208 projects on file, including joint ventures this contractor is part of.
Total projects
208
Total budget
₱9.7B
Average progress
97.3%
Completion rate
82.7%
Average risk score
44.4
Medium risk on average, out of 100
Flagged as unusual
13
6.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 208 | ₱9.7B | 44.4 | 13 | 97.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 79 | ₱5B | 51.5 | 3 | 96.9% |
| Buildings and Facilities | 64 | ₱301.5M | 21.9 | 0 | 100.0% |
| Flood Control and Drainage | 44 | ₱3B | 53.0 | 1 | 99.1% |
| OTHER | 12 | ₱662.2M | 66.5 | 4 | 95.6% |
| GAA 2025 OO-2 | 3 | ₱433.9M | 93.4 | 3 | 71.8% |
| GAA 2025 SSP | 2 | ₱194.1M | 95.3 | 2 | 37.2% |
| Bridges | 2 | ₱10.4M | 46.8 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱8.4M | 34.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LI0068CONSTRUCTION OF ROAD, PANANSALAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.7M | 9% | High risk96 | Flagged0.060 |
| 25LI0088CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, OSMEÑA TO POBLACION, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.4M | 66% | High risk95 | Flagged0.027 |
| 25LI0075CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 2, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 66% | High risk93 | Flagged0.017 |
| 25LI0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 67% | High risk93 | Flagged0.017 |
| 25LI0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANAT RIVER R/S, MANAT BRIDGE DOWNSTREAM, LEADING TO AGUSAN RIVER, PHASE 1, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 82% | High risk93 | Flagged0.008 |
| 23L00028CONSTRUCTION OF FLOOD CONTROL SYSTEM AT RIVER SIDE BARANGAY TAMIA, PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱95.5M | 47% | High risk80 | Flagged0.046 |
| 22L00037CONSTRUCTION OF CONCRETE ROAD - COGONON ROAD CONNECTING NEW BATAAN PUBLIC TRANSPORT TERMINAL AND BANANA PRODUCTION PACKING PLANT IN SUPPORT OF BANANA INDUSTRY, BRGY. COGONON, NEW BATAAN, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱97.6M | 100% | High risk80 | Flagged0.038 |
| 19LA0157CUT-OFF CHANNEL AND CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER, BRGY. NGAN TO BRGY. TAMIA SECTION, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱69.7M | 100% | High risk77 | —-0.012 |
| 20LC0133CONSTRUCTION OF ROAD, BRGY. CANOCOTAN, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱49.5M | 100% | High risk77 | —-0.021 |
| 25LI0002SAN JOSE LEADING TO AWAO FALLS, BRGY. SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱4.9M | 100% | High risk74 | Flagged0.002 |
| 25LI0008TUBO-TUBO-MAMUNGA ROAD IN SUPPORT OF RICE, BANANA, AND OIL PALM PRODUCTION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱9.8M | 100% | High risk73 | Flagged0.005 |
| 18LA0102CONCRETING OF BONGKILATON ROAD LEADING TO MANDAYA VILLAGE, PANSAN FALLS, BONGKILATON CAVE AND TAGBUBUNLAS FALLS, BRGY. NGAN, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱19.6M | 100% | High risk73 | —-0.017 |
| 18L00097NABUNTURAN-MARAGUSAN ROAD INCLUDING ROW-K1450+567-K1450+810;K1453+061-K1453+312;K1456+315-K1457+581, | Region XI | Region XI | Completed | ₱153.5M | 100% | High risk65 | —-0.037 |
| 24LI0042CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER PHASE 2, PUROK 8, POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.7M | 100% | High risk64 | —-0.012 |
| 24LI0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGUSAN RIVER, PRK. 6 SECTION, BARANGAY POBLACION, MONKAYO, DAVAO DE ORO PHASE I | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.046 |
| 24LI0043CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER PHASE 1, PUROK 8, POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.046 |
| 18L00031WIDENING (2 INTO 4 LANES) OF MONTEVISTA-COMPOSTELA-MATI BDRY. RD. INCL. ROW(BRGY. OSMEÑA-BRGY. BANTC | Region XI | Region XI | Completed | ₱156M | 100% | High risk64 | —-0.053 |
| 23L00191CONSTRUCTION OF SITIO QUARRY, BARANGAY NGAN, COMPOSTELA - UPPER ULIP, MONKAYO ROAD, PACKAGE D, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱192M | 96% | High risk64 | —-0.004 |
| 20L00001CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ON SPECIFIC LOCATION ALONG DAANG MAHARLIKA (MN)(S00126MN), K1381+950 - K1396+704, COMPOSTELA VALLEY | Region XI | Region XI | On-Going | ₱167.8M | 96% | High risk64 | Flagged0.010 |
| 23LI0080CONSTRUCTION OF SITIO QUARRY, BARANGAY NGAN, COMPOSTELA - UPPER ULIP ROAD, PAPCKAGE E, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LI0068CONSTRUCTION OF ROAD, PANANSALAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.7M | 9% | High risk96 | Flagged0.060 |
| 23L00028CONSTRUCTION OF FLOOD CONTROL SYSTEM AT RIVER SIDE BARANGAY TAMIA, PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱95.5M | 47% | High risk80 | Flagged0.046 |
| 22L00037CONSTRUCTION OF CONCRETE ROAD - COGONON ROAD CONNECTING NEW BATAAN PUBLIC TRANSPORT TERMINAL AND BANANA PRODUCTION PACKING PLANT IN SUPPORT OF BANANA INDUSTRY, BRGY. COGONON, NEW BATAAN, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱97.6M | 100% | High risk80 | Flagged0.038 |
| 25LI0088CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, OSMEÑA TO POBLACION, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.4M | 66% | High risk95 | Flagged0.027 |
| 24LG0114CONSTRUCTION OF RESILIENT FLOOD CONTROL STRUCTURE (BOLSTERING COMMUNITY RESILIENCE), BARANGAY DON ENRIQUE LOPEZ, CITY OF MATI, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱48.2M | 100% | Medium risk55 | Flagged0.026 |
| 25LI0048CONCRETING OF SITIO SUGOD, BRGY. UNION TO SITIO LOWER ULIP, BRGY. POBLACION FMR, BRGY. UNION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱29.8M | 72% | Medium risk47 | Flagged0.019 |
| 25LI0075CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 2, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 66% | High risk93 | Flagged0.017 |
| 25LI0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (OSMEÑA BRIDGE SECTION), PHASE 1, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 67% | High risk93 | Flagged0.017 |
| 20L00001CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ON SPECIFIC LOCATION ALONG DAANG MAHARLIKA (MN)(S00126MN), K1381+950 - K1396+704, COMPOSTELA VALLEY | Region XI | Region XI | On-Going | ₱167.8M | 96% | High risk64 | Flagged0.010 |
| 25LI0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANAT RIVER R/S, MANAT BRIDGE DOWNSTREAM, LEADING TO AGUSAN RIVER, PHASE 1, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.6M | 82% | High risk93 | Flagged0.008 |
| 25LI0008TUBO-TUBO-MAMUNGA ROAD IN SUPPORT OF RICE, BANANA, AND OIL PALM PRODUCTION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱9.8M | 100% | High risk73 | Flagged0.005 |
| 17LA0144CONCRETING OF PUROK 2 TO PUROK 4, BRGY. OGAO FMR, NABUNTURANCOMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱11.9M | 100% | Medium risk38 | Flagged0.002 |
| 25LI0002SAN JOSE LEADING TO AWAO FALLS, BRGY. SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱4.9M | 100% | High risk74 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 20LA0001CONSTRUCTION OF MULTI PURPOSE BUILDING (BDRRMC) AT BRGY. NABOC, MONKAYO COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱2.2M | 100% | Low risk14 | —-0.084 |
| 177 | 18LA0055CONSTRUCTION OF MPB (DAY CARE CENTER), SITIO TOTOY, BRGY. HAGUIMITAN, MONKAYO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱2.1M | 100% | Low risk14 | —-0.084 |
| 178 | 22LC0170CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. STO. NIÑO, NEW CORELLA, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱2.5M | 100% | Low risk14 | —-0.089 |
| 179 | 19LA0283CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BRGY. LINOAN, MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱2.3M | 100% | Low risk14 | —-0.087 |
| 180 | 19LA0208CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BRGY. SAN VICENTE, MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱2.2M | 100% | Low risk14 | —-0.087 |
| 181 | 21LA0089CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (UNIFIED TRIBAL BUILDING) BARNGAY POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱2M | 100% | Low risk14 | —-0.085 |
| 182 | 17LA0126CONSTRUCTION OF MPB (COVERED COURT) IN BRGY. CAMANTANGAN, MUNICIPALITY OF MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱2.5M | 100% | Low risk14 | —-0.054 |
| 183 | 17LC0087REHABILITATION OF 2 STOREY MPB ( BARANGAY HALL ) BRGY. FLORIDA, KAPALONG, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱2M | 100% | Low risk14 | —-0.058 |
| 184 | 17LA0136CONSTRUCTION OF MPB (COVERED COURT) IN BRGY. NEW CALAPE, MUNICIPALITY OF MONTEVISTACOMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱2.3M | 100% | Low risk14 | —-0.055 |
| 185 | 17LA0137CONSTRUCTION OF MPB (COVERED COURT) IN BRGY. BANAGBANAG, MUNICIPALITY OF MONTEVISTACOMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱2.2M | 100% | Low risk14 | —-0.052 |
| 186 | 20LA0008CONSTRUCTION OF MULTI PURPOSE BUILDING (SENIOR CITIZEN BUILDING), BRGY. MAUSWAGON, MARAGUSAN COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱2M | 100% | Low risk14 | —-0.086 |
| 187 | 23LI0035CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT MRAGUSAN CES, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱2M | 100% | Low risk13 | —-0.086 |
| 188 | 17LC0081COMPLETION OF MPB ( BLEACHER WITH CANOPY FOR THE GYMNASIUM ), BRGY. NEW SAMBOG, NEW CORELLA, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱1.9M | 100% | Low risk12 | —-0.058 |
| 189 | 18LA0294CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, THREE (3) CLASSROOMS BUILDING AT BANKEROHAN ES, MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱4.5M | 100% | Low risk12 | —-0.039 |
| 190 | 18LA0297CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM BUILDING AT SAN VICENTE ES, MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱3.6M | 100% | Low risk12 | —-0.039 |
| 191 | 18LA0293CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM BUILDING AT BOAY ES, MONKAYO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱3M | 100% | Low risk11 | —-0.037 |
| 192 | 18LA0327COMPLETION OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM BUILDING AT BOAY ES, MONKAYO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1M | 100% | Low risk11 | —-0.036 |
| 193 | 18LA0325COMPLETION OF ONE (1) UNIT, ONE (1) STOREY, THREE (3) CLASSROOM BUILDING AT BANKEROHAN ES, MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱631.4K | 100% | Low risk11 | —-0.037 |
| 194 | 18LA0323COMPLETION OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM BUILDING AT SAN VICENTE ES, MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱535.6K | 100% | Low risk10 | —-0.038 |
| 195 | 19LA0258CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING CENTER) AT BRGY. SAN JOSE, MONKAYO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.9M | 100% | Low risk10 | —-0.084 |
| 196 | 18LA0009CONSTRUCTION OF MULTI-PURPOSE BUILDING (BLEACHER) BRGY. BABAG, MONKAYO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.7M | 100% | Low risk10 | —-0.084 |
| 197 | 19LA0261CONSTRUCTION OF MULTI-PURPOSE BUILDING (BLEACHER) AT BARANGAY LAGAB, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.8M | 100% | Low risk10 | —-0.084 |
| 198 | 19LA0209CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BRGY. BANKEROHAN SUR, MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.8M | 100% | Low risk10 | —-0.085 |
| 199 | 21LA0025CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SOCIAL HALL) BANKERUHAN ELEMENTARY SCHOOL, BARANGAY BANKEROHAN SUR, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱1.8M | 100% | Low risk10 | —-0.087 |
| 200 | 18LA0048COMPLETION OF BARANGAY HEALTH STATION, BRGY. KATIPUNAN, NEW BATAAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱582.3K | 100% | Low risk10 | —-0.085 |