Contractor dossier
11 projects on file, including joint ventures this contractor is part of.
Total projects
11
Total budget
₱352.8M
Average progress
94.1%
Completion rate
90.9%
Average risk score
43.7
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 9 | ₱329M | 43.7 | 0 | 92.7% |
| Cordillera Administrative Region | 2 | ₱23.9M | 43.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 5 | ₱197.1M | 42.8 | 0 | 86.9% |
| Bridges | 4 | ₱44.7M | 41.2 | 0 | 100.0% |
| Flood Control and Drainage | 2 | ₱111M | 51.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 23A00282CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG MESTIZO RIVER, BARANGAY TAMAG, VIGAN CITY, ILOCOS SUR | Region I | Region I | Completed | ₱96.5M | 100% | Medium risk58 | —-0.051 |
| 2 | 25A00469CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VIGAN-CABUGAO COASTAL/DIVERSION ROAD, PACKAGE 3, ILOCOS SUR | Region I | Region I | On-Going | ₱93.6M | 35% | Medium risk54 | —-0.020 |
| 3 | 23A00133CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VIGAN-CABUGAO COASTAL/DIVERSION ROAD, PACKAGE 1, ILOCOS SUR | Region I | Region I | Completed | ₱76.7M | 100% | Medium risk49 | —-0.073 |
| 4 | 23A00340SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF BRIDGE, BRGY. BADIO, PINILI, ILOCOS NORTE | Region I | Region I | Completed | ₱24.1M | 100% | Medium risk48 | —-0.048 |
| 5 | 24AC0016REPLACEMENT OF CABANGTALAN BRIDGE, BRGY. CABANGTALAN, SINAIT, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱11.8M | 100% | Medium risk45 | —-0.043 |
| 6 | 23AC0124REPAIR / REHABILITATION OF PANTAY DAYA BRIDGE (B04520LZ) ALONG VIGAN - STA. CATALINA ROAD, K0408+288, BRGY. PANTAY DAYA, VIGAN CITY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱5.8M | 100% | Medium risk45 | —-0.045 |
| 7 | 24PD0012REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS-OUTLOOK DRIVE K0253+731-K0253+956 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱14.2M | 100% | Medium risk44 | —-0.080 |
| 8 | 24AC0042CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BUSIING CEN-SUR, SAN ILDEFONSO, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱14.5M | 100% | Medium risk44 | —-0.068 |
| 9 | 24PD0023SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES:CONSTRUCTION OF BY-PASS AND DIVERSION ROADS OF OUTLOOK DRIVE TO BAGUIO-ITOGON ROAD DIV | Cordillera Administrative Region | Baguio City DEO | Completed | ₱9.7M | 100% | Medium risk43 | —-0.081 |
| 10 | 23AC0127REPAIR / REHABILITATION OF ROXAS BRIDGE (B04521LZ) ALONG VIGAN - SAN VICENTE ROAD, K0408+ (-886), BRGY. 1, VIGAN CITY, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱2.9M | 100% | Low risk27 | —-0.043 |
| 11 | 24AC0058NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS-VIGAN-STA CATALINA RD-K0408+408, STA CATALINA, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱3M | 100% | Low risk23 | —-0.082 |