱156M | 100% | High risk64 | —-0.053 |
| 23L00191CONSTRUCTION OF SITIO QUARRY, BARANGAY NGAN, COMPOSTELA - UPPER ULIP, MONKAYO ROAD, PACKAGE D, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱192M | 96% | High risk64 | —-0.004 |
| 20L00001CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ON SPECIFIC LOCATION ALONG DAANG MAHARLIKA (MN)(S00126MN), K1381+950 - K1396+704, COMPOSTELA VALLEY | Region XI | Region XI | On-Going | ₱167.8M | 96% | High risk64 | Flagged0.010 |
| 23LI0080CONSTRUCTION OF SITIO QUARRY, BARANGAY NGAN, COMPOSTELA - UPPER ULIP ROAD, PAPCKAGE E, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LI0068CONSTRUCTION OF ROAD, PANANSALAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.7M | 9% | High risk96 | Flagged0.060 |
| 23L00028CONSTRUCTION OF FLOOD CONTROL SYSTEM AT RIVER SIDE BARANGAY TAMIA, PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱95.5M | 47% | High risk80 | Flagged0.046 |
| 22L00037CONSTRUCTION OF CONCRETE ROAD - COGONON ROAD CONNECTING NEW BATAAN PUBLIC TRANSPORT TERMINAL AND BANANA PRODUCTION PACKING PLANT IN SUPPORT OF BANANA INDUSTRY, BRGY. COGONON, NEW BATAAN, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱97.6M | 100% | High risk80 | Flagged0.038 |
| 25LI0088CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, OSMEÑA TO POBLACION, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.4M | 66% | High risk95 | Flagged0.027 |
| 24LG0114CONSTRUCTION OF RESILIENT FLOOD CONTROL STRUCTURE (BOLSTERING COMMUNITY RESILIENCE), BARANGAY DON ENRIQUE LOPEZ, CITY OF MATI, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱48.2M | 100% | Medium risk55 | Flagged0.026 |
| 25LI0048CONCRETING OF SITIO SUGOD, BRGY. UNION TO SITIO LOWER ULIP, BRGY. POBLACION FMR, BRGY. UNION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱29.8M | 72% | Medium risk47 | Flagged0.019 |
| 25LI0075CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 2, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 66% | High risk93 | Flagged0.017 |
| 25LI0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 67% | High risk93 | Flagged0.017 |
| 20L00001CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ON SPECIFIC LOCATION ALONG DAANG MAHARLIKA (MN)(S00126MN), K1381+950 - K1396+704, COMPOSTELA VALLEY | Region XI | Region XI | On-Going | ₱167.8M | 96% | High risk64 | Flagged0.010 |
| 25LI0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANAT RIVER R/S, MANAT BRIDGE DOWNSTREAM, LEADING TO AGUSAN RIVER, PHASE 1, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 82% | High risk93 | Flagged0.008 |
| 25LI0008TUBO-TUBO-MAMUNGA ROAD IN SUPPORT OF RICE, BANANA, AND OIL PALM PRODUCTION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱9.8M | 100% | High risk73 | Flagged0.005 |
| 17LA0144CONCRETING OF PUROK 2 TO PUROK 4, BRGY. OGAO FMR, NABUNTURANCOMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱11.9M | 100% | Medium risk38 | Flagged0.002 |
| 25LI0002SAN JOSE LEADING TO AWAO FALLS, BRGY. SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱4.9M | 100% | High risk74 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 23LI0038CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) AT CABINUANGAN, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.085 |
| 152 | 23LI0045CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) AT LAHI, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.084 |
| 153 | 22LA0007CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN BUILDING) AT BARANGAY MACOPA, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.084 |
| 154 | 22LC0158CONSTRUCTION OF MULTI-PURPOSE BUILDING (2-STOREY COMELEC BLDG.), TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.089 |
| 155 | 22LC0124CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SINDATON, PANABO CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱5M | 100% | Medium risk43 | —-0.092 |
| 156 | 22LC0122CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SALVACION, SANTO TOMAS, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱5M | 100% | Medium risk43 | —-0.090 |
| 157 | 23LI0056CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) AT AWAO, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱5.9M | 100% | Medium risk43 | —-0.085 |
| 158 | 20LC0112CONCRETING OF PUROK 5 TO PUROK 8, BRGY. PANTARON FMR, BRGY. PANTARON, STO. TOMAS, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱9.9M | 100% | Medium risk41 | —-0.035 |
| 159 | 19LC0455CONCRETING OF PUROK 5 - PUROK 7, BRGY. NEW CASAY FMR, BRGY. NEW CASAY, BRAULIO E. DUJALI, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱13.4M | 100% | Medium risk41 | —-0.034 |
| 160 | 21LC0241CONSTRUCTION/COMPLETION OF 3STY9CL SCHOOL BUILDING AT SAN AGUSTIN ELEMENTARY SCHOOL, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱9.3M | 100% | Medium risk38 | —-0.038 |
| 161 | 17LA0144CONCRETING OF PUROK 2 TO PUROK 4, BRGY. OGAO FMR, NABUNTURANCOMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱11.9M | 100% | Medium risk38 | Flagged0.002 |
| 162 | 17LA0141CONCRETING OF PUROK 1 TO PUROK 12, BRGY. TUBORAN, MAWABCOMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱10.9M | 100% | Medium risk37 | —-0.001 |
| 163 | 21LA0044CONSTRUCTION OF WATER SYSTEM AT BARANGAY SAN MIGUEL, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱3.5M | 100% | Low risk23 | —-0.047 |
| 164 | 17LA0290CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, FOUR (4) CLASSROOM AT GABI NHS, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱10.7M | 100% | Low risk18 | —-0.012 |
| 165 | 17LA0196PACKAGE - CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM BUILDING AT:CW1. BANAGBANAG ES, MONTEVISTACW2. CORAZON C. AQUINO ES, COMPOSTELACW3. HAGUIMITAN ES, MONKAYOCW4. LAHI ES, MARAGUSAN (SAN MARIANO)CW5. PILAR ES, MONKAYOCW6. | Region XI | Davao de Oro 1st DEO | Completed | ₱18.5M | 100% | Low risk18 | —-0.010 |
| 166 | 17LA0351CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, SIX (6) CLASSROOM BUILDING @ COMPOSTELA CES, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱13.9M | 100% | Low risk18 | —-0.011 |
| 167 | 17LA0345CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, SIX (6) CLASSROOM BUILDING @ MAGSAYSAY ES, NABUNTURAN (CAPITAL), COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱13.9M | 100% | Low risk18 | —-0.013 |
| 168 | 17LA0282CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM BUILDING AT:CW1. AWAO ES, MONKAYOCW2. BABAG ES, MONKAYOCW3. MACOPA ES, MONKAYOCOMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱9.3M | 100% | Low risk18 | —-0.013 |
| 169 | 17LA0256CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM BUILDING AT:CW1. NABOC ES, MONKAYOCW2. SAMUAG ES, MONKAYOCW3. TUBURAN ES, MONKAYOCOMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱9M | 100% | Low risk18 | —-0.012 |
| 170 | 22LA0035CONSTRUCTION OF MULTI PURPOSE BUILDING, BARANGAY NEW CALAPE, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱4.3M | 100% | Low risk16 | —-0.086 |
| 171 | 23LI0101COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) AT COGONON, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱3.9M | 100% | Low risk16 | —-0.085 |
| 172 | 20LA0044CONSTRUCTION OF MULTI-PURPOSE BUILDING (BRGY. HALL) BRGY. MAMUNGA, MONKAYO COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱3M | 100% | Low risk16 | —-0.084 |
| 173 | 21LA0006CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY OLAYCON, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱3M | 100% | Low risk16 | —-0.086 |
| 174 | 23LI0058CONSTRUCTION/IMPROVEMENT (COMPLETION) MULTI-PURPOSE BUILDING (SCHOOL STAGE) AT BANTACAN ES, BANTACAN, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱2.9M | 100% | Low risk16 | —-0.085 |
| 175 | 21LA0005CONSTRUCTION OF MULTI-PURPOSE BUILDING, NEW RELOCATION SITE, BRGY. PASIAN, MONKAYO DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱3M | 100% | Low risk15 | —-0.084 |