Contractor dossier
52 projects on file, including joint ventures this contractor is part of.
Total projects
52
Total budget
₱169.9M
Average progress
91.5%
Completion rate
67.3%
Below 70%
Average risk score
42.0
Medium risk on average, out of 100
Flagged as unusual
2
3.8% of their projects
Risk mix
Exhibit A
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 30 | ₱74.1M | 29.8 | 0 | 94.1% |
| Roads | 17 | ₱74.1M | 61.0 | 1 | 90.8% |
| Bridges | 3 | ₱15.1M | 47.3 | 1 | 69.6% |
| Flood Control and Drainage | 2 | ₱6.7M | 54.4 | 0 | 93.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AA0284SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY ESTANCIA, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk81 | —-0.025 |
| 25AA0424CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMP OF RD ALONG PASUQUIN BY-PASS ROAD, PASUQUIN, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk78 | —-0.051 |
| 25AA0276SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY 9 SUSUGAEN, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.050 |
| 23AA0297SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG NATIONAL ROAD, POBLACION, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 86% | High risk78 | —-0.013 |
| 23AA0040CONS./IMP. OF ACCS. RDS. LEAD'G TO TRADES, IND. AND ECO. ZONES(RDS. LVRGING LINKAGES FOR IND. AND TRADE INFRA. PROG.-ROLL-IT) AMPON NCC RD CONNTG. MINIA. ITEMS SOUV.MAKING AREA AND NTL. HIGHWAY IN SUP. TO TOURISM (SOUV.-MAKING IND.), BRGY. NAGSUROT,BURGOS | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk77 | Flagged0.003 |
| 24AA0270CONSTRUCTION (COMPLETION) OF MULTI PURPOSE BUILDING, BARANGAY SAOIT, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk77 | —-0.038 |
| 24AA0387BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI PURPOSE BUILDING, ( COVERED COURT ) BARANGAY SAN ISIDRO, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 75% | High risk77 | —-0.028 |
| 24AA0371BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI PURPOSE BUILDING IN BARANGAY BOBON, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 23% | High risk77 | —-0.009 |
| 23AA0216SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BAYOG, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱7.5M | 80% | High risk71 | —-0.028 |
| 23AA0213SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF AGAGA-TANAP ROAD, BARANGAY AGAGA, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱7.5M | 63% | High risk71 | —-0.019 |
| 23AA0212SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF TANAP-NAGSUROT ROAD, BARANGAY TANAP, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱7.5M | 100% | High risk71 | —-0.034 |
| 24AA0231BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- IMPROVEMENT OF ROAD, BARANGAY 9 STA. ANGELA, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.9M | 100% | High risk71 | —-0.080 |
| 24AA0230BIP- ACCESSROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TOMAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENTOF ROAD, BARANGAY 7 - A NUESTRA SENORA DEL NATIVIDAD, LAOAGCITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.9M | 100% | High risk71 | —-0.081 |
| 23AA0328CONSTRUCTION OF MULTI-PURPOSE BUILDING (TWO (2)- UNIT BARRACKS), BARANGAY BOBON, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱24M | 38% | High risk71 | —-0.006 |
| 24AA0283CONSTRUCTION (COMPLETION) OFMULTI-PURPOSE BUILDING, BARANGAY AGAGA,BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱6.8M | 86% | High risk70 | —-0.030 |
| 18AA0410CONC. OF BRGY. PAGALI FMR, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱5M | 100% | High risk70 | —-0.026 |
| 24AA0173BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- IMPROVEMENT OF ROAD ALONG INAC, BARANGAY POBLACION 2, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.9M | 100% | High risk70 | —-0.041 |
| 24AA0178SIPAG - ACCESS ROADS AND/ORBRIDGES FROM THE NATIONAL ROAD/S LEADING TOMAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESIMPROVEMENTOF ROAD, BARANGAY 60-B, MADILADIG,LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.9M | 100% | High risk69 | —-0.080 |
| 24AA0183SIPAG - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD, P. GOMEZ ST., BARANGAY 2,3,4,&5, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.9M | 100% | High risk69 | —-0.080 |
| 25AA0232SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DATAG-DAMPIG BRIDGE, BARANGAY SAN ISIDRO, DUMALNEG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 15% | High risk68 | Flagged0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AA0232SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DATAG-DAMPIG BRIDGE, BARANGAY SAN ISIDRO, DUMALNEG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 15% | High risk68 | Flagged0.029 |
| 23AA0040CONS./IMP. OF ACCS. RDS. LEAD'G TO TRADES, IND. AND ECO. ZONES(RDS. LVRGING LINKAGES FOR IND. AND TRADE INFRA. PROG.-ROLL-IT) AMPON NCC RD CONNTG. MINIA. ITEMS SOUV.MAKING AREA AND NTL. HIGHWAY IN SUP. TO TOURISM (SOUV.-MAKING IND.), BRGY. NAGSUROT,BURGOS | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk77 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25AA0284SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY ESTANCIA, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk81 | —-0.025 |
| 2 | 25AA0424CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMP OF RD ALONG PASUQUIN BY-PASS ROAD, PASUQUIN, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk78 | —-0.051 |
| 3 | 25AA0276SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY 9 SUSUGAEN, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.050 |
| 4 | 23AA0297SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE ALONG NATIONAL ROAD, POBLACION, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 86% | High risk78 | —-0.013 |
| 5 | 23AA0040CONS./IMP. OF ACCS. RDS. LEAD'G TO TRADES, IND. AND ECO. ZONES(RDS. LVRGING LINKAGES FOR IND. AND TRADE INFRA. PROG.-ROLL-IT) AMPON NCC RD CONNTG. MINIA. ITEMS SOUV.MAKING AREA AND NTL. HIGHWAY IN SUP. TO TOURISM (SOUV.-MAKING IND.), BRGY. NAGSUROT,BURGOS | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk77 | Flagged0.003 |
| 6 | 24AA0270CONSTRUCTION (COMPLETION) OF MULTI PURPOSE BUILDING, BARANGAY SAOIT, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk77 | —-0.038 |
| 7 | 24AA0387BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI PURPOSE BUILDING, ( COVERED COURT ) BARANGAY SAN ISIDRO, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 75% | High risk77 | —-0.028 |
| 8 | 24AA0371BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI PURPOSE BUILDING IN BARANGAY BOBON, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 23% | High risk77 | —-0.009 |
| 9 | 23AA0216SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BAYOG, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱7.5M | 80% | High risk71 | —-0.028 |
| 10 | 23AA0213SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF AGAGA-TANAP ROAD, BARANGAY AGAGA, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱7.5M | 63% | High risk71 | —-0.019 |
| 11 | 23AA0212SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF TANAP-NAGSUROT ROAD, BARANGAY TANAP, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱7.5M | 100% | High risk71 | —-0.034 |
| 12 | 24AA0231BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- IMPROVEMENT OF ROAD, BARANGAY 9 STA. ANGELA, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.9M | 100% | High risk71 | —-0.080 |
| 13 | 24AA0230BIP- ACCESSROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TOMAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENTOF ROAD, BARANGAY 7 - A NUESTRA SENORA DEL NATIVIDAD, LAOAGCITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.9M | 100% | High risk71 | —-0.081 |
| 14 | 23AA0328CONSTRUCTION OF MULTI-PURPOSE BUILDING (TWO (2)- UNIT BARRACKS), BARANGAY BOBON, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱24M | 38% | High risk71 | —-0.006 |
| 15 | 24AA0283CONSTRUCTION (COMPLETION) OFMULTI-PURPOSE BUILDING, BARANGAY AGAGA,BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱6.8M | 86% | High risk70 | —-0.030 |
| 16 | 18AA0410CONC. OF BRGY. PAGALI FMR, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱5M | 100% | High risk70 | —-0.026 |
| 17 | 24AA0173BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- IMPROVEMENT OF ROAD ALONG INAC, BARANGAY POBLACION 2, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.9M | 100% | High risk70 | —-0.041 |
| 18 | 24AA0178SIPAG - ACCESS ROADS AND/ORBRIDGES FROM THE NATIONAL ROAD/S LEADING TOMAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESIMPROVEMENTOF ROAD, BARANGAY 60-B, MADILADIG,LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.9M | 100% | High risk69 | —-0.080 |
| 19 | 24AA0183SIPAG - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD, P. GOMEZ ST., BARANGAY 2,3,4,&5, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.9M | 100% | High risk69 | —-0.080 |
| 20 | 25AA0232SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DATAG-DAMPIG BRIDGE, BARANGAY SAN ISIDRO, DUMALNEG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 15% | High risk68 | Flagged0.029 |
| 21 | 18AA0447RENOVATION OF RHU BLDG., PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱4.9M | 100% | Medium risk58 | —-0.041 |
| 22 | 25BA0008ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGE: SAVIDUG BRIDGE (B00003ST) ALONG SAN VICENTE - SAVIDUG - CHAVAYAN- SUMNANGA - NAKANMUAN ROAD | Region II | Batanes DEO | On-Going | ₱9.5M | 94% | Medium risk49 | —-0.019 |
| 23 | 23AA0354CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING, (COVERED COURT), BARANGAY UTOL, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱3.4M | 100% | Medium risk39 | —-0.032 |
| 24 | 23AA0355CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING (COVERED COURT), BARANGAY BAYOG, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱1.9M | 100% | Medium risk35 | —-0.078 |
| 25 | 22AA0069CONSTRUCTION (COMPLETION) OF MULTI PURPOSE BUILDING, BARANGAY 31 CALIOET LIBONG, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱2M | 100% | Medium risk34 | —-0.080 |